Loading...
HomeMy WebLinkAbout20210885 Ver 1_More Information Received_20220506Staff Review Form NORTH CAROLINA Envlronm¢ntcl Qvofiry Updated September 4, 2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* 20210885 Version* 1 Is this project a public transportation project?* Yes • No Reviewer List: * Colleen Cohn:eads\cmcohn Select Reviewing Office: * Raleigh Regional Office - (919) 791-4200 Does this project require a request for payment to be sent?* Yes No Project Submittal Form * Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 5/3/2021 Is this supplemental information that needs to be sent to the Corps?* Yes No Project Contact Information Name: Nancy Oberle Who is submitting the information? Email Address: nancy.oberle@threeoaksengineering.com Project Information Existing ID #: 20210885 20170001 (no dashes) Project Name: Existing Version: 1 Tupelo Junction Residential Cluster Development Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Orange Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 19-0185 PP ROAD- C-12-C- BEELINE LANE 10+00- 822.92KB 14+51 _05-03-2022. pdf Only pdf or kmz files are accepted. Describe the attachments or comments: The original application was to cover work associated with directionally -boring a sewer line under Lake Michael (the stream with that classification name and not the lake itself). The bore was to start and end outside of the riparian buffer and go under the stream; however, the presence of bedrock was going to result in the line casement breaching the streambed in a small area. Therefore, a temporary dewatering plan was developed for installation and the client was planning to install sills to promote re -accumulation of native substrate over the casement to restore the stream bed. After the application and fee were submitted the client informed Three Oaks that there was more bedrock than anticipated and the directional bore would no longer be feasible. Therefore, they are opting to temporarily open trench the stream bed to install the sewer line. This will require a larger dewatering area than what was included in the application and also result in more temporary impacts to the stream (original permit application included 6 linear feet of temporary fill in the stream; current plan proposes 34 linear feet of temporary stream fill). The casement will still also be exposed in a small area after installation, so sills would still be proposed to allow for substrate accumulation after the line is covered. There will also be some minor buffer impacts, which we will coordinate with the County and/or Mebane to receive authorization for those impacts. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: a Submittal Date: Is filled in automatically. ent Drawings\19-0185_PP ROAD- C-12.dwg, 5/3/2022 4:03:00 PM, 1 N:\2019\19-0185.010 Lebanon Rd LLC - The Landing at Lake Michael\Civil\Cu 0 168 LF 30" RCP @ 1.72% 90° HORIZ. BEND 45 x 45 RESTRAINED JT. FOR 12" DIP WATER LINE 12" DIP WATER LINE o'\ PI: 25+05.5'5 CB 28 T.C. = 612.95' S INV IN = 602.90' W INV OUT = 602.80' 0 0 Ns 184 LF 15" RCP @ 2.33% ---12" DIP WATER LINE 11 12" X 8" TEE 52 CB 37 (2) - 12" GV 7927 SF T.C. = 612.02' (1)-8"GV 0.18 c N INV OUT = 607 50' 12x8 REDUCER FIRE HYDRANT SSEMBLY (TYP.) 1SS- 22LF36"RCP @2.01% loll ii,.�;;i 77 LF 24" RCP @ 2.44% 1 J B-28A T.C. = 612.84' W INV IN = 602.86' E INV IN = 602.36' N INV OUT = 602.26' 54 7582 SF 0.17 AC CB 29 T.C. = 610.77' W INV OUT = 606.25' • 33 LF 15" RCP @ 1.00% CB 38 T.C. = 612.02' S INV IN = 607.17' W INV IN = 604.83' E INV OUT = 604.73' 20'[DRAINAGE EASEMENT j_ DI 2 Y.I. INLET = 611.95' S INV IN = 607.00' N INV OUT = 606.00' 48LF18"RCP@1.04% 12+00 CB 35 T.C.= 618.11': SINV IN=611.67'= WINV IN=611.67'] N INV OUT = 610.00' 8" DIP WATER LINE oS TRIANGLE (TYP.) PI: 12+85.67 BEELINE LANE 70' X 10' SIGHT CB 38A T.C. = 612.77' S INV IN = 605.50' E INV OUT = 605.40' (31 BB, 50' WIDE PUBLIC RIGHT OF WAY) 0.17 AC CB 49 T.C. = 614.92' S INV IN = 608.32' W INV IN = 608.32' N INV OUT = 608.22' 33 LF 15" RCP @ 1.01% 111 LF24"RCP @3.19%- I et 41 'BEELINE LANE 33 LF 15" RCP @ 1.00% CB 32 T.C. = 618.11' E INV OUT = 612.00' FIRE HYDRANT ASSEMBLY (TYP.) 8" X 8" CROSS A` �4)-8"GV • (to, SPILL CURB CB 33 T.C. = 616.80' - N INV OUT = 611.28' 14+00 MH 18) 33 LF 15" RCP @ 1.01% CB 34 T.C. = 616.80' SINVIN=610.95' NE INV OUT = 610.85' 44LF15"RCP@4.77% 8074 SF 0.19 AC CB 48 T.C. = 615.02' SW INV IN = 608.75' E INV OUT = 608.65 8"DIWWATER LINE 33 7200 SF 0.17 AC 0 9 DEADMAN AND 2" BLOW -OFF ASSEMBLY 14+51 END ROAD CONSTRUCTION STA 14+18 CONTRACTOR SHALL INSTALL BARRICADES OR END OF RED DIAMOND SIGN MARKERS BEYOND PAVEMENT EXTENTS - COORDINATE W/ CITY OF MEBANE EX. 10" SANITARY SEWER OUTFALL AND 25' SANITARY SEWER EASEMENT 1� ± 34 LF OF LINEAR STREAM IMPACT 4414 AT EXPOSURE OF OPEN CUT I DOGHOUSE MANH OVER EXISTING 10" SANITARY SEWER OUTFALL EXISTING RUN = 393.33 LF, 10" SANITARY SEWER @ 0.72% PHASE III IMPROVEMENTS O. I 1 SAjVIT I 1 I I I RY SEWE F UT1IALL A� W/ 30' EASEMEN OPEN CUT NEW RESTRAINED JOINT MAIN AND STEEL ENCASEMENT PIPE SEE PROFILE - BYPASS PUMP ZONE 2 = 442 SF I ZONE 1 = 707 SF 1 1 APPROX. LOCATION OF SPECIAL SEDIMENT BAG IM .EII NW/I MILL CREEK STREAM CENTERLINE IMPERVIOUS DIKES FLOODWAY SCM #2 100-YR FLOODPLAIN FES 4 INV OU = 594.90' I 36 LF 30" RCP @ 0.56% ZONE 2 = 417 SF ZONE 1 = 633 SF DEWATERING AREA : ±1,002 SF WETLANDS (TIP.) II RIPARIAN FFER NE 2 a ZONE X CB 44 T.C. = 600.00' S INV IN = 595.60' E INV OUT = 595.10' 1 12+00 ZONE AE CB 41 T.C. = 606.11' W INV IN = 599.27' S INV IN = 599.27' N INV OUT = 599.17' & GUTTER 8x6REDUCER & 6" G.V. 5' CONCRETE SIDEWALK (MH 12) O / FIRE HYDRANT ASSEMBLY 500 YEAR FLOOD LINE 100 YEAR FLOOD LINE SANITARY SEWER OUTFALL 'A' / 8" DIP WATER LINE CB 42 T.C. = 6( E INV 01 WATER SERVICE LATERAL (TYP.) 37 7200 SF 0.17 AC SANITARY SEWER CLEANOUT (TYP.) 38 7577 SF 0.17 AC / / / / a / / ,/ / / // / / 45' x 45' RESTRAINED JT. FOR 12"DIP WATER LINE 625 615 610 605 600 595 590 585 GRADE BREAK STA = 10+20.00 ELEV = 612.80 BVOS: 10+57.50 PVI STA:10+95.00 PVI ELEV-.61-1.83 LOW PT STA:10+82.91 LOW PT ELEV:612.15 K:19.64 LVC:75.00 BVCE:612.32 1 M m 0 STA: 10+81.3 n CD 00 EXISTING CL GRADE EVCS: 11+ co co 0 co MH 19: RIM = 613.10' STA: 10+00.00, 0.0' INV IN = 593.50' (S (415), S) INV OUT = 603.80' (MH 14 W) 15" RCP 18" RCP NEW CL GRADE 24" RC 18" MIN. CLEARANCE 18" RCP CO 0 MH 14: ELEV = 616.29 co oo oi ELEV = 616.51 (CONC. SLIDE) o GRADE BREAK STA = 14+18.00 ELEV = 618.00 P.L. STA = 14+50.67 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 625 620 610 MH 18: 605 600 595 590 585 14456657 605 600 595 590 585 580 SEWER INSTALLATION NOTES: 1. SEWER LOCATION SHALL BE DEWATERED PRIOR TO BORING OPERATIONS. CONTRACTOR SHALL INSTALL TEMPORARY IMPERVIOUS DIKES OR COFFERDAMS AS NEEDED TO DEWATER THE BORE LOCATION. 2. IN CONJUNCTION WITH THE IMPERVIOUS DIKE INSTALLATION, THE CONTRACTOR SHALL ALSO INSTALL A SPECIAL SEDIMENT BAG BASIN ON THE DOWNSTREAM SIDE OF THE BORE TP DISCHARGE THE BY-PASS PUMP WATER. 3. ONCE THE LOCATION IS DEWATERED, PERFORM OPEN CUT OPERATIONS TO INSTALL ENCASEMENT AND SEWER PIPE. PRIOR TO REMOVING DIKES, INSTALL SILLS JUST UPSTREAM OF CROSSING TO PROMOTE NATURAL STREAM RESTORATION FOR COVER OVER ENCASEMENT PIPE. 4. PHASE 1: INSTALL PUMP -AROUND AND SLEEVE UNTIL BYPASS IS NO LONGER NEEDED. 5. REMOVE SPECIAL SEDIMENT BAG WITH PROPER DISPOSAL OF COLLECTED SEDIMENT. 6. PHASE 2: REMOVE BYPASS AND COMPLETE INSTALLATION TOWARD MH 10. NEW C/L GRADE 4:1 SLOPE CENTERLINE OF STREAM MILL CREEK EXISTING C/L GRADE RESTRAINED JOINT ArAKIAIPIPIIAlrararIIVAIrArAI MH 10: (DOGHOUSE MH) 100 YR. FLOOD ELEV. = 590.6± 7- TOP OF CASING ELEV. = 586.14 SEE NOTES ON THIS SHEET FOR SEWER INFORMATION 120 LF 16" STEEL ENCASEMENT PIP (0.25" THICKNESS IN.) WITH 140 LF (MIN.) 8" DIP RESTRAINED JOINT PIPE FROM DOGHOUSE M.H. TO 10' BEYOND CASING MH 11: 01. 605 600 595 590 585 580 NOTE: SEE SHEETS C-6 THRU C-12 FOR INTERSECTION & CUL-DE-SAC RADII AND SHEETS G-3 THRU G-6 FOR ELEVATIONS AT INTERSECTIONS AND CUL-DE-SACS. MH 12: STA. 13+ 07.27 GRAPHIC SCALE 40 0 10 20 40 80 ci m o DMC I DMC GS DMC DMC DMC 11/24/2020 DMC DATE BY) 03/25/2022 08/04/2021 02/04/2021 01/25/2021 I SEWER STREAM CROSSING —REVISE FOR OPEN CUT I SEWER BORE CROSSING REVISIONS FOR PERMITTING REMOVE SMALL SHELTER, REARRANGE PLAYGROUND, PICNIC SHELTER AND OUTDOOR PINGPONG AT RECREATION AREA 411 RAISE ALL HOUSE PAD ELEVATIONS 8" TRC SUBMITTAL #4 REVIEW COMMENTS TRC SUBMITTAL #3 REVIEW COMMENTS TRC SUBMITTAL #2 REVIEW COMMENTS TRC SUBMITTAL #1 REVIEW COMMENTS REVISIONS ••.- co L.0 71- cr) C \I N- ENGINEERING SERVICES DRAWING ALTERATION zOirc_500:z1102(o_,Yxi_ °So (0<, CO> lZ 51C1C7 cr: '0, 0%0ZU oz< C HC .LZ 0, - cl LU 01:Z) uz0e EU; 3<oLn<C )IL U :0; <H5 1)DL oit (PROJECT ENGINEER/ARCHITECT TAS (TIM.SMITH@SUMMITDE.NET) PROJECT MANAGER RFH (RANDY.HALL@SUMMITDE.NET) >- co DMC (DON.CHITTY@SUMMITDE.NET 0 CV CV CD DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court 00 Cal cri 4,0 Lil LIJ LIJ LIJ PROJECT NO. 19-0185 DRAWING NAME: 19-0185_PP ROAD- C-12.dwg SHEET NO.