Loading...
HomeMy WebLinkAboutNC0031046_Email_20220509 (2)5/9/22, 11:34 AM Mail - Denard, Derek - Outlook Re: [External] Colonial Pipeline - Greensboro Denard, Derek <derek.denard@ncdenr.gov> Mon 5/9/2022 11:17 AM To: Boone, Ron <ron.boone@ncdenr.gov>;Hennessy, John <john.hennessy@ncdenr.gov>;Corporon, Joe <joe.corporon@ncdenr.gov> Cc: Snider, Lon <lon.snider@ncdenr.gov>;Graznak, Jenny <jenny.graznak@ncdenr.gov> Ron, According to Session Law 2011-394 (July 1, 2011), industrials don't need an ATC. Since they are proposing a new treatment component, they might need a major permit modification . This is what I gather from what is stated on our webpage: hops://deq.nc.gov/about/divisions/water-resources/water- quality-permittingLpdes-wastewater/permitting-process#Permit Modifications. Minor modifications for ownership name change and some technical corrections. I am starting in the new position in the Industrial Permitting Unit next week, please have them coordinate with Joe Corporon or John Hennessy. Thanks, Derek Denard Environmental Specialist N.C. Division of Water Resources N.C. Department of Environmental Quality 919 707 3618 office 919 707 9000 main DWR derek.denard@ncdenr.gov 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Boone, Ron <ron.boone@ncdenr.gov> Sent: Monday, May 9, 2022 11:04 AM To: Hennessy, John <john.hennessy@ncdenr.gov>; Denard, Derek <derek.denard@ncdenr.gov>; Corporon, Joe <joe.corporon@ncdenr.gov> Cc: Snider, Lon <lon.snider@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: FW: [External] Colonial Pipeline - Greensboro All, https://outlook.office365.com/mail/id/AAQkADdhYTVmZDBILTESZDctNGI5MC04ZjliLWU4MjVhZTBhMmJkMgAQAAKPoIRTiEococMkR%2BmCNAA%... 1/3 5/9/22, 11:34 AM Mail - Denard, Derek - Outlook Please see the attachment and the email below concerning NC0031046. Permittee proposes to install aeration in catchment pond to remove MTBE and prevent future violations. Is an AtC is required to do this? Also, would this be a minor permit medication? Please advise... Best Regards, Ronald C. Boone, Environmental Program Consultant NC Department of Environmental Quality, Division of Water Resources, Water Quality Regional Operations Section, Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Main: 336-776-9800 Direct: 336-776-9690 Mobile: 336-341-3568 Fax 336-776-9797 ron.boone@ncdenr.gov http://deq.nc.gov/about/divisions/water-resources Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hughes, Maribeth <MHughes@colpipe.com> Sent: Friday, May 6, 2022 2:52 PM To: Boone, Ron <ron.boone@ncdenr.gov> Cc: Wyatt, John M. <JMWyatt@colpipe.com>; Smith, Brian L. <BSmith@colpipe.com> Subject: [External] Colonial Pipeline - Greensboro CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Boone - As per our recent phone call, Colonial Pipeline recently reported exceedances of the MTBE limit for Outfall 004 contained within NPDES Permit NC0031046. The exceedances were reported on the DMRs submitted in March and April 2022 and ranged from 25.9 ug/L to 45.1 ug/L (the permit limit is 19 ug/L). We believe that the presence of MTBE within this outfall is related to the documented plume of MTBE in the ground water upstream of the outfall. This plume is being addressed under Incident #18110 . The attached map illustrates the outfall location and the plume location in October 2021. Colonial would like to install controls to address the presence of MTBE within this outfall. We are currently investigating an aeration system of some type within the pond upstream of the outfall but are open to other ideas from the experts assisting us. I know we agreed that this would likely involve a modification to the current permit and or Corrective Action Plan. Is there anything we can do to expedite that or eliminate the need for a modification? I look forward to working with you on this. Colonial is committed to protecting the environment we work in. https://outlook.office365.com/mail/id/AAQkADdhYTVmZDBI LTESZDctN GI5MC04Zjli LWU4MjVhZTBhMmJkMgAQAAKPoI RTiEococMkR%2BmCNAA%... 2/3 5/9/22, 11:34 AM Mail - Denard, Derek - Outlook Maribeth Hughes, PE, CSP Environmental Specialist Colonial Pipeline Company m. 704-458-3993 1 mhughes@colpipe.com Colonial Pipeline Notice - This e-mail message (including any attachment) contains information that may be confidential, be protected by attorney -client or other privilege, or constitute non-public information. If you are not the intended recipient, please notify the sender by electronic mail or telephone and delete the original message without making any copies. Use, dissemination, distribution, or reproduction of this message by unintended recipients is not authorized and may be unlawful. https://outlook.office365.com/mail/id/AAQkADdhYTVmZDBI LTESZDctN GI5MC04Zjli LWU4MjVhZTBhMmJkMgAQAAKPoI RTiEococMkR%2BmCNAA%... 3/3 1 a 1 1 1 1 1 1 LEGEND MONITORING WELL GAUGED AND • SAMPLED SEMIANNUALLY MONITORING WELL GAUGED AND • SAMPLED ANNUALLY O MONITORING WELL GAUGED ONLY O WELL EQUIPPED WITH SKIMMER PUMP 10 MTBE CONCENTRATION (pg/L) NS LNAPL MTBE NOT DETECTED ABOVE PRACTICAL QUANTITATION LIMIT NOT SAMPLED MEASURABLE LNAPL DETECTED; WELL NOT SAMPLED C AIR SPARGE WELL C SOIL VAPOR EXTRACTION WELL 500 FOOT SURFACE WATER BUFFER MTBE PLUME (APPROXIMATE) 20 - 200 pg/L > 200 pg/L M W-140 ® MW-224 MW-181 MW-164 MW-188 MW-113 MW-27 <1 1 MW- ® ® MW9] 00 MW-88 LNAPL • MW-40 ( 815 MW-127 MW-128 O 32 • MW-25 MW-161 • MW-54 C CC C C 6.9 C ® G MW-186 5.6 C MW-136 • MW-45 <1 • (M1W94 • (J•• • • MW-36 M W-98 MW-60 • !'r 0 NOTE: DATA FROM GASOLINE SIDE OF FACILITY USED TO GENERATE THIS FIGURE. DEEP WELLS ARE NOT USED FOR CONTOURING. REVISED SEMIANNUAL GROUNDWATER SAMPLING PLAN APPROVED BY NCDEQ ON APRIL 8, 2019. 2L STANDARD FOR MTBE IS 20 pg/L GROSS CONTAMINANT LEVEL FOR MTBE IS 20,000 pg/L pg/L = MICORGRAMS PER LITER J = INDICATES ESTIMATED CONCENTRATION ABOVE THE ADJUSTED METHOD DETECTION LIMIT AND BELOWTHEADJUSTED REPORTING LIMIT M1 W-18] • MW-85 0 ®BM20083 W- • M1W-41 • W 19] <1 N A 0 175 350 Feet LOWER POND MW-234 MW-233 MW-129 MW-227 LNAPL MW-22 D <1 MW-1 1 LNAPL LNAPL `MW-® 1.] MW-130 MW-104 1 1 \ MW-20 <10 q so �O' MW-14 Approximate location of Outfall 004 MW-22 • • \ MW-21 • / / MW-194 • 0 MW-219D MW-220 MW-219 MW-118 c'l I / / / / .- •. / ` L A \\ O \ • \ • ONO / ` \ \ ,. MW-221 M W-228 MW-229 LNAPL MW-222 • \. POND i MW-16• mw-110 ® M • MW-103 ® • $G!1 MW-114 M W-155 M W-154 853 / / 1 1 1 C 1 1 1 1 1 1 CHECK BY: AS DRAWN BY: CW DATE: 6/8/2021 SCALE: AS SHOWN CAD NO.: CPC20116-001 PRJ NO.: CPC20116-001 MTBE IN GROUNDWATER (OCTOBER 2020) GREENSBORO JUNCTION COLONIAL PIPELINE COMPANY GREENSBORO, NORTH CAROLINA APEX FIGURE 9