Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0000884_Monitoring - 03-2022_20220422
n .. ti DWR - NonDischarge Monitoring Report Submittal ' •4 .. NORTH CAROLINA Enrlranmenlel QHaflly Monitoring Report Submittal .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Permit Number#* WQ0000884 Name of Facility:* Butterball,LLC Month:* March Year:* 2022 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR 20220422115442440.pdf 3.6MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2,NDMLR,GW-59). Confirmation Email Address:* jatchelor@butterball.com Name of Submitter:* Josh Batchelor Signature: Date of submittal: 4/22/2022 This will be filled in automatically Initial Review ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Reviewer: Gerald,Wanda Is the project number correct?* WQ0000884 Is the monitoring report accepted?* Yes No Regional Office* Wilmington Accepted Date: 5/9/2022 FORM: NDAR-1 08-11' NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? El Compliant ❑Non-Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Compliant ❑Non-Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? ID Compliant ❑Non-Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? i Compliant ❑Non-Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? p Compliant ❑Non-Compliant If the facility is non-compliant,please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective action(s)taken.Attach additional sheets if necessary. Operator In Responsible Charge(ORC)Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeff Shamblin Grade: WWIV, Si Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant manager Facilities/Wastewater Has the ORC changed since the previous NDAR-1? ❑Yes LI No Phone Number: 919-658-67 ext 2267 Permit Exp.: 9/30/22 Signature Date Signature Da e By this signature,I certify that this report Is accurrate and complete to the best of my knowledge. I certify,un er penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that ail qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617 FORM:NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT(NDMLR) Page of Did the mass loading rates exceed the limits in Attachment B of your permit? Ell Compliant ❑Non-Compliant If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective action(s)taken.Attach additional sheets if necessary, • Operator in Responsible Charge(ORC)Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification Number: 991798, 987940 Signing Official: Jeffry Shamblin Grade: WW IV, SI Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMLR? ❑Yes El No Phone No.: 919-658-6743 ext 2267 Permit Exp.: 9/30/22 4—ft-1.2-2.x-2 q/0-(ilf-- Signature Date Signature Date By this signature,I certify that this report is accurrate and complete to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617 FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Sampling Person(s) Certified Laboratories Name: Jefferson Foy Name: Environmental Chemist Name: Josh Batchelor Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 111 Compliant El Non-compliant If the facility is non-compliant,please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective action(s)taken.Attach additional sheets if necessary. Operator in Responsible Charge(ORC)Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeffry Shamblin Grade: WW IV, Si Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMR? El Yes El No Phone Number: 919-658-6743 ext 2267 Permit Expiration: 9/30/2022 Sp, Signature Date Signature Date By this signature,I certify that this report is accurrato and complete to the best of my knowledge. I certify,undf penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted,Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the Information,the information submitted Is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00000884 I Facility Name: Mt. Olive Turkey Processing Facility I County: Duplin l Month: March Year: 2022 Field Name 01A Field Name: 01B Field Name 01C Field Name: 02A Did irrigation occur i Area(acres). 26,75 Area(acres) 74.59 Area(acres). 11 48' Area(acres): 18,61 at this facility? Cover Crop: Coastal Cover Crop. Coastal Cover Crop: Coastal Cover Crop: Coastal: 0 YES ❑NO Hourly Rate(in): Hourly Rate(in): Hourly Rate(in) Hourly Rate(in): Annual Rate(in): 50. Annual Rate(in): 50 Annual Rate(in) 50 Annual Rate(in): 50 Weather , Freeboard Field Irrigated? 0 YES ❑No Field irrigated? LI YES ❑No Field Irrigated? ❑YES ❑., No Field Irrigated? OYES El, a o d >li °f m •a 2 E F m o "n 2 E '' d u -o rn E 2' 61 a -o 2 E rn t m E m W ;; Tc C' E m ; 7 3 C E m : a� �; �. 0 C. E N w C C o e a. o .- To, EIS ',tom •Eoc` 5a Ea, 'gym Kos o Ern @o Eoa 3S• E � � m Ko (a w > a o a o y o o a F L o cv o p a h ❑ p = p o R 1- p o m i o tic7 1 n`. N tj N › Q t J J > a h 3 3 7Q i .J J. > Q .,�. _.1 2 J °F in ft ft gal � min in in gal min in in gal ' min in in gal min in in 1 C 70 0 64 99.328 547.8 0.14 0.01 156,019 ', 670.2 0.08 0.01 r 128,573 396 , 0.25 0.04 2 C 74 0 62 127,271 699.6 0.18 0.02 154,029 670.8 0.08 0.01 164,310 € 486.6 0.33 0.04 3 1 C 82 0 64 1351655 730.8 0.19 0.02 ,,'` 160,553 700.2 0.08 0.01 f 116,594 334.8 0.23 0.04 4 C i 59 0 66 118,530 639.6 0,16 0.02 .' 147,590 639 0.07 0.01 ' f 132,089 , 426 0.26 , 0.04 , 5 PC 76 0 68 68,928 366 0.09 , 0.02 162,252 730,8 0.08 0.01 122,399 395.4 0.24 0.04 6 C 81 0 70 76,000 I 396 010 0.02 164,202 700.2 0,08 0.01 r i 117,383 365.4 0.23 0.04 7 C 78 0 74 95,852 517.8 013 0.02 `;, 162,637 700.2 0.08 0.01 109,667 334.8 0.22 0.04 8 C 70 0 k 76 101,944 517.8 014 0.02 119,795 548.4 0.06 0.01 I 106,496 335.4 0.21 0.04 91 CL 67 0.02 77 133,446 670.2 i 018 0.02 156,183 ( 700.8 1 0.08 0.01 , 123,697 396,4 0.24 0.04 10 CL 50 0 78 129,579 700.2 0,18 0.02 149,583 700.2 0.07 0.01 54,192 182.4 0.11 0.04 11 PC 57 0 78 123204 ' 639.6 0.17 0.02 ` 150,822 670.2 0.07 0.01 12 R 70 0.63 76 10,118 91.2 0.01 0,01 13,303 61,2 T 0.01 € 0.01 ' 17,200 61.2 0.03 f 0,03 13 C , 48 0.02 70 78,974 456.6 0.11 0.01 :...'; 95,096 457.2 0.05 0.01 122,745 457.8 0.24 0.03 14 C 65 , 0 72 125,544 669,6 0.17 0,02 ` 147,165 639 0.07 0.01 15 C 70 0 72 133,033 700.2 0.18 0.02 150,754 700.8 0.07 0.01 84,705 274.8 0.17 0.04 16 PC 72 0.06 72 111096 669,6 0.15 0.01 135,532 639 0.07 0.01 L 114,345 366 , 0,23 0,04 17� C 69 0 72 67,010 365.4 0.09 0,02 159,238 731.4 0,08 0.01 118,926 366.6 0.24 0.04 18 C 76 , 0 70 i 131,036 , 670.2 , 0.06 0.01 I 1 131,632 396,6 0.26 0.04 19 PC 79 0 68 , 142,086 688.2 0.07 0.01 L 111,079 335.4 0.22 I 0.04 20. C 71 0 70 II 64,380 358.8 G0.09 0.01 :': 136,488 670.2 0.07 0.01 i 69,593 213.6 , 0.14 0,04 21 C , 69 0 , 72 138,474 700.2 0.07 , 0,01 1 127,313 I 366 , 0.25 0.04 22 C 75 4 0 72 50,000 244 E 0.07 0,02 143,038 , 700.2 , 0.07 0.01 30,550 244.2 0.06 0.01 23: CL 75 0.94 72 145,056 730.2 0.07 0.01 , 24 R 70 0.32 71 25 C 70 0 62 121,338 669.6 ' '0.17 ' 0.01 138,424 670.2 0.07 I 0.01 i 26 C 63 0 60 135,277 730.8 4 0.19 0.02 `: 151,278 4 730,8 0.07 0.01 1, 27 C 57 0 61 134450 700.2 0.19 0.02 154,851 700.2 0.08 0.01 28 C 62 0 64 122905 639 0.17 0.02 127,690 639.6 0.06 0.01 294 C 52 0 64 116,907 639 0.16 0.02 : 129,323 639 0.06 0.01 , 30 C 71 0 64 156,1.50 694 1 `0.21 0,02 166,320 693 i 0.08 0.01 31 CL 77 0.16 62 75058 426.6 0.10 0.01 93,438 426.6 0.05 0.01 Monthly Loading. 2,711,977 �41FDIENVI 4,182,254 2.07 ����`/, 0 % 0.00 X 2,103,488� 4.16 //�j,/f// /:,, // 45.53 12 Month Floating Total(in): �/�I�I�1�/�/�/III 42.79 /// ,/7 19.18 / / 4 46.54 /��/III FORM: NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 I Facility Name: Mt. Olive Turkey Processing Facility I County: Duplin [Month: March Year: 2022 Field Name: 02B Field Name: 02C Field Name 03 Field Name: 05 Did irrigation occur Area(acres) 12,01 Area(acres) 9.16 Area(acres), 17.28, Area(acres) 18.63 at this facility? Cover Cron-:- Coastal Cover Crop Coastal Cover Crop: Coastal Cover Crop. Coastal ` ,' Q YES ❑NO Hourly Rate(in) Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Annual Rate(in): 86.8 Annual Rate(in): 50 Annual Rate(in): 137.2 Annual Rate(in): 68.8 - Weather Freeboard Field Irrigated? ❑YES ❑NO Field Irrigated? ❑YES ❑NO Field Irrigated? ❑YES LI NO .' Field Irrigated? ❑YES ❑NO m 2 v ° y cr o u E •w w r a, E i s m w 2 _ •E.E. E w +mow, 7, C E c E w w CD }, c E L c ❑ ,- o Q `o ❑ 2 2a E ,0 row Eoro ' ° •Ear .'71 go a 0- `a Fl - o 0- Ern 41 gXo i 'U +' ,O. O. F- :F., ❑ O O C1 F- '}- A p g = p P 0- F- 'C A -0 = o O a I- •` ❑ o g = o i E w !A cC p, Q- J .* J 7 Q _ J J > Q = J a_, J. > ¢ ,..,. J a J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 70 0 64 55562 272.97 0.17 0.04 '` 30,779 170.6 0.12 0,04 93,707;. 458.4 020 0.03 2 C 74 0 62 38,161 180.92 0.12 0.04 83,378 466.2 0.34 0.04 143,979 ° 703.2 0.31 0.03 3 C 82 0 64 74,939 362.25 0.23 0,04 79,969. 397.2 0.17 0.03 _4 C 59 0 66 83,378 397.25 0.26 0,04 . 36,188 206.53 0.15 0.04 99,162: 488.,4 0,21 0.03 5 PC 76 0 68 73020 348.08 0.22 0.04, i 60,232 321.8 0.24 0.05 79,715 3666 017 0.03 6 C 81 0 - 70 66,722 31.4.65 0.20 0,04 33,191 18.8 0.13 0.13 80,985' 397.2 0,17 0.03 7 C 78 0 74 76,7.04 35588 0.24 0.04 35,266 189.8 . 0.14 0.04 110,098 489 023 0.03 8 C 70 0 76 39,165 184.3 0.12 0.04 54516 294,87 0.22 0.04 47,049 f 2136 010 0.03 9 CL 67 0.02 77 64,689 315,95 0,20 0.04 34,807 192.62 0.14 0.04 150,818 6726 032 0.03 10 CL 50 0 78 65,535 326,83 0.20 0.04 32,913 178.03 0.13 0.04 74,332: 3666 0.16 0.03 11 PC 57 0 78 56,693 281,88 0.17 0.04 79,801;.. 1.15.45 0.17 0,09 12 R 70 0.63 76 11,221 60,6 0.02 0.02 13 C 48 _0.02 70 63,037 339.5 0.19 0.03 ' , 89,654}; 458,4 019 0.03 14 C 65 0 72 74,3951 336;6 016 0 03 _ 15 C 70 0 72 151,797 703 2 0.32 0.03 16 PC 72 0.06 72 49,642 254.68 015 0.04 ': 59,829 329.18 0.24 0.04 59,472; 366.6 0,13 0.02 17 C 69 0 72 70,807 34315 0.22 0.04 38253 209.48 0.15 0.04 78,709; 366 017 0.03 18 C 76 0 70 89,743 442.07 0 28 0 04 31,782 179,93 0.13 0,04 147,558 642 031 0.03 19 PC 79 0 68 70,300 345.82 0.22 0.04 37,215 211.03 0,15 0.04 89,103..: 397 2 019 0.03 20 C 71 0 70 93143 467.72 0 29 0.04. 29318 167.75 0.12 0.04 101,586 4578 0.22 0.03 21 C 69 0 72 65,941 322 0 20 0.04 '; 91,981. 427.2 0.20 0.03 22 C 75 0 72 76,232 37.8,28 . :':0.23 0.04 ': 44,267 251.42 0.18 0.04 51,048. 244.2 0,11 0.03 W 23 CL 75 0.94 72 41,229 274.25 0.13 V 0.03 32,373 186.63 0.13 0.04 96,651, 427:2 0.21 ;0.03 24 R 70 0.32 71 25 C 70 0 62 7,866. 3898 . ..'0.02 0.02.'? 90,565: 3972 0.19 0.03 26 C 63 0 60 11,999 60.85 0.04 0.04 47,156 269.8 0.19 0.04 83,888 366.6 0.18 0.03 27 C 57 0 61 41,985 245.4 0.17 0.04 159,295 733.2 0.34 0.03 28 C 62 0 64 46,040 265.42 0.19 0.04 29 C 52 0 64 30 C 71 0 64 , 70,590 362 0.28 0.05 89,950: , 514 0.19 0.02. 31 CL 77 0.16 62 56,488 334.25 0.23 0.04 89,435j 427,8 019 0.03 Monthly Loading: 1,334,507 4.09 936,566 3.77 2,595923% 5.53 ff� j/�//0 M0.00 ��/ 12 Month Floating Total(in): V 47.20 ����I�I��II / 38.83 �� //.`������� i� i/ 67.99 i//� 13.79 FORM: NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of Permit No.: WQ0000884 L Facility Name: Mt. Olive Turkey Processing Facility [ County: IJuplin Month: March Year: 2022 Field Name: 07 Field Name: 07A Field Name 08A Field Name: 08B Did irrigation occur Area(acres) 14.89 Area(acres) 6.12 Area(acres) 30.38 Area(acres): 34.84 at this facility? Cover Crop Coastal Cover Crop. Coastal Cover Crop: Coastal Cover Crop: Coastal Ell YES ❑NO Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Annual Rate(in): 70,7 Annual Rate(in): Annual Rate(in): 111.3 Annual Rate(in): 72.2 Weather Freeboard Field Irrigated? 2 YES CJ NO Field Irrigated? ❑YES ❑NO Field Irrigated? 0 YES ❑NO Field Irrigated? El YES 0 NO at ~y _*--• C Q3Y 9 a, 6a a rn E T e a) -a -o o E Trn a) 'a a c E a, o) ean v > 0) E >, rno m am E .� 0) >+ c 3 Em e . c E w m w A a E a a j , E m i c o Um E n cn.o 0m a� ?]oaQa HE ,_m An xE xoa�ltl o �Q 1-E •E� C] �S° �o`3 0m ]o aa HErn �❑ �a ExO !Si ]o fl i-E •� C� 718 ioa a° aa, 1- a - °E in ft ft gal min in in gal min in in gal nun in in gal min in in 1 C 70 0 64 73,420 368,22 0.18 0.03 111,434 396 0.14 0.02 2 C 74 0 62 36,576 178.78 0.09 0.03 60,032' 213 0.07 0.02 3 C 82 0 64 73,485 360,88 0.18 0.03 100,141` 335.4. 0.12 0.02 ; 4 C 59 0 66 79046 39728 020 0.03 68,808 213 0.41 0.12 189,569; 609'. 0,23 0.02 5 PC 76 0 68 6 C 81 _ 0 70 72,020 334.05 0.18 0.03 121,941. 396.6 0.15 0,02 7 C 78 0 74 56,245 267:03 0.14 0.03 209,440, 700.2 0.25 0.02.. 8 C 70 0 76 38,394 182.55 0.09 0.03 96,305 3348 0.12 0.02 9 CL 67 0.02 77 63,962 313.73. 016 0.03 114,448 396r 0,14.. 0.02 !` 10 CL ._. 50 0 78 62,679 319 88 0 16.. 0.03 132,789 486,6 0,16 . 0.02 11 PC 57 0 78 56,879 279,67 0.14 0.03 88,322 i 334.8 0.11 0.02 12 R 70 0.63 76 9,622. 50.4 0.02 0,02 '. 16,789 ! 91.2 002 0.01 13 C 48 0.02 70 76,556 420.47 0.19 0.03 ,' 122,517, 4572 0.1.5 0.02 14 C 65 0 72 63,187 306,93. 016 0.03 97,771 334.8. 0.12 0.02 . 15 C 70 0 72 57,824 291,13 0.14 0.03 135,856: 456.6 0.1.6 0,02 16 PC 72 0.06_ 72 65,508 326.72 016 0.03 17 C 69 0 72 71,103 338.7 018 0,03 18 C 76 0 70 53,547 255 '0,:13 0.03 60,056 r 213` 0.0.7 0.02 19 PC 79 0 68 57,187 273.7 0.14 0.03 35,551.;r 183 0;04 0.01 20 C 71 0 70 66,849. 327.7 017 0.03 _ 21 C 69 0 _, 72 69,4.15 355.8 017 0.03 22 C 75 0 72 63,165 306:07 0. - 16... 0.03 23 CL 75 0.94 72 75,368 368.05 0.19 0.03 24- R 70 0.32 71 25 C 70 0 62 52,879 243.9 013 0.03 126,106 396. 0.15 0.02 26 C 63 0 60 68,455 332.72 0.17 0.03 ' 186,066. 609.6 0.23 0.02 27 C 57 0 61 88,848. 431.13 0.22 ;?0.03 `; 130,658 426.6 0.16 0.02 28 C 62 0 64 69,848 34.0.47 017.... 0.03 72,732 243.6 0.09 0.02 ' 29 C 52 0 64 66,434 332.43 0,16 0.03 i 85,263 304.8 0.10 0.02 30 C 71 0 64 88,320 368 022 O.Q4...` >168,480. 416' 0.20 0.03 31 CL 77 0.16 62 123,392:• 396,6 015 0.02 Monthly Loading: 1,776,821.� 4.39 r 68,808 0.41 2,585,658 ,/3,13 ' 0 rr� 0.00 f� j 12 Month Floating Total(in):%7�//1/I,G 39.13 ����f��i%I 1�Y/!f/� 8.93 �f������/i Il//!/ 17.90 1/Il���/Il�l�� /I/ / 8.28f11111J! FORM: NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility I County: Duplin I Month: March Year: 2022 [ Field Name: 08C Field Name: 09A Field Name 09B-Al Field Name: 09B-A2 Did irrigation occur Area(acres) 10.75. Area(acres) 30.38 Area(acres) 4,25 Area(acres): 3.85 at this facility? Cover Crop. Coastal Cover Crop. Coastal Cover Crop Coastal Cover Crop: Coastal Li YES LI NO Hourly Rate(in): Hourly Rate(in): Hourly Rate(in). Hourly Rate(in): Annual Rate(in): 86.8 Annual Rate(in): 77.1 Annual Rate(in): 21.76 Annual Rate(in): 11.5 Weather Freeboard Field Irrigated? ❑YES []NO Field Irrigated? ❑YES ❑NO Field Irrigated? ❑YES 2 NO Field Irrigated? ❑YES ❑NO m o Y g e e °' a .n ¢s E ai as v a c E o m o 'a ca E rn. Em o -a at E o N 9 N - 7 N C 7 T C W C 'A _ 41 ,F�, a A C U Q E % _a 'Q Ern •gym .XEoro ' a Ern .7ro uo � tea .: Ern 1 xEx 'om � Ear., -F � xo � ' .- A . 0 Sl F .'L 0. id O a iz •12 © O (6 o 0 6 O. H • . A Q x , a ~ .2 C] 0 x o 0 to °F in _ ft ft gal min in in gal min in in gal min in in gal min in in f t , 1 C 70 0 64 125,913 669 0,15 0.01 2 C 74 0 62 32,543 213 0.04 , 0.01 3 C 82 0 64 [ 109,080 578.4 0.13 0.01 4 C 59 0 66 77,730 426.6 0.09 0.01 5 PC 76 0 68 76,748 395.4 0.09 0.01 6 C 81 0 70 72,268 394.8 0.09 0.01 7 C 78 0 74 121,265 639 0.15 0.01 8 C 70 0 76 102,470 579 0.12 0.01 9 C 67 0.02 77 123,180 668.4 0.15 0.01 /10 CL 50 0 78 111,971 584.4 0.14 0.01 11 PC 57 0 78 125,526 158.14 0.15 0.06 12 R 70 0.63 76 13,319 91.2 0.02 0.01 13! C 48 0.02 70 84,555 124.32 0.10 0,05 3 14 C 65 0 72 90,683 456.6 0.11 0.(11 15 C 70 0 72 16 PC 72 0.06 72 61,064 365.4 0.07 0.01 17 C 69 , 0 72 74,024 365.4 0.09 0.01 18 C 76 0 70 127,906 654.6 0.16 [ 0.01 19 PC 79 0 68 s 140,979 670.2 0.17 0.02 20 C 71 0 70 , 138,202 699.6 0.17 0.01 21 C 69 0 72 [ 111,569 762 0.14 0.01 22 C 75 0 72 131,867 780.6 0.16 0.01 23 CL 75 0.94 72 135,129 700.8 0.16 0.01 24 R 70 0.32 71 25 C 70 0 62 128,639 669.6 0.16 0.01 26 C 63 0 60 121,742 622.8 0,15 0.01 27 C 57 0 61 138,820 700.2 0.17 0.01 r r 28; C 62 0 64 80,735 426.E 0.10 0.01 29 C 52 0 64 54,539 304.2 0.07 0.01 30 C 71 0 64 E 140,800 440 0.17 0.02 31 CL 77 0.16 62 74,361 430.8 0.09 0.01 Monthly Loading: 0 0.00 / 2,927,622/ 3,55 ��i���/'�0 OAO •4J4 0 00012 Month Floating Total(in): �,Ve• �I� //a 443.36 1 �.�����f,� 28.70 21211.48 FORM: NOAR-1 08-11 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page- of Permit No.: WQ0000884 1 Facility Name: Mt. Olive Turkey Processing Facility I County: Duplin I Month: March Year: 2022 Field Name 09B-B1 Field Name: 09B-B2 Field Name 09C Field Name: 10A Did irrigation occur Area(acres): 1.75:. Area(acres) 11.01 Area(acres) 21.48 Area(acres): 15.19 at this facility? i Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Cover Crop: Coastal • [1]YES ❑NO Hourly Rate(in) Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Annual Rate(in). 38.8 Annual Rate(in): 11.5 Annual Rate(in):t 25 Annual Rate(in): 79.9 Weather Freeboard Field Irrigated? ❑YES CI NO Field Irrigated? ❑YES ❑i No Field Irrigated? Li YES ❑:NO Field Irrigated? 0 YES ❑NO I- m 2 Zr Ty m re, & Em d c :E ?• c v m c 7 '' c E F a m' a. c g :.,5T ' Em am a c § >, cTa V m acs Ero la E3zE e � ' ,'a E i v E :a a E % "5 E r' n A �, a .a o mA_ a s a) n 2 ' o co o Q H ' © pro .5.,- o Qa.- - 'T. A .05 '7‹ o (C O 6 k- '23 g18 .% o 2 SO E U A a LR Q ....1 SJ 7 Q r:. J N 2 3 Q � J m i J Q it J r x _1SO 0 . F- n. i °F , in ft ft gal min in in gal min in in .i .gal min in in gal min in in 1 C 70 0 64 108 727:?:' 396 0,19 0.03 140,203 396 0,34 0.05 2 C 74 0 62 155,920j 5178 0.27 0.03 3 C 82 0 64 , 114,619 394,2 0,20 0.03 127,665 334.8 0.31 0.06 4 C 59 0 66 100,188 3354 . 0.17 0,03 82,318 243.6 0.20 0.05 5 PC 76 0 68 113,506` 3648. 0.19 0.03 ` 113,957 274.2 , 0.28 0.06 6 C 81 0 70 111,593 335.4 0.19 0.03 ; 7 C 78 0 74 155 313` 487.2 0.27 0.03.''` 8 C 70 0 76 171,059': 548,4 0.29 0.03 9 CL 67 0.02 77 , l ;95,337 334.8 0.1.6 0.03 147,056 395.4 0.36 0.05 10 CL 50 0 78 106,751 366 0.18 0,03 11 PC 57 0 78 97,421 304..2.... . 0.1.7 ' 0.03 12 R 70 0.63 76 13 C 48 0.02 70 ' 14 C 65 0 72 i ( , 115,784 365.4 0.20 0.03 15 C 70 0 72 1 16 PC 72 0.06 72 37,448 iS 213,6 0.06 0.02. 17 C 69 0 72 104,727;1, 365.4 0.1.8 0.03 120,110 ' 304.2 0.29 0.06 18 C 76 0 70 19 PC 79 0 68 123,745.' 395.4 0.21 0,03 20 C 71 0 : 70 J 113,476.?r 396 0.19 0,03 21 C 69 0 72 68,591 ::: 213 0.12 0.03 130,501 334.2 0.32 0.06 22 C 75 0 72 23‘ CL 75 0.94 72 r 24 R 70 0.32 71 25 C 70 0 62 26 C 63 0 60 t 105,338 274.2 0.26 0.06 27 C 57 0 l 61 114,516 334.8 , 0.28 0.05 28 C 62 0 64 29 C 52 0 64 60,400 360 0.15 0.02 ! 30 C 71 0 64 96,600 i 276 0.23 0.05 31, CL 77 .' 0.16 62 . . Monthly Loading: 0 0�II�I/ 0.00III/,II� -/ 0.00 1"" 1 8.94,205 I 3.25 V 1,238,664 3.00 '',Cr 12 Month Floating Total(in): d� 4 33.48 7 4 10.57 4 23.49 36.52 .4 FORM: NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page of 1 _ Permit No.: WQ0000884 { Facility Name: Mt. Olive Turkey Processing Facility L County: Duplin Month: March Year: 2022 Field Name: 10B Field Name: 10C Field Name: 11 Field Name: 12 _ Did irrigation occur Area(acres): 31.42 Area(acres). 19.8 Area(acres). 26.13 Area(acres): 17.78 at this facility? Cover Crop: Coastal Cover Crop, Coastal Cover Crop Coastal Cover Crop: Coastal 0 YES ❑NO Hourly Rate(in): Hourly Rate(in): Hourly Rate(in) Hourly Rate(in): Annual Rate(in): 30 Annual Rate(in): 35 Annual Rate(in): 32 36 1i Annual Rate(in): 6.42 Weather Freeboard Field Irrigated? 2 YES ❑Na Field Irrigated? 2 YES ❑NO Field Irrigated? ❑YES ❑NO : Field irrigated? 0 YES ❑NO w m c - V D o of a °' m a - E o . as .0 I rn E at m a D Cr) E at a) a a rn E rn o m ° m o.m E ! w2 ›, c a L c E m w >. c L c E m wy ac E E ,w w ›. c E v o U w a o u 7 Ti E'a 'ca 5 E o ro = a E a '� E, .0 o 5 = ,, E .a m a E:Q 5 �- E_ rn •F •p o I a) d Y 7,Ti P .Q iz Q O o. 7. . PE ❑ o fa S O o Q^ : I r. O O o o 0.. h .� ca O to O y E awl cn tt w_ > Q _t > Q .1 a ..... › ¢ � � -..r 7a _i 2 - a) ~ a A °F in ft ft gal min in in gal min in in gal min in in gal min in in V 1 C 70 0 64 117087 426 01.4 0,02 ;' 79,768 371 0.15 0.02 2 C 74 0 62 67,271 213 0.08 0.02 117,114 491.22 0.22 0.03 112,122. 4848 0,16 0.02 112,122 484.8 0.23 0.03 3 C 82 0 64 94,993 363.32 0,18 0.03 169,11.3 607,2 024 0.02 4 C 59 0 66 78,538 274.2 0,09 0.02 73,974 330.28 0.14 0,02 134,076 4254 019 0.03 5 PC 76 0 68 110,495 365.4 0,13 0.02 86,779 330.4 0.16 0.03 113,704. 516 0.16 _ '0.02 113,704 516 0.24 0.03 6 C 81 0 70 104,278 304.2 012 0.02 75,874 287.22 0.14 0.03 87,622 424.8 0.12 0.02 87,622 424.8 0.18 0.03 7 C 78 0 74 138,244 456.6 0.16 0.02 >:: 85,995 356.97 0,16 0,03 125,747 577.2 0.18 0.02 125,747 577.2 0.26 0.03 8 C 70 0 76 69,251 274.2 .0.08 0.02 ' 41,453 204.1 0.08 0.02 115,902 576.6 0.16 i0 02 115,902 576.6 0.24 0.02 9 CL 67 0,02 77 97,9.44 334.8 0,11. 0.02 66,500 304.82 0.12 0.02 98,01.51, 486.6 0,14... 0.02 98,015 486.6 0.20 0.03 10 CL _ 50 0 78 101,1.37 334.8 012 0,02 85,934 317.8 ._ 0.16 0.03 119,611 425.4 0.25 0.03 11 PC 57 0 78 123,803 365,4 0,15 0,02 `'.: 164,267 5772 023 0.02 12 R 70 0.63 76 _ 18,747 9.1,2 0.02 0.01 13 C 48 0.02 70 93,942 422,82 0.17 0.02 14 C 65 0 72 79,846 295.68 0,15 0.03 109,570 576.6 0.15 0.02 ; 109,570 576.6 0.23 0.02 15 C 70 0 72 174,568 662.32 0,32 0.03 125,292 516. 018 0.02 16 PC 72 0,06 72 121,1.77 366 0,14 0.02 ::{ 128,849 546,6 0.18 0.02 ' 17 C 69 0 72 123,395 365.4 0.14 0.02. '' 76,256 337.6 0.14 0.03 124,994 546 0.18 0,02 18 C 76 0 70 166,290 621.72 0.31 0.03 107,384 454.:8 0.15 0.02 19 PC 79 0 68 112,173 335,4 0,13 0.02 197,81.8 4248 028 0.04 20 C 71 0 70 114,7.82 335.4 0.13 0.02 83,791 344.33 0.16 0.03 103,602 424,2 0,15 0.02 21 C 69 0 72 98,457 358.68 0.18 0.03 248,899 516.6 035 0,04 .. 22 C 75 0 72 96,548 368.87 0.18 0.03 168,821 516 0.24 0.03 23-CL 75 0.94 72 126,401 0.15 93,623 340.88 0.17 0.03 115,531 333.6 0.16 0.03 24 R 70 0.32 71 25 C 70 0 62 229,693 . 6072 0.32 0.03 26 C 63 0 60 128,322 396 0.15 0,02 :'` 87,787 330.42 0.16 0.03 33,896 4548 005 0.01 27 C 57 0 61 154,231 581.47 0.29 0.03 28 C 62 0 64 115,634 . 364.8 0.14 . ` 0.02 85,576 322.93 0.16 0.03 29 C 52 0 64 61069 365.4 0.07 0.01 89,743 333.77 0.17 0.03 30 C 71 0 64 , 89,925 327 0.17 0.03 31 CL 77 0.16 62 102,280 379.8 0.19 �0�03 f�� ��� / Monthly Loading: 1,929,748% rz/.":2' 2,381,2471 j� 4.43 %/�//0/����/� 1 28.127 '/ ������///I// 1.83 /12 Month Floating Total(in):������,��� 1/ 26.70 ` �f�����1�� 32.66 28.12 5.08 f FORM:NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of Permit No.: WQ0000884 1 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin ` Month: March Year: 2022 Field Name: 13 Field Name: 14 Field Name 15C Field Name: 16 Did irrigation occur - - Area(acres). 31,42 Area(acres): 12.07 Area(acres). 18,03 Area(acres): 12.95 at this facility? Cover Crop: Coastal Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal ❑� YES (]NO Hourly Rate(in) Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Annual Rate(in): 31.42 Annual Rate(in):_ 78.02 Annual Rate(in): 39.21 Annual Rate(in): 65.38 Weather Freeboard Field Irrigated? YES ❑No Field Irrigated? ❑YES LINO Field Irrigated? 0 YES ❑;No ." Field Irrigated? ❑YES ❑NO w _ - o a) °/ m -0 -8 0) E ce m .0 v c E m 'a -: w E ai cu -o 'n c, E o) >. « 0) N W e ., >. C a a NU3 C 7 ?' C 0 [) g. y' E` N 2 5 �' 5. m C� E m E. ro E . .W � E . w w. ?,. � E cow ,.. �.;_ �, E ._ ar �,, �. p a a 0 ,c2 a E_ :ro . T ,E 3 °I o o E m •, 'o .E. o m s o E a) 'cq E o 2 Q- E , '� ,E o ro 2 i; ° u. °L. Q E- `C ❑ b ro m o: `o a. it •r ❑ o ca x a o o. 1- E. Q o g m o , o n i- •c Ca o tg T o in °F in ft ft gal min . in in. gal min in in gal min in in gal min in in 1 C 70 0 64 W 29,457 397.8 0.09 0.01 79,554 368.1; 016 0.03 - 95,605 408.65 0.27 0.04 2 C 74 f 0 62 99,615. 469.1.5 0,20 0.03 3 C 82 0 64 169,114 607.2 0 20 0.02 147,260: 684 23 0.30 0.03 158,910 ' 677.62 0.45 0.04 4 C 59 0 66 134,076 425.4 016 0.02 `1 96,154 461 0.20 0.03 95,184 416.72 0,27 0.04 5 PC 76 0 68 113,704 516 013 0.02 30,207 427.8 0.09 0.01 72,506 ;- 335.37 0.15 003 73,773 1 326.17 0.21 0.04 6 C 81 0 70 87,622 424.8 0.10 0.01 75,583 345.42 0.15 0.03 85,149 355.63 0.24 0.04 7 C 78 0 74 4 125,747 577.2 015 002 86,015 392.92 0.18 . 0:03 81,150 355.75 0.23 0.04 8 C 70 0 76 115,901 576.6 0.14 0,0.1 60,724 29.3.67 0.12 0.03 46,557 229.15 0.13 0,03 ' 9 CL 67 0.02 77 98,015 486.6 0..11 0.01 27,105 397.2 0.08 0.01 70,473 344.45 0,14 0.03 67,931 307.88 0.19 0,04 10 CL 50 0 78 119,611 425.4 0.14 0.02 32,871 459 0.10 0.01 66,991 328,45 0..14 0,02 ;l 73,603 341.32 0.21 F 0.04 11 PC 57 0 78 164,268 577,2 0.19 0.02 42,867 580.8 0.13 0.01 68,991 ` 333.3 0.14 0,03 93,759 406.22 0.27 l 0.04 12 R 70 0.63 76 _ 9,851 50.17: 0.02 0.02: 13 C 48 0.02 70 79,375 ' 420.37 0.16 0.02 92,960 421.05 0,26 0.04 14 C 65 0 72 109,570 576.6 0.13 0.01 ^ 39,003 189.92 0.08 0.03 74,396 324.17 0,21 0.04 15 C 70 0 72 125,292 516 0,15 0.02 71,064 ; 348,22 0,15 0.03 74,069 320,43 0.21 0.04 16 PC 72 0.06 72 128,849 546.6 0.15 0.02 16,754 244.8 0.05 0.01 118,112' 578.07 024 0.03 123,460 531.02 0.35 0.04 17 C 69 0 72 124,993 546 0.15 0.02 69,683'; 340.43 0.14 0.03 76,880 334.23 0.22 0.04 18 C 76 0 70 107,384 454.8 0.13 0.02 75,888 365.85 0.16 0.03 '..! 61,741 254.18 0.18 0.04 19 PC 79 0 68 75,276?, 352.42 0.15 0.03 ' 100,810 425.05 0.29 0.04 20 C 71 0 70 93,601. 424.2 0.11 0.02 ;` 76,682 :' 389.;8 0.16 0,02. 75,316 319.07 0.21 004 21 C 69 0 72 144,887 680.1 0,30 0.03 78,133 321.1 , 0.22 0.04 22 C 75 0 72 28,195 458.4 0.09 0,01 90,300 374.88 0.26 0.04 23 CL ' 75 0,94 72 21,742 336 0.07 0.01 70,094 s 33482 0.14 0.03 ':! 157,271 656.95 0.45 0.04 24 R 70 0.32 71 _ c 25 C 70 0 62 47,284 672 0.14 0.01 76,532 375.88 0.1.6 0.02. 59,030 243.68 0.17 0.04 26 C 63 0 60 1 74,918 500.4 , 0.23 0.03 69,458 344.2 0,14 0,02 i 65,272 281.87 0.19 0.04 27 C 57 , 0 61 .78,362 395.57 016 002. 64,997 282.13 0.18 , 0.04 28 C , 62 0 64 21,576 336 0.07 0.01 67,230: 317.87 0.14 0.03 68,678 285.3 0,20 0,04 29 C 52 0 64 t 173,793.' 593.78 036 0.04 61,463 262.97 0.17 0.04 30 C 71 0 64 106,080 544 0.32 0,04 71,760 368 0.15 0.02 69,230 322 0.20 0.04 31 CL 77 , 0.16 62 •79,404.`` 384.67 0.16 0.03 Monthly Loading: 1,817,747: 2.13 479,056 1.46 2,370,320 4.84 � 2,265,627 6,44 12 Month Floating Total(in):V//// 4 30.93 / 37.76 f 31.70 ll/�1��/�///�/� 38.52 j FORM: NDAR-1 08-11 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of Permit No.: WQ0000884 l Facility Name: Mt. Olive Turkey Processing Facility J County: Duplin Month: March Year: 2022 Field Name. 18 Field Name: Field Name Field Name: Did irrigation occur Area(acres): 2.25 Area(acres): Area(acres). Area(acres): at this facility? Cover Crop: Coastal Cover Crop: Cover Crop: Cover Crop: YES ❑NO Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Hourly Rate(in): Annual Rate(in): 65.39 Annual Rate(in): Annual Rate(in), Annual Rate(in): Weather Freeboard Field Irrigated? ❑:YEs ❑No Field Irrigated? ❑YEs ❑NO Field Irrigated? ❑YEs ❑NO Field Irrigated? ❑YES ❑NO Is ma) ;? rye E v m �' L tn E m m a E m 2 �, E m _ a c ❑ a a; Ew E o ro; a s rn ro •E o 5 ° a E cam ,E o ' ° E '' E ' 5 cu ii co 480_ gal min in in gal min in in°i= in ft ft gal min in in gal min in in 1 C 70 0 64 2 C 74 0 62 3 C 82 0 64 4 C 59 0 66 28,771 23108 047 0,12 5 PC 76 0 68 6 C 81 0- 70 7 C 78 0 74 8 C 70 0 76 9 CL 67 0,02 77 10 CL 50 0 78 11 PC 57 0 78 12 R 70 0.63 76 13 C 48 0.02_ 70 14 C 65 0 _ 72 .._ 15 C 70 0 72 16 PC 72 0.06 72 17 C 69 0 72 44,038 335.62 072 0.13 18 C 76 0 70 19 PC 79 0 68 20 C 71 0 70 21 C 69 0 72 22 C 75 0 72 43,41.9 311..8 0.71 0.14 .' 23 CL 75 0.94 72 24 R 70 0.32 71 25 C _ 70 0 62 26 C 63 0 60 38,227 275.9 063 0.14 27 C 57 0 61 _ 13,150 96.25 0.22 0.13 28 C 62 0 _ 64 29,810 213.15 0.49 0.14 29 C 52 0 64 30 C 71 0 - 64 22,360 172 0,37 013'`` 31 CL 77 0.16 62 } Monthly Loading: 219,775: 3,60r� 0 0,00 r„,, �0� 0.00 r/, 0 0,0012 Month Floating Total(in): /�,� �//f/ 47.23 ' I,������I�� %% �l���i/��yff, i�i/////// j/ FORM:NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT(NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 Field Name: 01A Field Name: 01B Field Name: 01C Field Name: 02A Field Name: 02B Area(acres): 26.75 Area(acres) 74 59 Area(acres): 11.48 Area(acres); 18.61 Area(acres): 10.94 Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Cover Crop; Coastal Cover Crop: Coastal Load Type: PAN Load Type. PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? OYES ❑No Field Loaded? 0 YES ❑NO, Field Loaded? ❑YES n NO Field Loaded? 0 YES ❑NO; Field Loaded? ❑YES ❑NO z oc z al z c z m Z Z d Z c Z mat z c z ° m ooy . m oot m ° _ m ID a d tiN 4. n 4 6 o I" a a- -0 ', o a a L n .f,„,. 2 a 6. µ' 2 a. 0 O a. -4�^,, o ..... a me >, sa ..a Q � ., 5i � 2 � a m >,, ' a ¢ ar �� fi � a w > o O E E v CJ Ez' of Ei U wJ EZ w � � z 4Cf ys. ,�°j Z N ,.�,, °j 3Z a > 6 ° c i °- �' > .6 j aai." m W e o a 7 c 8 3 0<`: i s �� a V o a U o a U n U a U cs j a U U Month gal mgfL lbs/ac- Ibsfac gal mgfL` lbs/ac lbs/ac' gal mgfL lbs/ac lbs/ac gal mg/L lbs/ac` Ibsfac` gal mg/L lbs/ac Ibsfac April 2,726,303 55.03 46.8 46.8 2,182,161, 5503: 13.4'' 13.4; 1,003,310 55,03 40.1 40.1 2,234,846, 55.03 55.1 55,1. 1,939,719 55,03 81.4 81.4 May 3,174,324 59.21 58.6 105.4 3,114,139 59.21 20,6:. 34.0: 308,990 59.21 13.3 53.4 1114,851i. 59,21 29.6 847. 790,543 59.21 35.7 117.1 June 1,312,674 48,56` 19,9 125.2 603,2641' 48.56 3.3 37.3' 1,386,658 s 48.56 48.9 102.3 :3 037,079 48.56 66.1 150,8 1,753,500 48.56 64.9 182.0 July 1,811,646 73.26 41.4 166.6 6,204,196_ 7326, 50,8 ; 88.1. 1,071,353 73.26 57.0 159.3 :.5,034,489 73,26 165.3: 316,1;. 1,912,933 73.26 106.8 288.8 August 3,487,524 41.28 44.9 211,5 '4,366,756 41.28_ 20,2:: 108.3._2,894,617 41.28 86.8 _ 246.1 1,986,797; 41,28c` 36.8'',' 352,8. 1,725,965 41.28 54.3 343.1 September 2,522,644 * 47 37.0 248.5 4,155,718 47 `� 21.8'. 130.1a 2,437,339 47 83.2 329.4 `755,963 47 15.9i 368,8;: 1,750,988 47 62.7 405.9 October 1,832,405* 47.77 27.3 275.8 3,215,183 47.77i 17.2. 147.3'. 1,029,351 47.77 35.7 365.1 ,2574,880, 47,77` 55.1 423.9V 0 47.77 0.0 405,9 November 2,939,890 47.69 43.7 3195 ;660,832' 47.69;: 3.5 15081i 2,125,827 47.69 73.7 438.7 1,648,880.; 47,69 35,2 459,1;y 428,965 . 47.69 15.6 421,5 December 3,946,690 64.63 79.5 399.0 '5 069,802 64,63 36.6 187.5 1,660,732 64.63 78.0 516.7 1,585,346 64.63. 45,9. 505,0'. 1,630,842 64.63 80.4 501.8 January 3,033,600 55.64 52,6 451.6 3,333,032 55,64" 20.7 208.2,` 1,453,058 55.64 58.7 575,5 1370.,785 55.64 34,2 :; 539,2ji 2,018,572 55.64 85.6 587.4 February 4,316,612 58.95 79.3 531.0 3,910,929 589.5 25.8 234.0. 137,083 58,95 5.9 581,3 1795,948 58.95 : 47.4 586.7: 2,043,071 58.95 91.8 679.2 March ,2,711,977 49.93 42.2 573.2 ,'4,182,254 49.93; 23.3`; 2573 0 49.93 0.0 581.3 `2,103,448` 49.93 i 47.1 :': 633.7' 1,334,507 49.93 50.8 730.0 12 Month Floating PAN Load % j ;7 2 (Ibslacfyr): 573.2 , 257 3.: / 581.3rff 633 7 730.0 Annual PAN Load Limit4,,,.,,,,,,,. / (Ibslaclyr): 7 // d FORM:NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT(NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 Field Name: 02C Field Name. 03 Field Name: 05 Field Name: 07 Field Name: 07A Area(acres): 9.16 Area(acres) 15,66 Area(acres): 18,03 Area(acres): 9.57 Area(acres): 6.12 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Load Type: PAN Load Type: PAN Load Type: PAN Load Type; PAN Load Type: PAN Field Loaded? ❑� YES ❑NO Field Loaded? 2 YES ❑No Field Loaded? ❑YES 0 NO Field Loaded? 0 YES ❑NO Field Loaded? (]YES ❑NO m , 0 ce 0m za z Z o z Z oo z z o z v z o Z a am aY ¢ m, � < < w •. >t. aa a ;w ; a > Vaa ;; a CU a. ID' °" -0 " o a am IL '. 8 a a ° a .47, a a ro a. " g a. D. o- .0 20.,crsa . s+ ], s N J < ,a a. ' (e J a 0i 7,s N J a Q w ], o 6 J a 61 ... y, co J l't =c N GE jZ d N � C ; cJ E a F J aZ W e m = d -9 cR 8 E Z E E Q .,, E a ° a E ,, ; Zac 2 8 � a U ao vn a a6 o T...., Q5U oa0 o < 0 0 < 0 n 7 U Month gal mgiL lbs/ac lbs/ac gal.. 1'. mg/L' lbs/ac lbs/ac: gal mg/L Ibslac lbs/ac gal mg/L: Ibslac. lbs/ac gal mg/L lbs/ac lbs/ac April 0 55.03 0.0 - 0.0 0 55.03 0,0 0.0.<' 2,485,830 55.03 63.3 63.3 2 564,068 55.03: 123.0 123.0: 0 55,03 0.0 0.0 , May 503,648 59.21 27.2 27.2 988,083 59.21.1 31.21 31.2; 1,320,394 59.21 36.2 99.4 '.277,237'{ 59.21<: 14,3 1373:; 125,793 59,21 10.2 10.2 June 358,638 48.56- 15.9 43.0 2,065,137: 48,56:. 53.4 84.6:` 267,393 48.56 6.0 105.4 1,754,770, 48561 74.3' 211.5; 0 48.56 0.0 10.2 July 1,111,575 73.26 74.1 117.2 3,484,148 73,26 1359 220,5; 1,163,636 73.26 39,4 144.9 1,669,021:' 73.26 106.6 318.1'.` 257,228 73.26 25.7 35,8 August 63,939 41.28 2.4 119.6 4,684,849 4.1,28 103.0 323,5. 189,072 41.28 3,6 148.5 2,301,346 41.28.: 82.8 : 400.9, 74,458 41.28 4.2 40.0 September 1,915,287 _ 47 82.0 201.5 2,359,348 47 59.1 ' 382,6 2,796,617 47 60.8 209.3 657,600> 47 26.9 427.8`: 281,707 47 18.0 58.1 October 1,781,765 47.77 77.5 279.0 1,004,379 47.77 25.6`, 408.1' 0 47.77 0.0 209.3 `.1,409,439' 47.77i 58.7' 486,5a 106,667 47.77 6.9 65.0 November 405,853 47.69 17.6 296.6 5,183,540 47.69 131,7; 539.8' 69,117 47.69 1.5 210.8 1,761,213: 47,69_' 73,2 ; 559.7.`. 0 47.69 0.0 65.0 December 984,645 64.63 57,9 354.6 _4,182,14.4 64.63. 143.9 683,7 545,224 64.63 16.3 227.1 889,953 6463": 50.1 609.8.: 73,800 64.63 6.5 71.5 January 732,742 55.64 37.1 391.7 2,295,026 55.64 68,0 7517: 619,865 55,64 16.0 243.1 1,541,375'. 55.64` 74.7 : 6845' 30,600 55.64 2,3 73.8 February 859,822 58.95 46.1 437.8 3,054,51.9 58.95. 95.9. 847.6; 0 58.95 0.0 243.1 1,697,237; 58.95 87.2 771.7I 465,884 58.95 37.4 111.3 March 936,566 49.93 42.6 480.4 2,595,923 49.93` 69.0` r 9916 6 0 49.93 0.0 243.1 1,776,821 49,93 77.3.` 849 1 68,808 49.93 4.7 115.9 12 Month Floating PAN Load 7„,480,4 916 6 / 243.1 j 8491 j / 115.9 ` Annual PAN Load Limit /� / (Ibslaclyr): 1 { FORM:NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 Field Name: 08A Field Name: 08B Field Name: 08C Field Name: 09A . Field Name: 09B-Al Area(acres): 30.38 Area(acres): 34.84 Area(acres): 10.75 Area(acres): 30.38 Area(acres): 4.25 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? 0 YES ❑No Field Loaded? ❑YES 2 NO Field Loaded? ❑YES ❑r NO Field Loaded? ❑YES ❑NO Field Loaded? ❑YES ❑� NO a = d � 'm z g z B z g z > Zm z c z a z c z . z oL° z o." a w a a v a a w a o 0. a oa > 3 c a - a > v o. a oa o EL a. -0 + o a °- mry .F 2 a °- L ;. EY °- tG °- :, o a EL aI:, 7., oa).-+ a m aj >, eaIJ a of +-, >,, co � J a of .-' ?• a � J a m .. >, a1 o a a, a-, 7, ro ro �E m ° � z 2 z °' o y or o w z© Zr, o � � m c -� E J z EU °' Q a ° o sa3 ` uo � §o o o Q .c 0 p C.) C.) 0 Ua aU aU < 0 E < 3 E ; < 0 Ej . j Month gal mg/L Ibslac lbs/ac gal mg/L lbs/ac lbslac` gal mg1L lbs/ac lbs/ac gal mg1L lbs/ac lbslac.. gal mg/L lbslac Ibslac April 1,949,388 55.03 29.4 29.4 2,417,309 55,03 318 318': 1,386,041 55,03 59.2 59.2 1,567,934 :55:03 23.7:. 237.; 0 55.03 0.0 0.0 May 2,071,552 59,21 33.7 63.1 1,247854 59.21 17.7 49,5 696,507 59.21 32.0 91.2 3,155594 5921 51..3. 750 178,630 59.21 20.8 20.8 mm _ June 2,571,119 48.56 34.3 97.4 1299,642 48.56 151 646 2,109,108 48.56 79.5 170.6 1,702,326 4856 22.7 977 ' 521,030 48.56 49.6 70,4 July 0 73.26 0.0 97.4 0 73.26 0,0 64.6 2,024,002 73.26 115.0 285.7 1,652,267 73.26 33.2. 130.9 554,855 -73.26 79.8 150.2 August 3,638,989 41.28 41.2 138,6 1,251,381 41,28 12.4 77.0 '! 2,301,149 41.28` 73.7 359.4 346,641 4128 3,9;` 134 8: 577,563 41,28 46.8 197.0 September 1,065,432 47 13.7 152.4 2,494595. 47 281 105.1 356,421 47 13.0 372.4 > 372,831 47 4.8 139.6` 334,474 47 30.8 227.8 October 0 47.77 0.0 152.4 658,902 47.77 7.5... 1.12.61; 1,726,929 47.77 64.0 436.4 '3,293,219 47.77 43.2 182.8 83,308 47.77 7.8 235.6 November 127,328 _' 47.69 1.7 154.0 427322 4769 49 1175.` 2,576,950 47.69 95.3 531.7 '2,582,889 4769 338 2166 171,224 47.69 16.0 251.6 December 0 64.63 0.0 154.0 455,440 64.63 7.0 124,5. 864,441 64.63 43.3 575,0 [1,905,280 64.63 33.8 250.4 0 64.63 0.0 251.6 January 1,529,315 55.64 23.4 177.4 0 55,64 0,0. 124.5 0 55.64 0.0 575,0 2,698,917 55.64 41,2. 2917 0 55.64 0.0 251.6 February 2,715,153 58.95 43.9 221.3 0 ... 58,95 0.0 124/, ,„„r.5 0 58,95 0,0 575.0 3,046,687 58.95 49.3, 341.0' 84,516 58.95 9.8 261.4 March , 2,585,658 , 49.93 35.4 256.8 0 49.93 .0 0 ... .124.6 0 49.93 0,0 5 7 5.0 2,927 627 .49.93 40.1 381..1 0 49.93 0.0 261.4 12 Month Floating PAN Load .,,,7/., 256.8 124,5 575,0 �` 381,1 ;, 261.4 (Ibslaclyr): Annual PAN Load Limit (Ibslaclyr): A 4 FORM: NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT(NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 Field Name: 09B-A2 Field Name: 09B B1 Field Name: 09B-B2 Field Name: 09C Field Name: 10A Area(acres): 3.85 Area(acres): 1.75 Area(acres): 11.01 Area(acres): 21.48 Area(acres): 15.19 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑YES ❑NO Field Loaded? ❑YES 1 NO Field Loaded? ❑YES El NO Field Loaded? 0 YES:' ❑NO Field Loaded? ❑YES ❑NO m z g z m z c z m z g z o z g z m z c Z o ¢ 0 4 a ¢ $ Q Q ° a ° o Q ° Q a a < a Q a, a 0- ;ti o- a O a °' L 4 ,� o Q. fl, E 0- a o p- Q l�9 �` -6 ' o - a. d °' ,� 'Q o +J Q m � ro Q m +, ApF _1 ¢ m +• >, � _ Q dr- A Q m >. � .� O a' y z a' m z J z °' y z as m et _1 c z a Q o U a i o '' a U a': a > o o U a cu a U > o o U a 7 Q V E 0 Q V 0 a U 2 o 4 U ` = -6 ¢ U Month gal mglL lbs/ac lbs/ac gal mg/L lbs/ac lbs/ac gal mg/L lbs/ac lbslac gal mg1L lbs/ac lbs/ac gal mgiL lbs/ac lbslac April 0 55.03 0.0 0.0 43,042 55.03. 11.3 11.3`:' 0 55,03 0 0 0.0 852,053 I: 55.03. 18.2;i` 18.2`; 0 55.03 0.0 0.0 May 178,630 59.21 22.9 22,9 188,183` 59.2 53.1:; 64,4 188,184 59.21 8.4 8.4 2059,942'; 59.21'' 47.4 65.6' 3,034,112 59.21 98.6 98.6 June 443,048 48.56 46.6 69.5 372,517 48.56', 86,2' 150,6 1,132,696 48.56 41.7 50.1 1,072,031` 48,56 20.2 85,8 634,368 48.56 16,9 115.5 July 493,177 73.26 78.3 147.8 391,323:` 73:26' 136.6. 2872 895,844 73.26 49.7 99.8 0 73.26 0.0 85.8. 0 73.26 0,0 115.5 August 84,173 41.28 7.5 155.3 306,313 41.28: 60.3;, 347;5r' 619,770 41.28 19.4 119.2 0 41.28'r: 0.0 .' 85.8 201,951 41.28 4.6 120.1 September 0 47 0.0 155.3 115,090' 47 ';: 25.8 is 373.3, 0 47 0.0 119.2 677,624'' 47 12.4 98.1 ; 1,078,432 47 27.8 148.0 October 0 47.77 0.0 155.3 35,859 47.77; 8,2 381.4; 77,767 47,77 2.8 122.0 2,287,518 47.77 42.4` 140:6: 2,299,937 47.77 60.3 208.3 November 0 47.69 0.0 1553 86,914 47.69 19.8 401 2 235,199 47.69 8.5 130.5 2,061,227: 47.69.i; 38.2 ; 178.7: 1,316,424 47.69 34.5 242.7 December 0 64.63 0.0 155.3 0 64.63` 0.0 401.2 0 64.63 0.0 130.5 1,473,884 64.63 37.0 :; 215,7 1,909,356 64.63 67.8 310.5 January 0 55.64 0.0 155.3 0 55,64 0.0, 4012; 0 55.64 0.0 130.5 640,750..' 55,64 13.8;J 229.6` 1,363,178 55.64 41.6 352.1 l February 0 58,95 0.0 155.3 94,516: 58.95 26.6); 427,7i 10,000 58.95 0.4 131.0 1533,508.' 58.95 35.1 264.7 1,985,175 58.95 64.3 416.4 March 0 49.93 0.0 155,3 0 49.93i 0.0 427.7(i 0 49.93 0,0 131.0 1,894,205: 49.93 36,7 301.4`: 1,238,664 49.93 34.0 450.4 12 Month Floating PAN Load / % 427 7 �// �� �� 131.0 + �/� /� ` 45fl.4 (lbslaclyr): Annual PAN Load Limit V/ V �/ V V / i // .ff., / V i (lbslaclyr): FORM: NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 Field Name: 10B Field Name: ;10C Field Name: 11 Field Name: 12 Field Name: 13 Area(acres): 31.42 Area(acres). 19.8 Area(acres): 26.13 Area(acres): 17,78 Area(acres): 23.26 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop. Coastal Cover Crop: Coastal Load Type: PAN Load Type. PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑e YES ❑NO Field Loaded? Q YES ❑NO Field Loaded? 0 YES Li NO Field Loaded? 0 YES ❑NO Field Loaded? I]YES ❑NO > 13 • E> >o. aaL a -0 o a °" a 13 - o a a m a so D. L a ,.. :o a ° fl m- - Jo ttlq m �C e >0 � m � m J Ne 0 3Z Fund .o cZ oe = = p fi Q yc J Z E aQ , Z Em o o Q - c a U ° o o Ua _ , 3 Q E ;c :J aE an o v ° o: o va c1 z ✓ o• o p °Q v Q UE o Q V E o Q U E ? Q n o Q U EV Month gal mg/L lbs/ac lbs/ac gal mg/L lbs/ac lbslac gal mg/L lbs/ac lbslac ;; gal mg!L lbs/ac lbs/ac gal mg/L Ibslac lbs/ac April 2,806,780 55.03 41.0 41,0 i'93,840 55,03 22 22 3,001,132 55.03 52.7 52.7 613,187; 55.03 15.8 158;;' 408,733 55.03 8.1 8.1 May 352,924 59.21 5.5 46.5 1,242300 59,21 31;0 33•2 2,118,684 59.21 40.0 92.8 0 59.21 0.0:: 15.8. 1,623,329 59.21 34.5 42.5 June 1,888,761 48.56 24.3 70.9 0 , 48.66 0.0 33.2 1,883,802 48.56 29.2 121.9 66,841:' 48.56 1.5 17.4 1 1,987,356 48,56 34.6 77.1 July 3,243,207 73.26 63.1 134.0 1,304,294 73.26 40.2 73:4 ':' 3,154,288_73,26 73.8 195.7 '; 0 73.26 0.0 17.4}; 3,192,618 73.26 83.9 161.0 August 3,209,364 41.28 35.2 169.1 3,371,727 41.28 586 132,0 1,842,184 41.28 M 24,3 220,0 438,618 41 28 85.. 25.8 3,871,234 41.28 57.3 218,3 September 1,157,875 47 14.4 183.6 0 47 00 1320 870,409 47 13.1 233.0 0 47 0,0 258 6,143,058 47 103.5 321.8 October 4,015,244 47.77_W 50.9 234.5 1,364,509 47.77 27.5 1595: 1,256,272 47.77 19.2 252.2 251,755 47.77 5.6: 31.5- 2,377,503 47.77 40.7 362.5 November 4,134,402„ 47.69 52.3 286.8 ;2,474522 4769 49.7 209.2 989,660 47.69 15.1 267.3 0 ;;: 4769 0.0 315 1,584,025 47.69 27.1 389.6 December 1,416,194 64.63 24.3 311.1 2,030,578 6463 553 264.5;' 1,255,650 64.63 25,9 293.2 ; 0 64.63 0.0 31:5 1,145,021 64.63 26.5 416.2 January 467,526 55.64 6.9 318.0 1,221,261 5564 28,6 2931. 2,236,514 55.64 39.7 332.9 ''a528,294 55.64 138 45.3 1,699,581 55.64 33.9 450,1 February 965,697 58.95 15.1 333.1 2,167,460 58 95 53 8.. 346.9 1,519,717 58.95 28.6 361.5 283,133 58.95 7.8: 53.1 946,753 58.95 20.0 470.1 March 1,929,748 49,93 25.6 358.7 2,3.81,247 49.93 50„1 397.0 2,814,916 49.93 44.9 406.3 882,293 49.93 20.7 .73.8 1,817,747 49.93 32.5 502.6 12 Month Floating PAN Load 358.7 j 397.0 % 406.3 , 73.8 1 / 502.6 J(lbslaclyr): Annual PAN Load Limit (lbs/aclyr): A / ` A A FORM:NDMLR 08-11 NON-DISCHARGE MASS LOADING REPORT(NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 Field Name: 14 Field Name: 15c Field Name: 16 Field Name: 18 Field Name: Area(acres): 12.07 Area(acres). 18.03 Area(acres): 12.95 Area(acres): 2,25 Area(acres): Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Load Type: PAN Load Type. PAN Load Type: PAN Load Type: PAN Load Type: Field Loaded? ❑YES ❑No Field Loaded? 0 YES ❑No Field Loaded? El YES ❑NO Field Loaded? 0 YES ❑NO Field Loaded? ❑YES ❑No 13 Z 0 Z y Z o Z N Z P z CO Z 0 Z N v p 0 CO to a a e Q > 2 a. cLL w Oa. 'i. 13-, c6 o. d v OL '.> R a IL' w < ? 10 2 a (6 ..1 a) a o v o v o a L° o . o a in m .o p LC Z Lv �> cam' E � ``° u � E Z LC J >W £ > o . £ o a j 0 0 0 a 2 > 0 fl U . 9 0 O V a- 2 > 0 O V a 2 Q oo o 0 Month gal rng/L lbs/ac lbs/ac gal mg/L' Ibslac lbslac gal , mg/L lbs/ac lbs/ac gal mg/L'mm lbslac lbslac gal _ mg/L lbs/ac lbs/ac April 664,461 55.03 25.3 25.3 2,682,7.73 55 03. 68.3. 68.3::j 2,135,726 55.03 75.7 75.7 301,248;;; 55,03 61,4 61,4.; May 1,611,521 59.21 65.9 91.2 904,326.!; `59,21 24,8 93.1 474,070 59.21 18.1 93.8 288,126.;' 59.21 63.2 124.7;`? June 1,017,055 48.56 34.1 125.3 1,798,258 4856 404;: 133,4 443,527 48.56 13.9 107.6 419,042 48.56` 75.4 200.1; July 1,147,964 73.26 58.1 183.4 899,408' 73.26. 30.5.i 163,9.. 2,322,877 73.26 109.E 217.2 167,247 ' 73.26. 45.4`': 245.5 A .' August 1,312,690 41.28 37.4 220.9 674,235` 41,28 12.9 176.8 2,347,813 41.28 62.4 279.6 475,765 41.28 72.8 : 318.3': September 278,102 47 9.0 229.9 2,146,391 47;` 467,' 223.5.; 1,930,150 47 58.4 338.1 171,275; 47 29.8'. 348,2 October 1,262,728 47.77 41.7 271.6 1,123,071 47.77 24,8' 248.3 523,100 47.77 16.1 354,2 113,945 47.77 202 r 368.3 November 1,164,542 47.69 38.4 mm 310.0 . 482,1412 `4769. 10,6' 258.9 31,700 47.69 1,0 355.1 155,736 47.69 27.5r 395,9 December 1,738,826 64.63 77.7 387.6 1,304,634 64,63 39.0' 297.9: 0 64.63 0,0 355.1 256,510 1 6463. 61,5 457,3 January 1,144,128 55.64 44.0 431.6 1,752595 55.64 45.1 34310. 1,810,299 55.64 64.9 420.0 384,1.91 ' 5564, 79,2 _ 536.6.. February 1,218,135 58.95 49.6 481.2 '2,069,793 .58 95 56.4' 399.5: 2,448,473 58,95 93.0 513.0 232,527 '` 58,95 50,8 587.4; March 479,056 49.93 16.5 497.7 2,370 320. 49.93 54.7! 454.2 2,265,627 49,93 72.9 585.8 219,775` 4.9,93 40,7 628.0`i 12 Month Floating PAN Load / / / / /A-. (Ibslactyr); 497.7 %//l 454.2 585.8 6284. D.0 + Annual PAN Load Limit e (lbs/ac/yr): //". A. i FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PPI: 001 Flow Measuring Point: ❑r Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent El Groundwater Lowering ❑Surface Water Parameter Code —0- 50050 O ro ~ U E Ct 0 [K _ O 24-hr hrs GPD 1 07:00 8.5 47500..i 2 07:00 8.5 50,300 3 07:00 8.5 54,600 . 4 07:00 8,5 44,900 5 06:00 9 0 6 73,300 7 07:00 8.5 47,100..,' 8 06:00 9 58,800 9 07:00 8.5 55,400 10 07:00 8.5 57000 .� 11 07:00 8.5 59,300 12 0 13 107,200 14 07:00 8.5 38,800 15 07:00 8.5 53,300 :' 16 07:00 8.5 53,400. 17 07:00 8.5 57,700 18 07:00 8.5 61;400 19 07:00 8.5 0 20 174,300 21 07:00 8.5 98,400 22 07:00 8.5 83,600 23 07:00 8.5 59,500 24 07:00 8 7.3,900. : 25 07:00 8.5 79,500 26 06:00 9 >0 27 99,800 28 07:00 8.5 40,300 29 07:00 8.5 49,900 w 30 07:00 8,5 48,600 31 07:00 8.5 58,300: Average: 57,619 Daily Maximum: 174,300 Daily Minimum: 0 Sampling Type: Estimate. Monthly Limit: Daily Limit. Sample Frequency: `:Monthly.':_' FORM: NOMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 _ Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PPI: 002 Flow Measuring Point: II Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code --► 50050 c _ _ O •E °` a }- li t1C 0 CJ tY 24-hr hrs GRID 1 07:00 8.5 0 2 07:00 8.5 0 3 07:00 8.5 0 4 07:00 8.5 0 — 5 06:00 9 0 6 0 7 07:00 8.5 0 8 06:00 9 0 9 07:00 8.5 5000 10 07:00 8.5 0 11 07:00 8.5 55,000 12 0 13 345;000 14 07:00 8.5 0 15 07:00 8.5 0 16 07:00 8.5 0 17 07:00 8.5 10000 18 07:00 8.5 0 19 07:00 8.5 0 20 0 21 07:00 8.5 0 22 07:00 8.5 0 23 07:00 8.5 22,000 24 07:00 8 240000 25 07:00 8.5 95,000 26 06:00 9 0 27 0 28 07:00 8.5 0 ....'> 29 07:00 8.5 0 30 07:00 8.5 0 31 07:00 8.5 15,000 Average: 25,387 Daily Maximum: 345000. — Daily Minimum: ;0 Sampling Type: Estimate Monthly Limit Daily Limit: Sample Frequency: Monthly FORM: NDMR 03712 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt, Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PPI: 003 Flow Measuring Point: ❑Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code ---► 50D50. `. c 0 d >, E o. Q m i= )� — o O O 1 07:00 8.5 ' :;:0::::.:. 2 07:00 8.5 0'::. 4 07:00 8.5 :::0. :........ . 5 06:00 9 :. : 0:. :: 6 ' 1700 7 07:00 8.5 14,000 B 06:00 9 0.. .' .. 10 07:00 8.5 0 .: 11 07:00 8.5 0 . : 12 :. .:::..0: 13 :::0:` 14 07:00 8.5 120;000::: .. .... . .. . . 15 07:00 8.5 216,t700.:: 16 07:00 8.5 . ......:.. 17 07:00 8.5 :::3Q000::: 19 07:00 8.5 20 0: ::. 21 07:00 _ 8.5 :65,000.:.: 22 07:00 8.5 :: 38 DOA.' 23 07:00 8.5 : ::0 24 07:00 8 :0:: .'::.. 25 07:00 8.5 i ::0:: ;. .... .:....::.. .......:...::.: 27 28 07:00 8.5 2:15;000..:. 29 07:00 8.5 :.0: .::.; 30 07:00 8.5 136;.000: 31 07:00 8.5 4,000::': Average: i 30,7:10:: _ Daily Maximum: '216,000 Daily Minimum: - 0 Sampling Type: Estimate:..: Monthly Limit: ::. ... ..:... Daily Limit: Sample Frequency: 14Rorsthly _ . FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No,: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PPI: 004 Flow Measuring Point: ❑Influent ❑✓ Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent I]Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code -4 50050 ; 00310 00916 00680 00940 50060 31616. 00927 00630 00610 00625 ` 00620 00556 00400 WQ09C 00931 - O c E asN c i O O o o ,N a Li :- c .,, E o t 7 a m o a o ea m UE= = 0 CO 4.a c E- y r I.Y. o rn « z ,t w z o8 a V. w o m a O o U cec.) 0 z z - . z c000 o 1- o o 24-hr hrs GPD; mglL mgll_ I' mg1L mg/L ` mglL 4/100 mL mglL mg1L mglL mglL. '; mgiL mglL su mg1L a Ratio 1 07:00 8.5 1,631,000; . 2 07:00 8,5 1,550,000. 0.51 _ 7.49 3 07:00 8.5 1,839,000- 297 11.5 78,8 0.72 ?24196; 6.28 1.09: <0.2 133... i 0.89 102 7.29 41;03 ;' 11,25 4 07:00 8.5 1,851,000, 0,6 7.43 5 06:00 9 1,631.,000 0.9 7.43 6 1,514,000': 0.27 7.48 7 07:00 8.5 1,84.3,000..` 0.31 7.49 8 06:00 9 1,409,000 9 07:00 8.5 1,770,000.w 0.57 _ 7.48 ...._ 10 07:00 8.5 1,503 000.: 0.34 7.59 11 07:00 8.5 1,364 000; 0,38 7.48 12 1,320,000 13 1,218,000 0.48 7,41 14 07:00 8.5 1,223,000 0.6 7.61 15 07:00 8.5 1,430,000 253 12.3. 108 0.37 10 5.95 0,04 :` 76.2 145 `:: <0.02 14,4 7.58 58 83;':: 11.59 16 07:00 8.5 1,370,000' 0.66 7.5 17 07:00 8.5 1,542,000.' 0.49 7.56 18 07:00 8.5 1,279,000,'. 0.29 7.29 19 07:00 8,5 1,277,000 0.83 7,39 20 1,374,000 0.53 21 07:00 8.5 1,224,000: 0,3 7.57 22 07:00 8.5 1,131,000 1.13 7.45 23 07:00 8.5 1,156,000 0.65 7.49 24 07:00 8 0 25 07:00 8.5 1000,000.. 0.99 7.32 26 06:00 9 1,427,000` 0.71 7.49 27 1,447,00t7. 0.52 7.78 28 07:00 8.5 1003,000;. ' 1.47 7.47 29 07:00 8.5 990,000' 1.38 7.65 30 07:00 8.5 134.3,000:; 0.51 7.58 31 07:00 8.5 761,000.`r 0.68 7.6 Average: 1,336,129 275.00 11.90 '. 93.40 0.64 316 6.12 0.57; 38,10 139,00 :: 0.45 _ 12.30 ` 4993 11.42 Daily Maximum 1,851,000 297,00 12.30 ; 108.00 1.47 10.00 6.28 1.09.; 76.20 145.00:: 0.89 14.40 7.78 58.83 11,59 Daily Minimum: 0 253,00 1150 78.80 0.27 10.00' 5.95 0.04< :' 0.20 133.00 0.02 10.20 i:` 7.29 4103. 11.25 Sampling Type: Recorder Grab Grab ` Grab Grab Grab Grab Grab Grab ' Grab Grab Grab Grab Grab Calculated Calculated Monthly Limit: Daily Limit: Sample Frequency: Continuous 2 x Month 2 x;Month.` 2 x Month 3 x Year.! 5 x Week 2,x:Month' 2 x Month 2 x Month`. 2 x Month ;2 x Month 2 x Month 2 x Month':: 5 x Week 2 x.Month 2 x Month FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility f- County: Duplin Month: March Year: 2022 PP!: 004 Flow Measuring Point: ❑Influent Q Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent Q Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code --► :. 009.29 70300 '00530 00600 90665 c ON V f..., U7 .::::0:. .: :: F u, a F::°�:0 I— ; I, N .. o ix 24-hr hrs :'inglL.: : mglL :`:mglL:. mglL mg1L .: 1 07:00 8.5 : T _ 2 07:00 $.5 3 07:00 8.5 ;..191...;:'.:: `:`393. '.:: 134 28:4':." ,... ... ,::. 4 07:00 8.5 5 06:00 9 6 7 07:00 8.5 8 06:00 9 9 07:00 8.5 10 07:00 8.5 11 07:00 8.5 12 13 14 07:00 8.5 ...... .. 15 07:00 8.5 198'':'. 235;.::. 145 ':'28.2:.:: 16 07:00 8.5 17 07:00 8,5 18 07:00 8.5 19 07:00 8.5 20 21 07:00 8.5 22 07:00 8.5 23 07:00 8.5 24 07:00 8 ' : ::... . . 25 07:00 8.5 :. 26 06:00 9 27 „...:...,. 28 07:00 8.5 :...: . .: .:. .. ..:...... 29 07:00 8.5 ,...: ................: 30 07:00 8.5 31 07:00 8.5 Average: 194.50: 273.00: 139.50 28:30;. Daily Maximum: 198:00: :::31:1 00 145.00 28:40; . Daily Minimum: .:.191.00 :235;00 134.00 28:20 .. Yp Grab.: . ::::..... . Samplinge: .; Grab ;: Grab ;..Grab.. :. Grab Monthly Limit: Daily Limit: ` : .: Sample Frequency: ..2 x Month 3 x Year 2.x:Month. • FORM:NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PPI: 005 Flow Measuring Point: ['Influent LI Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater Lowering Q Surface Water Parameter Code -► 00680 31616 p0610 00625 : :Ol62p 00400 c o:::; To p 'c ; E - . 'u C .L• 0Em a.c _ c mm' 11 Occ r Z a o ::.:.i:::.... . 24-hr hrs `.mg/I, ':: #I100 mL .:: ; .:. mg1L'.:: mglL m91L:':.r su 1 07:00 • 8.5 2 07:00 8.6 - 3 07:00 8.5 :::: .: 8:3:: 60 <0:1 . 0.6 ;:0;62::: 6.17 4 07:00 8.5 5 06:00 9 . 6 7 07:0 ,. .. . ::.. 8 06:00 9 9 07:00 - 8.5 10 07:00 8.5 11 07:00 8.5 12 13 14 07:00 8.5 _ 15 07:00 8.5 16 07:00 8.5 ..... ..... 17 07:00 8.5 . ......... 18 07:00 8.5 ,.... 19 07:00 8.5 r. 20 21 07:00 8.5 22 07:00 8.5 23 07:00 8.5 24 07:00 8 25 07:00 8,5 26 06:00 9 27 28 07:00 8.5 29 07:00 8.5 :...... 30 07:00 8.5 31 07:00 8.5 Average: ;.:.830.::::. 60.00 0.017;.';: 0.60 0;62 Daily Maximum: 8;30 60.00 ::0.10::: 0.60 062.::.,. 6.17 ;:::.::. . DailyMinimum:" . 0.00 0.10 0.60 0.62:::' 6.17 Sampling Type: Grail.:. Grab Grab. :.. Grab Grab Grab Monthly Limit: Daily Limit: Sample Frequency: - - .- Ntonthly.:: Monthly ::Monthly.. Monthly y:. Monthly ..Month) FORM:NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March [ Year: 2022 PM: 006 Flow Measuring Point: ❑influent ❑Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater towering ❑.+ Surface Water Parameter Code -► . 00680 31616 0.0610:: 00625 00620 00400 fa E 13 gl) E ci) � - A. a - � n ::;2:::.... x, QVE - a , if, En _ p Q p eO o:. -. t- 24-hr hrs :.;;mg/L: #1100 mL ::::mglL:::.:: mg1L :.:mg/L;:: su 1 07:00 8.5 2 07:00 8.5 : ... ........: 3 07:00 8.5 1;7 <5 �0,1 :. O.ii 16;4.'.:... 5.92 .:.. 4 07:00 8.5 5 06:00 9 6 - 7 07:00 8.5 8 06:00 9 9 07:00 8.5 : . 10 07:00 8.5 11 07:00 8.5 12 13 14 07:00 8.5 15 07:00 8.5 ,... 16 07:00 8.5 ........:.... 17 07:00 8.5 18 07:00 8.5 19 07:00 8.5 20 21 07:00 8.5 ';: 22 07:00 $.5 23 07:00 8.5 ::.:.. 24 07:00 i 8 25 07:00 8.5 26 06:00 9 «.. 27 28 07:00 8.5 29 07:00 8.5 .:.. :.:.:.... . 30 07:00 8.5 31 07:00 8.5 Average: :;.1.70:: 1.00 _ - 0:0o. ;.. 0.60 10;40:: Daily Maximum: .:.....1.70 ::: 5.00 0,10::: 1 0.60 ::16,40 5.92 Daily Minimum: 1;70: :: . 5.00 0.90. 0.60 16:40..:' 5.92 . :" . Sampling Type: . ::Grab.: Grab Grab Grab Grab Grab Monthly Limit: ::.. : Daily Limit: :..:...... Frequency: Sample Fre p q y .::.Monihly. : Monthly Monthly: Monthly MoniFily: :, Monthly FORM:NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PP!: 007 Flow Measuring Point: ❑Influent ❑Effluent ❑No Flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater Lowering Q Surface Water i Parameter Code -► Q0680.::. 31616 00610.::: 00625 00620.:: 00400 .. Ca ce U ::"-.4- U.. .. U ::a;:: . .4 ::;:0 � E3 24-hr hrs :::... g. .. . m. 1L': : #M00 mL ..:.tr3 !L m IL g g. g m.g1L:;':. su 1 07:00 8.5 2 07:00 8.5 ..: 3 07:00 8.5 . :. :. .. '.' 4.:5. :`:.. 130 ,.:.0,57:. .:. 1.1 21 :. .: 6.4 4 07:00 8.5 :: 5 06:00 9 :. 6 8 06:00 9 9 07:00 8.5 10 07:00 8.5 11 07:00 8.5 . ..:.... .. 12 13 14 07:00 8.5 15 07:00 8.5 - 16 07:00 8.5 17 07:00 8.5 18 07:00 8.5 19 07:00 8.5 20 21 07:00 8.5 22 07:00 8.5 23 07:00 8.5 24 07:00 8 : 25 07:00 8.5 26 06:00 9 27 28 07:00 8.5 29 07:00 8.5 30 07:00 8.5 31 07:00 8.5 Average: .: 4:50 130.00 ::;.:::::0;57 1.10 :21;00 Daily Maximum: ::.4:50.: :. 130.00 2 :. 6.40 .0.57:.: 1.10 1;;00 Daily Minimum: 4.50 :. 130.00 >:::;0.57: 1.10 . .21..00 6.40 Sampling Type: Grab` Grab Grab Grab :Grab:: Grab Monthly Limit: :: : Daily Limit: Sample Frequency: ';:.Monthl . : , Monthly Y Monthly M Y :Monthly Y Monthly.:`. Monthly FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PP!: 008 Flow Measuring Point: ❑Influent LI Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater Lowering 0 Surface Water Parameter Code -► 00680. . 31616 : 00610 00625 :: 00620 :. 00400 a : ;o ' To" 0 m H :. Ev .v u. a ,.::. .:E ; ::. � � z ;: 0 0 ;o .: `� . :. o .:..:... ... .. . 24-hr hrs mglL #1100 mL mg1L; mglL mglL'. su 3 07:00 8.5 7r1.;;: 10 <.0.9.`.'::: 0.6 4:01:..: 6.61 4 07:00 8.5 5 06:00 9 6 7 07:00 8.5 8 06:00 9 9 07:00 8.5 10 07:00 8.5 11 07:00 8.5 :..:... 12 13 14 07:00 8.5 15 07:00 8.5 16 07:00 8.5 17 07:00 8.5 18 07:00 8.5 19 07:00 8.5 20 21 07:00 8.5 ....: ... 22 07:00 8.5 ::.: . 23 07:00 8.5 :::.:..: :.: 24 07:00 8 25 07:00 8.5 26 06:00 9 27 28 07:00 8.5 29 07:00 8.5 30 07:00 8.5 31 07:00 8.5 Average: 7:70 .::': 10.00 '::;0:00:.: 0.60 4:01` ,. . ,. .. :...: Daily Maximum: ;710::;:: 10.00 Daily Minimum: :.'.:::710:;:.::. 10.00 0,10.: 0.60 4:01:..: 6.61 Sampling Type: Grab:: : Grab Grab::; . Grab _ ::;..:Grab Grab Monthly Limit: . .. Daily Limit: Sample Frequency: monthly.. Monthly :Monthly' Monthly Monthly. Monthly FORM: NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page of 1 Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: March Year: 2022 PPI: 009 Flow Measuring Point: ❑Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: LI Influent ❑Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code --4 . 00680:: 31616 00610.':: 00625 :..00620. 00400 is 0 ;..:c' ::. CO el Pe _:.R. . ` H _ .- O ,o... o 0 24-hr hrs mglL #1100 mL ::`:ing1L mg1L mg!L': su 1 07:00 8.5 j::.::.,::..::'. 2 07:00 8.5 3 07:00 8.5 2:6 . ::: S <D:1.: .'. 0.6 13,24:::'. 5.8 4 07:00 8.5 5 g6:00 9 : . 6 7 07:00 8.5 8 06:00 9 9 07:00 8.5 10 07:00 8.5 m 11 07:00 8.5 . . 12 - 13 14 07:00 8.5 15 07:00 8.5 :.::: :. 16 07:00 8.5 :':i.::.:. 17 07:00 8.5 . 18 07:00 8.5 19 07:00 8.5 20 - 21 07:00 8.5 • :. ... 22 07:00 8.5 23 07:00 8.5 24 07:00 8 _ 25 07:00 8.5 .. ., .. 26 06:00 9 : : :.. ...:..: 27 28 07:00 8.5 :::::: 29 07:00 8.5 30 07:00 8.5 31 07:00 8.5 Average: :' ; .2,60 5.00 0:00 : 0.60 Daily Maximum: 2.60 : `. 5.00 ,.. ':.-8.24'. : 5.80 Daily Minimum: : `::2.60. 5.00 :'':8:24.:.. 5.80 :... . Sampling Type: '.':.Grab..:'. Grab ,Grail';" Grab Grab Grab Monthly Limit :..:.:'.. : . Daily Limit: :'..: Sample Frequency: ... : t - . Moritlil :. Monthly Monthl Monthly Y Monthly Monthly Y: