HomeMy WebLinkAboutWQ0014391_Monitoring - 03-2022_20220421 ti
DWR - NonDischarge Monitoring Report Submittal
'
•4 ..
NORTH CAROLINA
Enrlranmenlel QHaflly
Monitoring Report Submittal
..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Permit Number#* WQ0014391
Name of Facility:* Builders First Source
Month:* March Year:* 2022
Report Information
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR BFS NDMR 3-22.pdf 5.5MB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2,NDMLR,GW-59).
Confirmation Email Address:* Biowater@aol.corn
Name of Submitter:* Randall C Jarrell
Signature:
Date of submittal: 4/21/2022
This will be filled in automatically
Initial Review
.............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Reviewer: Gerald,Wanda
Is the project number correct?* WQ0014391
Is the monitoring report accepted?* Yes No
Regional Office* Raleigh
Accepted Date: 5/9/2022
FORM: NDMR 05-16 NON-DISCHARGE MONITORING REPORT(NDMR) Page t of $
Permit No.: WQ0014391 Facility Name: Builders FirstSource-Apex Yard WWTF county: Chatham Month: March Year: 2022
PPI: 002 Flow Measuring Point: 2 Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: ❑tnfuent 2 Effluent ❑Groundwater Lowering ❑Surface Water
Parameter Code --o- 50050 00310 31616 00610 00625 00620 00600 00400 00665 00530
c . N
L ra 0 E as re-a C C i N
N in
0 E N w N -o u)
E w o p v o o u o i r 0 = a t w C 'O
p U F- H U) LL m LL o E Y Z F. F- 2 F rn co
W U U Q w Z 2 t 3
O a v)
24-hr hrs GPD mg/L #/100 mL mg/L mg/L mg/L mg/L su mg/L mg/L
1 08:10 0.17 7,857 20 <1.0 51 59 24 98 V 21 12
2 7,857
3 7,857
4 7,857
5 7,857
6 7,857
7 09:25 0.33 7,857 6.69
8 967 '
9 967
10 967
11 967
12 967
13 967 _
14 967
15 08:45 0.33 967
16 967
17 967
18 967
19 967
20 967
21 967
22 15:35 0.58 967 6.62 _
23 967
24 967
25 967 _ _
26 967
27 967
28 967
29 13:50 0.5 967 6.61
30 800
31 800
Average: 2,512 20.00 1.00 51.00 59.00 24.00 98.00 21.00 12.00
Daily Maximum: 7,857 20.00 1.00 51.00 59.00 24.00 98.00 6.69 21.00 _ 12.00
Daily Minimum: 800 20.00 1.00 51.00 59.00 24.00 98.00 6.61 21.00 12.00
Sampling Type: Estimate Grab Grab Grab Grab Grab Grab Grab Grab Grab
Monthly Limit: 3,750 30 200 15 30
Daily Limit:
Sample Frequency: Monthly 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year Weekly 3 X Year 3 X Year
FORM: NDMR 05-16 NON-DISCHARGE MONITORING REPORT(NDMR) Page of 2
Sampling Person(s) Certified Laboratories
Name: Randall Jarrell Name: ENCO
Name: Name: Wastewater Management, L.L.C.
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? E Compliant ❑Non-Compliant
If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective
action(s)taken.Attach additional sheets if necessary.
Operator in Responsible Charge(ORC)Certification Permittee Certification
ORC: Randall Jarrell Permittee: Goldston -Apex Properties, L.L.C.
Certification No.: 23925 Signing Official: Randall Jarrell
Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC
Has the ORC changed since the previous NDMR? ❑Yes 0 No Phone Number: Permit Expiration:
Signat re Date Signature Date
By this signature,I certify that this report is accurrate and complete to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for
gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am
aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page - of 8
Permit No.: WQ0014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I County: Chatham Month: March Year: 2022
Field Name: 01-1A Field Name: 01-1B Field Name: 01-2A Field Name: 01-2B
Did irrigation occur
Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19
at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop:
El YES 0 NO Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4
Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48
Weather Freeboard Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES E NO Field Irrigated? ❑YES 0 No
w
"0 r
a' a °.? a' v v rn E , a' v v °' E co a' v '° rn E rn a' o n c, E rn
o as �° °' to E ' m .°.' >, c c E ' a' ;; > c � ? c E m a' ;; >, c 32` c E m y :' >, c c Tc
o V a' C. CO' � 2 ° a E a' :0 co E ° a 3 a E rn ° a E o ° � a Era 0 co Env ° a E a 0 ° E � �
0 E •5 .2 a O. o G I •. 0 o R = a o o_ i— •: o o R = o o a 1- •a' o o m = o o a H rn p c m = o
N Cl) 0 Q _ J J Q _ J J Q _ J a J > Q _ J J
a, I- a
°F in ft ftgal min in ingal min in ingal min in in
gal min in in
1
2
3
4
5
6
7 CL 69 0 4.7
8
9
10 _
11
12
13
14
15 C 43 2.16 4.2
16
17
18
19 - -
20 _
21
22 C 76 2.09_ 3.7
23
24
25
26
27
28
29 C 47 0.54_ 3.6
30
31
Monthly Loading: 0 'V / 0.00 % o r / 0.00 -% 0 % A 0.00 P 0 % 0.00
12 Month Floating Total(in): ///C�%� , 5.96 �� - .����� 5.96 J' Z A 5.82 ' tr Z / r /
FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page of $
Permit No.: WQ0014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I county: Chatham 1 Month: March Year: 2022
Field Name: 01-3A Field Name: 01-3B Field Name: 01-4A Field Name: 01-4B
Did irrigation occur
Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19
at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop:
P� P: p:
❑YES 0 NO Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4
Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48
Weather Freeboard Field Irrigated? ❑YES NO Field Irrigated? ❑YES E NO Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES 0 No
;u =
o
> ° c � a E m d d > c c m m CD >, C E c E m an d >, c c E E . m >,
U Q 3 Q. E o• E a E •iy a E a c a E a E
>,Q c o = o o R = o o � = o o0 °
°F in ft ft gal min in in gal min in in gal min in in gal min in in
1
2
3
4
5
6
7 CL 69 0 4.7
8
9
10
11
12
13 _
14
15 C 43 2.16 4.2
16
17
18
19
20
21 l _22 C 76 2.09 3.7
23
24
25
26
27
28
29 C 47 0.54 3.6
30
31
Monthly Loading: 0 r 0.00 /j 0 r / 0.00 0 ' 0.00 2' / 0 / 0.00 V
12 Month Floating Total(in): 4r/ 5.68 5.68 �O/O/O�%/; ������ ����� 5.80 5.70
FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of e
Permit No.: WQ0014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I County: Chatham Month: March Year: 2022
Field Name: 02-1A Field Name: 02-1 B Field Name: 02-2A Field Name: 02-2B
Did irrigation occur
Area(acres): 0.18 Area(acres): 0.22 Area(acres): 0.28 Area(acres): 0.23
at this facility? Cover Crop: Cover Cover CoverCro
p� p� p� p:
❑YES rvo Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2
Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11
Weather Freeboard Field Irrigated? ❑YES El NO Field Irrigated? ❑YES El NO Field Irrigated? ❑YES El NO Field Irrigated? ❑YES El NO
12) i c
w o y a> m y v o E T rn m -0 v a� E T rn m o a o E a� m a a a� E o
>, 0 R w R nm E °' ) a; >, C 3 L C E a) m 43 >, E 7 - C E m D13 >, c 7 Tc E °' my3 >, c
as y 3 a E T E =a _3 a E m v E 3 v g a E 'a E v _3 Q _E := 'v E
E •2- ° > a o a 1= •' o o R = c o a i= o o cxa = o o a rn o o m = o o a iz 2 O p N 0 2
CIS E a o m > Q > Q - > Q -I i > ¢ -I 0
°F in ft ft gal min in in gal min in in gal min in in gal min in in
1 _
2
3
4
5
6
7 CL 69 0 4.7
8
9
10
11
12
13
14
15 C 43 2.16 4.2
16
17
18
19
20
21
22 C 76 2.09 3.7
23
24
25
26
27
28 _
29 C 47 0.54 3.6
30
31 _ ��// �///Monthly Loading: 0 r/ 0.00 r / 0 � / 0.00 j/ 0 r 0.00 'r �� 0 % &' 0.00 l A
4712 Month Floating Total(in): VJ' 9 V 7.40 /����/? ✓��' 6.05 6V 4:ver 2', J��// 4.76 //'/�� 5.72 /��
FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page c of Q
Permit No.: WQ0014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I county: Chatham Month: March Year: 2022
Field Name: 02-3A Field Name: 02-3B Field Name: 02-4A Field Name: 02-4B
Did irrigation occur
Area(acres): 0.32 Area(acres): 0.25 Area(acres): 0.28 Area(acres): 0.32
at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop:
❑YES NO Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2
Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11
Weather Freeboard Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES E NO Field Irrigated? ❑YES E NO Field Irrigated? ❑YES 0 NO
m E °
w
a ° a m o) nR Ea) a) 0.) >, a = � c Ey a, m >,c = Lc Em amd >, c c ` c Em ) >,MS c c - c
I V m `� Era 'v E 5 '5 E R - v E '3v E 65 _ 'v .E '3 2 E co % 'a E 3v
ci L c 'Q .2 - -0- a F 2 Q c "X o m O Q i- c 0 2 •x o `° C G i- C) R `° .%Rog a rn m m '% o R
e >,ao = o o g = o c oo = o oa oo ,� = o
N y !n tc p, Q _ J J 9 Q _ J J Q _ —I J > a _ J J
io F a 0 °
m U)
°F in ft ft gal min in in gal min in in gal min in in gal min in in
1
2 _
3
4
_ ._5
6
7 CL 69 0 4.7
-
8
9
-
-
10
11 ,
12
13
14
15 C 43 2.16 4.2 _
16 _
17
18
19 _ _
20
21
22 C 76 2.09 3.7 -
23
24
25
26
27 _
28
29 C 47 0.54 3.6
30
31
Monthly Loading: 0 zri/j 0.00 / z 0 // 0.00 % / 0 , 0.400 �� 0 �,✓7// 0.00 '
12 Month Floating Total(in): // /�/iii1 6.58 ��/, /✓� 8.42 ����� j%�O��O� ����/// Z ���'4 6.41
FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page 1 of
Did the application rates exceed the limits in Attachment B of your permit? E Compliant ❑Non-Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Compliant ❑Non-Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit? E Compliant ❑Non-Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site? 0 Compliant ❑Non-Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit? E Compliant ❑Non-Compliant
If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective
action(s)taken.Attach additional sheets if necessary.
Operator in Responsible Charge(ORC)Certification Permittee Certification
ORC: Randall Jarrell Permittee: Goldston-Apex Properties, L.L.C.
Certification No.: 23925 Signing Official: Randall Jarrell
Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? ❑Yes 0 No Phone Number: 919-201-0347 Permit Exp.: 3/31/21
74/1 211 zz ,. `-i12-t1 �Z
Signature Date Signature Date
By this signature,I certify that this report is accurrate and complete to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted.Based on my
inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the
information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant
penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Builders First Source
12 Month Rolling Total Application In Inches
2022 2022 2022 2021 2021 2021 2021 2021 2021 2021 2021 2021 2022
Field Jan Feb March April May June July August Sept Oct Nov Dec Total
1 5.96 0 0 0 0 0 0 0 0 0 0 0 5.96
2 5.96 0 0 0 0 0 0 0 0 0 0 0 5.96
3 5.82 0 0 0 0 0 0 0 0 0 0 0 5.82
4 5.74 0 0 0 0 0 0 0 0 0 0 0 5.74
5 5.68 0 0 0 0 0 0 0 0 0 0 0 5.68
6 5.68 0 0 0 0 0 0 0 0 0 0 0 5.68
7 5.8 0 0 0 0 0 0 0 0 0 0 0 5.8
8 5.7 0 0 0 0 0 0 0 0 0 0 0 5.7
9 0 0 0 0 0 5.46 0 0 1.94 0 0 0 7.4
10 0 0 0 0 0 4.46 0 0 1.59 0 0 0 6.05
11 0 0 0 0 0 3.48 0 0 1.28 0 0 0 4.76
12 0 0 0 0 0 4.2 0 0 1.52 0 0 0 5.72
13 0 0 0 0 0 3.07 0 0 3.51 0 0 0 6.58
14 0 0 0 0 0 3.93 0 0 4.49 0 0 0 8.42
15 0 0 0 0 0 3.45 0 0 4.01 0 0 0 7.46
16 0 0 0 0 0 2.96 0 0 3.45 0 0 0 6.41