Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820645_Sludge Survey (Reporting)_20220420
Permit Number: ,2 )7/ /1). 6 6 y 4 /a! ATTN: DENR Representative Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attached is a copy of my most recent Sludge Survey. This survey shows I currently have ft. of permanent liquid treatment storage in my animal waste lagoon, which is more than the required four feet. Based on these findings I request to be exempt from further sludge surveys for the life of my current permit, or the number of years you and your office deem adequate. Thank you for your consideration of this request. Signature of Farm Owner RECENT 3- n - � 2- Date 29 " 9 ; )? Appendix 1. Lagoon Sludge Survvey Form Revised August 2008 A. Farm Permit or DWQ Identification Number Aft,. y : 2r9 6? y,' B. Lagoon Identification 4 �� l C. Person(s) Taking Measurements S5 D. Date ofMeasurements j - ff- ;Z 2 -g5 is E. Methods/Devices Used for Measurement of a. Distance from the lagoon liquid surface:to the top oftheludge layer: .0/ to b. Distance from the lagoon liquid surface to the bottom (soil) ofthe lagoon: c r c. Thickness of the sludge layer making a direct measurement with "core sampler": � F. Lagoon Surface Area (using dimensions at inside top of bank): !, V 2 (acres) (Draw a sketch ofthe lagoon on a separate sheet, list dimensions, and calculate surface area; The lagoon may have been built different than designed, so measurements should be made.) G. Estimate number of sampling points: a. Less than 1.33 acres: Use S points b. If more than 1.33 acres, hdo• Tacxes,x 6 = 9 . with maximum of 24. (Using sketch and dimensions, develop a uniform grid that has the same number of intersections as the estimated number of sampling -points needed. Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) H. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (Appendix 2). Also, at the location of the pump intake, take measurement of distance from liquid surface to top of sludge layer and retard it on the Data Sheet (last roar); this must be at least 2.5 ft_ when irrigating. I. At the time of the sludge survey, also measure the distance from the Maximum Liquid Level to the Present Liquid Level (measure at the lagoon gauge pole): r 7,f T. Determine the distance from the top of bank to the Maximum Liquid Level / 9 " (use lagoon management plan or other lagoon records) K. Determine the distance from the i mum Liquid Level to the Minimum Liquid Level .2 • (use lagoon management plan or other lagoon records) L. Calculate the distance from the present liquid surface level to the Minimum Liquid Level (Item g minus Item 1, assuming the present liquid level is below the Maximum Liquid Level): M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement points): / et>, 5j N. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top of the sludge layer (average for all the measurement points): 6, 2 2 O. Record from the Sludge Survey Data Sheet the average thickmess of the sludge layer. .7, c6 P. Calculate the thickness of the existing Liquid Treatment Zone (item N minus Item L): 57.e›,4 Q. If Item 0 is greater than Item P, proceed to the Worksheet for Sludge Volume and Treatment Volume. If Item 0 is equal to or less than Item P, you do not have to determine volumes. Completed by: SL, e / 8.:.1-ts �/ Print Name Signature J Date: 3- Appendix 2. Sludge Survey Data Sheet* Revised August 2008 Lagoon identification: L D / completed by:.5.1t.0174,9n ea is Print Name Signature Date: 3-g --a-2 (A) Grid Point No. — (B) i Distance from liquid surface to top of sludge - (C) Distance from liquid surface to lagoon bottom. (soil (C) minus (B) Thickness of sludge layer Ft. & in. Ft(tenths) Ft. & in. Ft. (tenths) , Ft. & in. Ft. (tenths) 1 Z. a 16". b 5', /_- f 2 3 Ca ,4 Imo. 6 Li, .2 4 , 9 1 ep, 7 84� 5 5 7./ /o, 5' �_y 1 6 6 7,0 ,re, b .3.� 7 7,2 14%. 7 Si 8 8 .. = : rs f6w 3- 9 6, 1 40,-3 1-/,7. 1 10 7, / /& 3, 7 11 _ 12 L `" 1 , 13 l - 14 I 15 1 16 17 18 19 20 21 22 23 24 Number of points with readings Average of points At pump intake 77 , L le) X /© X /0 �•4S' X X X X *All Grid Points and correspcndinz sludge laver thicknesses must be shown on a sketch attached to this Siudae Survey Data Sheet. See Appendix 4 for conversion from inches to tenths of a foot. io.1 J -5) feciPe Ad_ ) „5" 1' li 1: I ; 1 Hatise 1 ANpets. 1... lezt.eg 3 1 /494 se zRe :. ii ..... ___, ,. ..--r-... Permit Number: , r l02 ATTN: DENR Representative Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attached is a copy of my most recent Sludge Survey. This survey shows I currently have 4671 ft. of permanent liquid treatment storage in my animal waste lagoon, which is more than the required four feet. Based on these findings I request to be exempt from further sludge surveys for the life of my current permit, or the number of years you and your office deem adequate. Thank you for your consideration of this request. Signature of Farm Owner Date RECEIVED APR 2 0 2022 NC DEQ/DWR Central Office Appendix 1. Lagoon Sludge Survey Form Revised August 2008 A. Farm Permit or DWQ Identification Number IV S'. g: B. Lagoon Identification 4, /© 2 C. Person(s) TaldngMeasurements $ e / I•a , ffV D. Date ofMeasuremeuts - 5-- 2- E. Methods/DevicesUsed for Measurement of a. Distance from the lagoon liquid suriaceto the top oftbe4ludge.layer: I Sir' b. Distance from the lagoon liquid surface tothe bottam (soil) ofthe lagoon: .(c1 L. Eft , c. Thickness of the sludge layer if malting a direct measurement with "core sampler": Al F. Lagoon Surface Area (using dimensions at inside top of bank): / y1 (ate) (Draw a sketch ofthe lagoon on a separate sheet, list dimensions, and calculate surface area: The lagoon may have been built different than designed, so measurements should be Made.) G: Estimate number of sampling points: a. Less than 133 acres: Use 8 points - b. If more than 1.33 acres, h yJ 4icresx.6 = 99 with maximum of24. (Using 'sketch and dimensions, develop a uniform grid that has the same number ofintersections as the estimated number of sampling poiti needed. Number the nitersection points on the lagoon grid so that data recorded at each can be easily matched.). H. Conduct sledge survey and record data on "Sludge Survey Data Sheet' (Appendix 2). Also. at the location of the pump intake, take measurement of distance from liquid surface to top of sludge layer and record it on the Data Sheet (fast row); this must be at least 2.5 ft when irrigating. 1. At the time of the sludge -survey, also measure the distance from the Maximum Liquid Level to the Present Liquid Level (measure at the lagoon gauge pole): , 1 Determine the distmice from the top of bank to the Maximnrm Liquid Level / y " (use lagoon management plan or otherlagoon records) K. Determine the distance from the Maximum Liquid Level to the Minin m Liquid Level (use lagoon management place or other lagoon records) L. Calculate the distance from the present liquid surface level to the haulm= Liquid Level /2 9.2 (item K minus Item 1, assumingthe present liquid level is below the Maximum Liquid Level): M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement points): a, N. Record from the Sludge Survey Data Sheet the distance from the present sludge layer (average for all the measaremeent points); liquid surface level to the top ofthe O. Record from the Sludge Survey Data Sheet the average tbiclaress of the sludge layer: 3s $9 F. Calculate the thickness of the existing Liquid Treatment Zone (Item N minus item L): I.e. 2/ Q. if Item 0 is greater than Item P, proceed -to the Worksheet for Sludge Volume and Treatment Volume. If item 0 is.equal to or less than Item P, you do not have in determine volumes. Completed by: Date: 3- Picot Name Signature Appendix 2. Sludge Survey Data Sheet* Revised August 2008 Lagoon Identification: 2 / 6 2 Completed by:J4e/4k 4 ' Print Name Signature (A) Grid Point No. (8) Distance from liquid surface to top of sludge (C) Distance from liquid surface to lagoon bottam_(soil),;c Date: - 7 2 _ (C) minus (B) Thickness of sludge layer Ft & in. Ft(tenths) Ft. & in. 1 Ft. (tenths) Ft & in. 2 3 4 5 6 7 7:r 4 1 , Q les:`l /t9, 6 3, 6 Y4r �•7 Ft (tenths) 8 9 10 7 . 9 r i1, ' le / 3.-3 11 12 Y 13 14 15 16 17 18 19 20 21 22 23 24 Number of points with readings Average of points x At Se8? Msmp ntake ?a 2 x x x x ail Grid Points and corresponding sludge laverthic'messes must be shown on a sketch attached to this Slud a Surve Data Sheet See Appendix 4 for conversion from inches to tenths ofa foot 51 AP, LV 4.• f- II 1-7191a.p x e F7 I t I ? Atreis.e. t I 1 1 1 .2 I , - I .... ;_ „.. Permit Number: 2PS 8.2 0 G 4/1— L. 20/ ATTN: DENR Representative Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attached is a copy of my most recent Sludge Survey. This survey shows I currently have 4", 49 ft. of permanent.liquid treatment storage in my animal waste lagoon, which is more than the required four feet. Based on these findings I request to be exernpt from further sludge surveys for the life of my current permit, or the number of years you and your office deem adequate. Thank you for your consideration of this request. .Signature of Farm Owner iaECENED APR 2 0 2022 NC DEQ/DWR Central Office Date Ronan=1. Lagoon Sludge Survey Form Revised August 2008 A. ±arm remit orDWQ Ident ficationNumber /4 l?1,5 B. Lagoon Identification 1..2 e C. Person(s) Taking Measurements Ste- /74 , ga. its D. Date ofMeasurements 'V— 8 2 2- E. Methods/Devices Used for Measurement of a. Distance from the lagoon liquid surfacelto the top ofthe.sludge layer. dash b. Distance from the lagoon iiqun surface to the bottom (soil) ofthe lagoon: Segied /e c. Thickness of the sludge layer rifafmaking a direct measurement with "core sampler": F. Lagoon Surface Area (using IiimPrPtions at inside top ofbank): : 0 , (acres) (Draw a sketch of the lagoon on a separate sheet, list dimensions, and calculate surface area: The lagoon may have been built different than designed, so measurements should be made.) G. Estimate number of sampling points: a. Less than 133 acres: Tise 8 points b. 7fmore than 1.33 acres, ,2, 'aecres x6 = /3.. whir maximum of24. (Using sketch. and dimensions, develop a uniform grid that has the same number off as the estimated nmaber of satnpling.poiitts needed. Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.). H. Conduct sludge survey and record data on "Sludge Survey Data Sheet' (Appendix 2). Also. at the iocatlon of the pump intake. take measurement of distance from liquid surface to top of sludge layer and retard it on the Data Sheet (last row); this must be at least 2.5 it. when irrigating. 3. At the time of the sludge -survey, also measure the distance from the Maximum Liquid Level to the Present Liquid Level (measure atthe lagoon gaugepole): _ J. Determine the distance front the top of bank to the Maxims Lid Level / ' " (use lagoon management plan or otherlagdon records) K. Determine the distance from the Imam Liquid Level to the Minimum (use lagoon management plan or other lagoon records) Liquid Level , e7 L. Calculate the distance from the present d surface level to the (Item K minus Item I, assuming the present liquid level is below the Minimum Liquid Level e Maxim' Liquid Level): M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement points). q N. Record from the Sludge Survey Data Sheet the distance from the presto sludge layer' (average for all the measurement points): t�;- liquid surface level to the top ofthe O. Record from the Sludge Survey Data Sheet the av athi _e clatess ofthe sludge layer: 2. 0 P. Calculate the thickness of the existing Liquid Treatment Zone item N minus Item L)_4-6 i� Q. If item 0 is greater than item P, proceed -to the Worksheet for Sludge Volume and Treatment Volume. If item 0 is equal to or less than Item P, you do not have to determine volumes. Completed by: h.e m a 's Print Name g�'r Date: c' Signature . . Appendix 2. Sludge Survey Data Sheet* Lagoon ldentif on: 4 2 D / Completed by. Joe ,. i tfs Print Name Signature Revised August 2008 Date: - 8-;2-2. (A) Grid Point (B) Distance from liquid surface to top of sludge (C) Distance from liquid surface to lagoon bottom_(soili . (C) minus (B) Thickness of sludge layer No. Ft. & I-' Ft(tenths) Ft & in. Ft. (tenths) Ft. & in. J Ft (tenths) 1 1 Cin. + L I 7i tr 7 _ _, 2 2 ,.4--,l 1 ! , I: 3 `Z.)7 i 646 I I r,9 1 _ 4 4't b' b, 7 1 /: 9 . 5 _ 5,0 , /.! (y I 6 5,/ 7.,- /2, / 7 41,. 6, .2,� s yi �_ , : 'r. �,- , 2. / - 9 Yid? - , 7• I 2, r RA f . •- -' I .. - b 11 5;,6' 12 13 14 15 16 LA 7 tie 9 2 r .2.i 17 18 19 20 21 22 23 24 Number of points with readings Average of C� pints s CJ J� At pump intake r p t x / X 2, 6y X /Y X Call Grid Points and correspondine sludge layer thiciinesses must be shown on a sketch attached to this Sludge Suivev Data Sheet See Appendix 4 for conversion from inches to tenths ofa foot 41 03 0 3 al 11, Permit Number: h-1a,rS ,2e9!; '15" L. 30I ATTN: DENR Representative Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attached is a copy of my most recent Sludge Survey. This survey shows I currently have 11, 29 ft. of permanent liquid treatment storage in my animal waste lagoon, which is more than the required four feet. Based on these findings I request to be exempt from further sludge surveys for the life of my current permit, or the number of years you and your office deem adequate. r. Thank you for your consideration of this request. Signature of Farm Owner RECEIVED APR S 0 2022 Centraawcbacealw 1 Date 310 Jay" is-- zz 1,1" Appendix 1. Lagoon Sludge Survey Form Revised August 2008 A. Farm Permit orDWQ IdentificationNumber A1K5 B. Lagoon Idefication L 3 0 C. Person(s) Taking Measurements S 4 e /{' atits D. Date of Measurements 3 - / 7 - .- $2d/,4/� E. Methods/Devices Used for Measurement of a. Distance from the lagoon liquid su face to the top oftheetludge layer: V LC b. Distance from the lagoon liquid surface to the bottom (soil) of the lagoon: 5c? /ed /%/i c. Thiclmess of the sludge layer if making a direct measurement with "core sampler": F. Lagoon Surface Area (using dimensions at inside top of bank): 2 , P 2 (acres) (Draw a sketch ofthe lagoon on a separate sheet, list dimensions, and calculate surface area. The lagoon may have been built different than designed, so measurements should be made.) G. Estratate number of sampling points: a Less than 133 acres: Use S points b. If more than I.33 acres, 2, r. iacresx 5 = / .7 , with maximum of24. (Using sketch and dimensions, develop a uniform grid that has the same number of intersections as the estimated number of sampling -points needed. Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) H. Conduct sledge survey and record data on "Sludge Survey Data Sheer((Appendix pendix 2). Also,, at the location of the pump intake, take measurement of distance from liquid surface to top of sludge layer and reberd it on the Data Sheet (last row); this must be at least 2.5 ft. when irrigating. I. At the time of the sludge -survey, also measure the distance from the Maximum Liquid Level m the Present Liquid Level (measure at the lagoon gauge pole): _ 4...1. f 7 Determine the distance from the top of bank to the 1Viaximum Liquid Level / 9 " (use lagoon management plan or other lagoon records) K. Determine the distance from the Maximum Liquid Level to the Minimum Liquid Level /, 8O (use lagoon management plan or other lagoon records) L. Calculate the distance from the present liquid surface level to the mum Liquid Level , 5-5- (Item K minus Item I, assuming the present liquid level is below the Maximum Liquid Level): M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement points): 7. 2 N. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top ofthe sludge layer (average for all the measurement points): �Ly C. Record from the Sludge Survey Data Sheet the average thickness of the sludge layer: Z W P. Calculate the thickness of the existing Liquid Treatment Zone (Item N minus item L): Y.. 9 Q. If Item 0 is greater than item P, proceed -to the Worksheet for Sludge Volume and Treatment Volume. If Item 0 is equal to or less than Item P, you do not have to determine volumes. Completed by: 8J Print Name Date: 3 -12-� y. 3iguature Appendix 2. Sludge Survey Data Sheet* Revised August 2008 Lagoon Identification: 4 ;3 9l Completed by: ,4�e' it-o14 ea.L am, Print Name Signature (A) Grid Point No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Number of readinus Average of points Lit $ �l At pump intake `-/$7 (8) Distance from liquid surface to top of sludge Ft. & in. Ft(tenths) Ir, 4,9 :6 1 '. 1 Le, 9 -41. 3 (C) Distance from liquid surface to lagoon bottom. (soil4 Ft. & in. 76 e y 5 7e 7, .�? 719 9.3 �P 9 #L 2 ?2 7, y a. ", 9. Ft. tenths Date: 3-/7-z2 (C) minus (8) T icicness of sludge layer Ft. & in. Ft tenths points with -TETTE11:1 13 x 7. 5 x l a x 41j X /3 x *A1l Grid points said corresponding. Adze layer thicknesses to this Sludge Surve Data Sheet. See Appendix 4 conversi n from inches to tenths o sketch attached 301 •"'"T fil, Permit Number: 6 zv.5 c.2 D (o V 5 4 Lie) Al TN: DENR Representative Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attached is a copy of my most recent Sludge Survey. This survey shows I currently have S i i 3 ft. of permanent liquid treatment storage in my animal waste lagoon, which is more than the required four feet. Based on these findings I request to be exempt from further sludge surveys for the life of my current permit, or the number of years you and your office deem adequate. Thank you for your consideration of this request. /a17Z- 4'- Signature of Farm Owner "tt NC o0e‘ GOO Date vei25yI Zof'66' Appendix 1. Lagoon Sludge Survey Form A. Farm Permit or DWQ Identification Number B. Lagoon Identification e)r Revised August2008 77Y'S 1S',2©6Y" C. Person(s) Taking Measurements Sh /tom &i?S- D. Date of Measurements 47<—t7- — 2 y E. Methods/Devices Used for Measurement Of a. Distance from the lagoon liquid surflice.p the top ofthe4iudge layer. pd'3'r b. Distance from the lagoon liquid smiace to the bottom (soil) ofthe lagoon: .SC a.I d fT /e c. Thickness ofthe sludge layer if maidng a direct measurementwith "core sampler": - ,41 .. Lagoon Surface Area (using dimensions at inside top ofbank): /, a SS. (acres) (Draw a sketch of the lagoon on a separate sheet, list dimensions, and calculate surface area. The lagoon may have been built different than designed, so measurements should be made.) G. Estimate number of sampling points: a. Less than 133 acres: Use 8 points - b. Ifmore than 1.33 acres, =acres,x 6 = . , with maximum of24. (Using sketch and dimensions, develop a uniform grid that has the same number of intersections as the estimated number of sampling -pouts needed. Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) H. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (Appendix 2). A iso. at the location of the pump intake, take measurement of distance from liquid surface to top of sludge layer and record it on the Data Sheet {last row); this must be at Least 2.5 ft. when irrigating. 1. At the time ofthe sludge survey, also measure the distance from the Maximum Liquid Level to the Present Liquid Level (measure at the lagoon gauge pole): .2, p g L Determine the distance from the top of bank to the Maximum Liquid Level / 9 `r (use lagoon management Om or other lagoon records) K. (Determine the distance from the Maximum Liquid Level to the Minimum Liquid Level j r 0 use lagoon management plan or other lagoon records) L. Calculate the distance from the present liquid surface level to the Minimum (Item K minus Item I, assuming the present liquid level is below the Maximum iiquuiid Level) M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom (average for all the measurement Points): _ N. Record from the Sludge Survey Data Sheet the distance from the sludge layer ( e for all the m present liquid surface level to the top ofthe easuremeat points): O. Record from the Sludge Survey Data Sheet the average thicimess of the sludge brig layer 3 $e P. Calculate the thickness of the existing Liquid Treatment Zone (Item N minus Item L): 3 , /3 Q. If Item 0 is greater than Item P, proceed -to the Worksheet for Sludge Volume and Treatment Volume. If Item 0 is equal to or less than Item P, you do not have to determine volumes. Completed by: „ i2Q/fs. Print Name - Date' �f. 21. rguature Appendix 2. Sludge Survey Data Sheet* Revised August 2008 Lagoon Identification: h `4/P/ Gonipletedby. h,eMolt /_;ads -D C Date: 'f /2-2 Print Name Signature (A) Grid Point No. 2 3 4 5 6 7 8 9 10 11 12 13 (i3) Distance from liquid surface to top of sludge (C) (C) minus (B) Distance from liquid surface Thickness of sludge layer to lagoon bottom. (soil) + Ft. & in. Ft(tenths) I d,2 !ter/ 6, .2 61 �zZ S6 Ft & in. /0,/ I 9, 9 /0..0 10,3 ?, $ 1b: d 9, Ft. (tenths) Ft & in. 9 3, 6' 3,9 3, 9 3.8 yJ D 3. 9 Ft (tenths) 14 15 16 17 18 19 20 21 22 23 24 Number of points with readings Average of points d, D' At Pump intake 8 57 ?s X x X x *Ail Grid Points and cones andin sludge la er thicknesses must be shown on a sketch attached to this Sludge Survey Data Sheet. See Appendix 4 for conversion from inches to tenths of a foot. frt (;) /”. Permit Number: j;' h4 89'46 Les 4 yv2 ATTN: DENR Representative Animal Feeding Operations Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Attached is a copy of my most recent Sludge Survey. This.survey shows I currently have L. 20 ft. of permanent.liquid treatment storage in my animal waste lagoon, which is more than the required four feet. Based on these findings I request to be exempt from father sludge surveys for the life of my current permit, or the number of years you and your office deem adequate. Thank you for your consideration of this request. Signature of Farm Owner ?lG>j-;lz Date 3a `,-/9 "/3 . <� - /, r*8 Appendix 1. Lagoon Sludge Survey Form Revised August 2008 A. Farm Peamit or DWQ Identification Number hl» S 8 .Z 5 B. Lagoon Identification L 41 C. Person(s) Taking Measurements (5j /cam D. Date ofMeasurements E. Methods/Devices Used for Measurement ofi a. Distance from the lagoon liquid {surface io the top of theoalidge layer: b. Distance from the lagoon liquid surface to thebottom (soil) ofthe lagoon led Pe 4 c. Thickness of the sludge lyeif tankting a direct measuremenwith "core sampler": F. Lagoon Surface Area (using dimensions at inside top of bank): ,? ,1 / (acres) (Draw a sketch of the lagoon on a separate sheet, list dimensions, and calculate surface area. The lagoon may have been built different than designed, someasurements should be made.) G. Estimate number of sampling points: a. Less than 133 acres: Use 8 points b. Ifmore than 1.33 acres, 2, 2i-iicres x 6 = /',V . , with maximum of24. (Using sketch and dimensions, develop a uniferfli grid that has the same number of moons as the estimated number of samplingpoints needed. Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) • H. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (Appendix 2). Also, at the location of the pump intake, take measurement of distance from liquid surface to top of sludge layer and record it on the Data Sheet (last row); this must be at least LS ft. when irrigating. I. At the time of the sludge survey, also measure the distance from the Maximum Liquid Level to the Present Liquid Level (measure at the lagoon gauge pole): /t de D. Determine the distance from the top of bank to the Maximum Liquid Level / g " (use lagoon management plea or otherlagoon records) K. Determine thence from the um Liquid Level to theLiquid Level (use lmanagement plan or outer lagoon records) tiiniim .�. 3 _ L. Calculate the distance from the present liquid stance level to. the Ifinimum(Item K minus item I, assuming the present liquid level is below the MaximLevel): • M. Record from the Sludge Survey Data Sheet the distance from the bottom (average for all the measurement points): `ir, g' i t surface level to the lagoon N. Record from the Sludge Survey Data Sheet the distance from tht: sludge layer (aver for all the measurement oints : present liquid sniface level to the top ofthe O. Record from the Sludge Survey Data Sheet the average thickness of the sludge layer: Y d 3 P. Calculate the thickness of the existing Liquid Treatment Zone (Item N minus Item L): _ 4, 2.0 Q. If Item 0 is greater than Item P, proceed -to the Worksheet for Sludge Volume and Treatment Volume. If Item 0 is equal to or less than Item P, you do not have to determine volumes. Completed by: ..�%e!% ,was Print Name Date' 3 //�- Sig� Appendix 2. Sludge Survey Data Sheet* Lagoon Identification: L �' d Revised August 2008 Uompleted by. j �e-liant &its" ..4qc: Print Name Signature (A) Grid Point No. (8) Distance from liquid surface to top of sludge (C) Distance from liquid surface to lagoon bottom. {salt Date: (C) minus (8) Thickness of sludge layer Ft. & in. Ft(tenths) Ft & in. Ft tenths) Ft & in. 3,8 Ft. (tenths) 2 o 3 $, y 3F9 4 5 6 7 8 51 9 _i s 10 I 7 1 i 57 9 ,9 3.8 8. y q,t • ,x %o `�c y 12 3; 2 3r S 3•y fey .94 3,e 13 I - S; 7 14 f S: 6' 15 9,/ .3. s 16 17 18 19 20 22 23 24 Number of points with readin s 1 Y Average of paints y1 IY ,.7.b3 At intake 5; 3 .s X x X *All Grid Points and co�rres vndin9 sludge laver thicknesses must be shown on a sketch attached to this SiudRe Survey Data Sheet See Appendix 4 for conversion from inches to tenths of a foot. L 11" API /54*. fiT