Loading...
HomeMy WebLinkAboutAltair Inspeciton 4.4.2022 Stormwater Inspections Form 102 Rev 2, Jan 2010 Page 1 of 2 COMPLIANCE INSPECTION REPORT City of Raleigh Stormwater Management Division (919) 996-3940 PROJECT Altair 3909 Blue Ridge Rd. PERMIT # LDG- 008836-2021 TRANSACTION SPR- 0210-2020 INSPECTOR Chris Bridgers, CPESC-IT, CESSWI (919) 279-1308 Christopher.Bridgers@raleighnc.gov Stormwater Main Office (919)996-3940 DATE 04/04/22 ARRIVE 1:00 pm DEPART 1:40 pm THE CITY OF RALEIGH, STORMWATER MANAGEMENT DIVISION HAS PERFORMED A STORMWATER COMPLIANCE INSPECTION OF THIS PROJECT AND FOUND THE SITE TO BE NOT IN COMPLIANCE WITH THE LAND DISTURBING PERMIT, ASSOCIATED APPROVED PLANS & SPECIFICATIONS, AND/OR THE CITY OF RALEIGH UNIFIED DEVELOPMENT ORDINANCE. REQUIRED IMMEDIATE CORRECTIVE ACTIONS 1. Remove the silt deposits that are located at the edge of wetlands near the stream bank. The silt has been deposited just beyond the silt fence outlet at the toe of the slope on the northeast side of the culvert crossing. 2. See Inspector’s Comments below. Stormwater Inspections Form 101 Rev 4, Jan 2010 Page 2 of 2 INSPECTOR’S COMMENTS: 1. Spoke w/ the site representative for ACG and showed him the clean-up that needed to be done. Workers had begun removing the silt beyond the silt fence before I left the site. 2. GROUND COVER REMINDER: Any portion of a site upon which further land disturbing activity is not being undertaken shall be provided with ground cover sufficient to restrain erosion within fourteen (14) calendar days of temporarily or permanently suspending the land disturbing activity. THIS PROJECT IS SCHEDULED FOR REINSPECTION IN SEVEN (7) DAYS TO CONFIRM CORRECTION OF ALL IMMEDIATE CORRECTIVE ACTIONS LISTED. Failure to remedy the listed Immediate Corrective Actions / violation(s) prior to reinspection will result in a Notice of Violation and associated penalties may be assessed. These penalties shall include retroactive and cumulative daily civil penalties of $5,000.00 per day until the violation(s) are remedied [Raleigh Unified Development Ordinance, Section 9.4.11(A)]. WEATHER: 68 °F Sunny, dry conditions PROJECT STATUS: Between phases 2 & 3 of the EC Plan OTHER ACTIONS: 1. On-site review of this report X was was not performed. ACG GENERAL INFORMATION: • Standard Detail Drawings are available at http://www.raleighnc.gov/projects/content/PlanDev/Articles/DevServ/DrawingsStandardDetailsIndex.html • City of Raleigh Unified Development Ordinance is available at: http://www.raleighnc.gov/content/extra/Books/PlanDev/UnifiedDevelopmentOrdinance/ Altair Photos – 4-4-2022 New stretch of pipe just installed (and at grade). Actively installing inlet protection while on-site. Off-site sediment from rain event on 3/31/2022 Clean-up in progress prior to leaving site Silt fence at retaining wall Matting applied to slope at aerial sewer line Groundcover applied to slope above retaining wall Stockpile wrapped in silt fence 
 Compliance Inspection Checklist City of Raleigh Stormwater Management Division PROJECT DETAILS Project Name LD Permit #Transaction # Pre-Construction Initial Inspection Rough Grading Building Final Stabilization Routine Inspection Have construction entrances been installed per approved plans YES NO NA Is there evidence of off site tracking of mud/sediment?Site PlansIs the project following the permitted/approved plan set? Are field changes documented on the plan set and/or have been properly communicated with the inspectors? Is the project following the approved construction sequence?TrackingAre diversion ditches and check dams installed and stabilized?PerimeterIs the silt fence installed, maintained, and in good condition? Are there any incidences where silt fence has become full or overtopped with sediment? Are all silt fence outlets installed per city specifications, maintained, and in good condition?DitchesAre all diversion ditches clear of built up or excess sediment? Is there adequate stone coverage at all temporary entrances? Stormwater Inspections Checklist Rev7, Sep 2020 Page 1 of 2 Comments: Compliance Inspection Checklist City of Raleigh Stormwater Management Division Routine Inspection (continued)YES NO NA Sediment BasinsInletsAre all basins installed and match what is shown on approved plans? Are there signs of rill or gully erosion along basin slopes? Have all slopes been properly stabilized and maintained? Does it appear that all structures are functioning properly and as intended (i.e. skimmers, outfalls, risers) Has inlet protection been installed properly and maintained? Are storm sewer inlets that are/will be functional during construction protected? Are there signs that inlet protection should be replaced, repaired, or cleaned?StabilizationOff SiteInspector:Date: Are there soil stockpiles? If so, are they located in an approved area and properly stabilized? Are all slopes adequately stabilized to prevent erosion? Have all disturbed areas been stabilized with temporary or permanent measures within 14 days of the temporary or permanent suspension of activity? Are adjacent wetlands/buffers/properties being impacted by the failure or lack of sediment and erosion control measures? Stormwater Inspections Checklist Rev7, Sep 2020 Page 2 of 2 EEEETTT TTT TTTTTT T T T T T T T T T T T T T E E E E T T T T T T T T T T T T T T T S ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITHCITY OF RALEIGH STANDARDS AND SPECIFICATIONS.Digitally signed by Suni C WilkenshoffReason: I am approving this document.Contact Info: suni.wilkenshoff@raleighnc.govDate: 2021.10.29 14:57:18-04'00' Digitally signed by Suni C WilkenshoffReason: I am approving this document.Contact Info: suni.wilkenshoff@raleighnc.govDate: 2021.09.17 16:36:06-04'00'