Loading...
HomeMy WebLinkAboutNCC221775_ESC Approval Submitted_20220506ROY COOPER �$� • µw m Governor ELIZABETH S. BISER _ GQ Secretary, BRIAN WRENN NORTH CAROLINA Director Environmental Quality March 9, 2022 LETTER OF APPROVAL WITH MODIFICATIONS SST Properties, LLC ATTN: Arthur Samet, Owner 309 Gallimore Dairy Rd., Suite 102 Greensboro, NC 27409 RE: Project Name: NC I-85 Center - Lot C Acres Approved: 18.3 Project ID: DAVID-2022-036 County: Davidson City: Lexington Address: 2000 Seven Oaks Dr. River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Seamon, Whiteside & Associates, Inc. Date Received by LQS: February 28, 2022 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27tO3 336.776.9800 Letter of Approval with Modifications SST Properties, LLC March 9, 2022 Page 2 of 3 Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Digitally signed by Zachary Lentz Zachary Lentz Date: 2022.03.09 13:25:38-05'00' Zachary Lentz, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Tom Platt, PE of Seamon, Whiteside & Associates, Inc. (via email) WSRO File Letter of Approval with Modifications SST Properties, LLC March 9, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: NC I-85 Center - Lot C Project ID: DAVID-2022-036 County: Davidson Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Additional measures may be required, particularly downstream of the large fill area which drains to silt fence only. The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 413.0115] 2. This ESC plan was approved based on information submitted via email to Zac Lentz, PE on February 28, 2022. For inspection purposes, one copy of revised plan reflecting the emailed information must be delivered to this office by March 16, 2022 or prior to the beginning of construction, whichever date is earlier. Please reference Project ID in your cover memo. [15A NCAC 4B .0107(c)] Additional Comments: 1. This review is for erosion and sedimentation control and associated construction stormwater only and does not provide authorization to work in jurisdictional streams or wetlands. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities