Loading...
HomeMy WebLinkAboutNPDES inspection_AprilWetland Inspection Report Project Num: 20190397 Version: 1 Status: Issued Project Name: NCDOT - Widen NC 105 and Replace Bridge 5 Project Type: Road County: Watau 2566, R-256613, R-2566BA) intena c /repair/improveme Region: nston- ayem Location: NCDOT - Widen NC 105 and Replace Bridge 5 (R-2566, R-256613, R-2566BA) Latitude: +360 11' 40" Longitude: -81° 44' 43" SW Plan Location: Site Owner Name: NC DOT Division 8 Inspection Date: 4/26/2022 Reason for Inspection: Routine Inspection Type: Records/File Review (non -DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: Operation and Maintenance Inspection Summary: Phone: 336-776-9703 page 1 Site Number: 20190397 Owner: Tippett, Lyndo Inspection Date: 4/26/2022 Inspection Type: Records/File Review (non-D( Reason for Visit: Routine Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑ Comment: I reviewed 10 weeks of NPDES records. All records were in order but a few weeks they forgot to answer questions related to observations of turbidity or discharges. I reminded them to complete the records accordingly. A rain gauge was on site. Inspections were conducted once/week and following a 1" storm. SDOs were all in good maintained order. page 2