Loading...
HomeMy WebLinkAboutNC0031046_Email_202205095/9/22, 11:34 AM Mail - Denard, Derek - Outlook https://outlook.office365.com/mail/id/AAQkADdhYTVmZDBlLTE5ZDctNGI5MC04ZjliLWU4MjVhZTBhMmJkMgAQAAKPoIRTiEococMkR%2BmCNAA%…1/3 Re: [External] Colonial Pipeline - Greensboro Denard, Derek <derek.denard@ncdenr.gov> Mon 5/9/2022 11:17 AM To:Boone, Ron <ron.boone@ncdenr.gov>;Hennessy, John <john.hennessy@ncdenr.gov>;Corporon, Joe <joe.corporon@ncdenr.gov> Cc:Snider, Lon <lon.snider@ncdenr.gov>;Graznak, Jenny <jenny.graznak@ncdenr.gov> Ron, According to Session Law 2011-394 (July 1, 2011), industrials don't need an ATC. Since they are proposing a new treatment component, they might need a major permit modificaon . This is what I gather from what is stated on our webpage: hps://deq.nc.gov/about/divisions/water-resources/water- quality-perming /npdes-wastewater/perming-process#Permit_Modificaons. Minor modificaons for ownership name change and some technical correcons. I am starng in the new posion in the Industrial Perming Unit next week, please have them coordinate with Joe Corporon or John Hennessy. Thanks, Derek Denard Environmental Specialist N.C. Division of Water Resources N.C. Department of Environmental Quality 919 707 3618 office 919 707 9000 main DWR derek.denard@ncdenr.gov 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Boone, Ron <ron.boone@ncdenr.gov> Sent: Monday, May 9, 2022 11:04 AM To: Hennessy, John <john.hennessy@ncdenr.gov>; Denard, Derek <derek.denard@ncdenr.gov>; Corporon, Joe <joe.corporon@ncdenr.gov> Cc: Snider, Lon <lon.snider@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: FW: [External] Colonial Pipeline - Greensboro   All, 5/9/22, 11:34 AM Mail - Denard, Derek - Outlook https://outlook.office365.com/mail/id/AAQkADdhYTVmZDBlLTE5ZDctNGI5MC04ZjliLWU4MjVhZTBhMmJkMgAQAAKPoIRTiEococMkR%2BmCNAA%…2/3 Please see the aachment and the email below concerning NC0031046. Permiee proposes to install aeraon in catchment pond to remove MTBE and prevent future violaons. Is an AtC is required to do this? Also, would this be a minor permit medicaon? Please advise… Best Regards, Ronald C. Boone, Environmental Program Consultant NC Department of Environmental Quality, Division of Water Resources, Water Quality Regional Operaons Secon, Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Main: 336-776-9800 Direct: 336-776-9690 Mobile: 336-341-3568 Fax 336-776-9797 ron.boone@ncdenr.gov hp://deq.nc.gov/about/divisions/water-resources Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hughes, Maribeth <MHughes@colpipe.com> Sent: Friday, May 6, 2022 2:52 PM To: Boone, Ron <ron.boone@ncdenr.gov> Cc: Wya, John M. <JMWya@colpipe.com>; Smith, Brian L. <BSmith@colpipe.com> Subject: [External] Colonial Pipeline - Greensboro CAUTION: External email. Do not click links or open aachments unless you verify. Send all suspicious email as an aachment to Report Spam. Mr. Boone - As per our recent phone call, Colonial Pipeline recently reported exceedances of the MTBE limit for Ouall 004 contained within NPDES Permit NC0031046. The exceedances were reported on the DMRs submied in March and April 2022 and ranged from 25.9 ug/L to 45.1 ug /L (the permit limit is 19 ug /L). We believe that the presence of MTBE within this ouall is related to the documented plume of MTBE in the ground water upstream of the ouall. This plume is being addressed under Incident #18110 . The aached map illustrates the ouall locaon and the plume locaon in October 2021. Colonial would like to install controls to address the presence of MTBE within this ouall. We are currently invesgang an aeraon system of some type within the pond upstream of the ouall but are open to other ideas from the experts assisng us. I know we agreed that this would likely involve a modificaon to the current permit and or Correcve Acon Plan. Is there anything we can do to expedite that or eliminate the need for a modificaon? I look forward to working with you on this. Colonial is commied to protecng the environment we work in. 5/9/22, 11:34 AM Mail - Denard, Derek - Outlook https://outlook.office365.com/mail/id/AAQkADdhYTVmZDBlLTE5ZDctNGI5MC04ZjliLWU4MjVhZTBhMmJkMgAQAAKPoIRTiEococMkR%2BmCNAA%…3/3 Maribeth Hughes, PE, CSP Environmental Specialist Colonial Pipeline Company m. 704-458-3993 | mhughes@colpipe.com Colonial Pipeline Notice - This e-mail message (including any attachment) contains information that may be confidential, be protected by attorney-client or other privilege, or constitute non-public information. If you are not the intended recipient, please notify the sender by electronic mail or telephone and delete the original message without making any copies. Use, dissemination, distribution, or reproduction of this message by unintended recipients is not authorized and may be unlawful. !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !(!(!( !(!(!(!(!(!(!(!(!(!( !(!( !( !( !( !(!(!( !( !( !(!( !( !( !(!(!( !!( !!( !!( !!( !!( !?!? !? !? !?!( !( !? !( !? !( !? !( !? !? !? !? !> !? !( !? !? !? !( !? !( !? !> !? !( !?!? !? !> !? !> !? !? !? !? !? !? !> !? !> !> !> !? !? !> !?!? !> !>!? !? !?!? !? !? !? !?!? !? !? !( !? !? !? !? !? !> !? !? !? !> !? !( !> !? !( !> !( !(!? !? !? !? !? !? !? !? !?!? !? !( !? !> !> !> !( !> !? !( !( MW-12832 MW-141<1MW-1596.8 MW-161<1 MW-187<1 MW-194 MW-197<1 MW-198<1 MW-21 MW-22 MW-220 MW-41<1 MW-45<1 MW-54<1 MW-60<1 MW-97<1 MW-98<1 OW-1<1 OW-85.5 MW-10MW-103 MW-104 <1 MW-105 22 MW-106 MW-110 MW-112 MW-114 MW-118 MW-12 MW-124 <20 MW-127 270 MW-129 <1 MW-130 MW-131 LNAPL MW-132 1.7 MW-139 <1 MW-140 <100 MW-142 MW-148MW-154MW-155 MW-16 MW-164 <1 MW-165 <1 MW-167 <1 MW-180 <1 MW-181 <1 MW-186 5.6 MW-188 <1 MW-199 <1 MW-20 <10 MW-219 MW-219D MW-221 MW-222 MW-223 <20 MW-223D <1MW-224 0.41J MW-226D <1 MW-227 LNAPL MW-228 MW-229 LNAPL MW-233 <1 MW-234 <1 MW-25 6.9 MW-27 <1 MW-30 14 MW-36 <1 MW-40 <200 MW-42 <1 MW-43 7.7 MW-44 58 MW-47 MW-55 <500 MW-74 <10 MW-76 890 MW-80 <50 MW-81 <1 MW-83 <200 MW-85 110 MW-86 6.3 MW-87 <100 MW-88 LNAPLMW-89 <100 MW-9 MW-91 OW-9 1000 MW-108 MW-11 MW-111 MW-113 MW-116 MW-13 MW-136 MW-14 MW-147 MW-24 MW-53 MW-59 MW-70 MW-90 OW-41A RW-1 RW-2 MW-62 LOWER POND POND CHECK BY: AS DRAWN BY: CW DATE: 6/8/2021 SCALE: AS SHOWN CAD NO.: CPC20116-001 PRJ NO.: CPC20116-001 9 FIGURE MTBE IN GROUNDWATER (OCTOBER 2020) GREENSBORO JUNCTION COLONIAL PIPELINE COMPANY GREENSBORO, NORTH CAROLINA LEGEND !>MONITORING WELL GAUGED AND SAMPLED SEMIANNUALLY !?MONITORING WELL GAUGED AND SAMPLED ANNUALLY !(MONITORING WELL GAUGED ONLY !!(WELL EQUIPPED WITH SKIMMER PUMP MTBE CONCENTRATION (µg/L) MTBE NOT DETECTED ABOVE PRACTICAL QUANTITATION LIMIT NOT SAMPLED MEASURABLE LNAPL DETECTED; WELL NOT SAMPLED !(AIR SPARGE WELL !(SOIL VAPOR EXTRACTION WELL 500 FOOT SURFACE WATER BUFFER MTBE PLUME (APPROXIMATE) 20 - 200 µg/L > 200 µg/L 110 < NS LNAPL ¯ 0 175 350 Feet NOTE: DATA FROM GASOLINE SIDE OF FACILITY USED TO GENERATE THIS FIGURE. DEEP WELLS ARE NOT USED FOR CONTOURING. REVISED SEMIANNUAL GROUNDWATER SAMPLING PLAN APPROVED BY NCDEQ ON APRIL 8, 2019. 2L STANDARD FOR MTBE IS 20 µg/L GROSS CONTAMINANT LEVEL FOR MTBE IS 20,000 µg/L µg/L = MICORGRAMS PER LITER J = INDICATES ESTIMATED CONCENTRATION ABOVE THE ADJUSTED METHOD DETECTION LIMIT AND BELOW THE ADJUSTED REPORTING LIMIT 819