HomeMy WebLinkAboutNPDES inspection_AprilWetland Inspection Report
Project Num: 20190397 Version: 1 Status: Issued
Project Name: NCDOT - Widen NC 105 and Replace Bridge 5 Project Type: Road
County: Watau 2566, R-256613, R-2566BA) intena c /repair/improveme
Region: nston- ayem
Location: NCDOT - Widen NC 105 and Replace Bridge 5 (R-2566, R-256613, R-2566BA)
Latitude: +360 11' 40" Longitude: -81° 44' 43"
SW Plan Location:
Site Owner Name: NC DOT Division 8
Inspection Date: 4/26/2022
Reason for Inspection: Routine
Inspection Type: Records/File Review (non -DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: NPDES SW - Roadway (DOT)
Question Areas:
Operation and Maintenance
Inspection Summary:
Phone: 336-776-9703
page 1
Site Number: 20190397 Owner: Tippett, Lyndo
Inspection Date: 4/26/2022 Inspection Type: Records/File Review (non-D( Reason for Visit: Routine
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑
Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑
Comment: I reviewed 10 weeks of NPDES records. All records were in order but a few weeks they forgot to
answer questions related to observations of turbidity or discharges. I reminded them to complete the
records accordingly. A rain gauge was on site. Inspections were conducted once/week and following a
1" storm. SDOs were all in good maintained order.
page 2