Loading...
HomeMy WebLinkAbout15 - Asset Management SCM O&M Plan Asset Management Program SCM O&M Plan City of Raleigh, North Carolina March 2022 – Final Draft City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM ii Quality Information Prepared by Checked by Verified by Approved by AECOM Technical Services Alaina Armel, PE Sujit Ekka, PE Sujit Ekka, PE Revision History Revision Revision date Details Authorized Name Position Distribution List # Hard Copies PDF Required Association / Company Name 0 1 City of Raleigh City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM iii Prepared for: City of Raleigh 127 West Hargett Street Raleigh, NC 27601 Prepared by: AECOM Technical Services 5438 Wade Park Boulevard Suite 200 Raleigh, NC 27607 www.aecom.com City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM iv Table of Contents 1 Introduction ..................................................................................................................1-1 1.1 MS4 Background ..............................................................................................1-1 1.2 Purpose of Document .......................................................................................1-1 2 Organizational Structure ...............................................................................................2-1 2.1 Roles/Responsibilities .......................................................................................2-1 2.2 SLA Model Template & Best Practices ..............................................................2-2 2.3 Ordinances/Legal Authorities ............................................................................2-2 3 Tracking........................................................................................................................3-1 4 Inspections ...................................................................................................................4-1 4.1 Schedule/Frequency .........................................................................................4-1 4.1.1 Routine Inspections ...............................................................................4-1 4.1.2 Annual Inspections ................................................................................4-1 4.2 Inspection Preparation and Safety ....................................................................4-2 4.3 Annual Inspection Checklists ............................................................................4-2 4.4 Documentation of Completed Inspections .........................................................4-5 5 Maintenance .................................................................................................................5-1 5.1 Routine Maintenance ........................................................................................5-1 5.2 Specialized Maintenance ..................................................................................5-1 5.3 Major Repairs & Rehabilitation ..........................................................................5-2 5.4 Maintenance Contractor Qualifications ..............................................................5-2 5.5 Notification of Immediate Corrective Actions .....................................................5-3 5.6 Documentation of Completed Maintenance and Costs ......................................5-3 6 Annual Program Review ...............................................................................................6-1 6.1 Identify Budget and Resource Needs ................................................................6-1 6.2 Adaptive Management ......................................................................................6-2 7 Annual Reporting ..........................................................................................................7-1 Appendices Appendix A – SLA Model Template Appendix B – SCM Inspections SOP Appendix C – Inspection Checklists Appendix C-1 – Routine Inspection Checklist Appendix C-2 – Annual Inspection Checklist City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM v Figures Figure 2-1: Stormwater Management Division (Modified, Abridged Organizational Chart) ........2-1 Figure 4-1: General Information for Annual Inspection Checklists ............................................4-3 Figure 4-2: Area of SCM to be Assessed for Annual Checklists ................................................4-3 Figure 4-3: Inlet Points for Annual Inspection Checklists ..........................................................4-4 Figure 4-4: SCM Status Code Options for Annual Inspection Checklist ....................................4-4 Figure 4-5: Overall SCM Evaluation for Annual Inspection Checklists ......................................4-5 City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM vi List of Definitions Anniversary Date: The date the annual inspection report is due for any SCMs with annual inspection requirements. The Anniversary Date is based on the date an SCM’s as-built certification package was accepted by the City of Raleigh unless staff has otherwise approved a change of Anniversary Date with the property owner. City-owned SCM: SCMs that are installed on property that is owned and/or operated by the City of Raleigh. CR-7107 Stormwater Control Measures: Devices that were required under CR-7107 (1988), the first stormwater regulation in Raleigh. These devices were constructed pursuant to a rezoning request between 1988-2001 and are for detention/run-off control only. These devices do not require as-builts, nor do they have annual inspection or maintenance requirements. Owning Department: The City of Raleigh department that is ultimately responsible for an SCM. Privately-Owned SCM: SCMs that are not owned or operated by the City of Raleigh. Raleigh Rainwater Rewards (R3): Devices created under the City of Raleigh Stormwater Rainwater Rewards Program. That program provides separate comprehensive tracking of all devices under that program and any related inspections. Retrofit SCM: An SCM installed by the City to provide water quality treatment for areas that are currently untreated or inadequately treated by an existing SCM. These devices are either installed on City property or the City acquires an easement. Service Level Agreement (SLA): A document that defines the roles and responsibilities between City departments with SCMs and the Stormwater Management Division to facilitate the long-term inspection and maintenance of City-owned SCMs. State-Required SCM: An SCM that is not required for installation under City of Raleigh regulation, but is otherwise required under North Carolina regulation. Stormwater Control Measure (SCM): As defined in 15A NCAC 02H.1002, also known as Best Management Practice (BMP), a permanent structural device that is designed, constructed, and maintained to remove pollutants from stormwater runoff by promoting settling or filtration, or mimic the natural hydrologic cycle by promoting infiltration, evapotranspiration, post-filtration discharge, reuse of stormwater, or a combination thereof. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM vii UDO 9.2.2.A Stormwater Control Measures: Devices that are required for volume control on residential single-family lots developed under this UDO section (as of 2016). These devices require as-builts and have associated N-file numbers. They are subject to the Annual Inspection & Maintenance requirements of 9.2.2.A.4.c, which do not require a professional, and can be completed by the property owner. The maintenance, function and inspection of these devices are enforceable through the SCM Inspections program. UDO 9.2.2.B and/or .E Stormwater Control Measures: Devices that are required for Nitrogen Reduction and/or Run-off Controls on under these UDO sections. These devices require as-builts and have associated N-file numbers. They are subject to the Annual Inspection & maintenance requirements of 9.2.2.H, which require certification by a professional engineer, surveyor, or landscape architect. The maintenance, function and inspection of these devices are enforceable through the SCM Inspections program. List of Acronyms BMP Best Management Practice FF Fully Functional GIS Geographic Information System LOS Level of Service MS4 Municipal Separate Storm Sewer System NF Not Functional O&M Operations and Maintenance PE Professional Engineer PF Partially Functional PLA Professional Landscape Architect PS Professional Surveyor R&R Repair & Rehabilitation R3 Raleigh Rainwater Rewards SCM Stormwater Control Measure SLA Service-Level Agreements SOP Standard Operating Procedure SWMP Stormwater Management Plan UDO Unified Development Ordinance City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 1-1 1 Introduction The following section will give a brief overview of the City’s stormwater permit requirements and detail the purpose of this document. 1.1 MS4 Background The North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources issued the City of Raleigh its current individual Phase 1 Municipal Separate Storm Sewer System (MS4) Permit (Permit No. NCS000245), which authorizes the City to discharge stormwater from the MS4 to receiving waters of the state within the Neuse River Basin under the conditions of the National Pollutant Discharge Elimination System (NPDES) permit. Section F (Post-Construction Site Runoff Control) of the permit requires managing stormwater runoff from developments and ensuring that controls are in place to minimize the water quality impacts. The conditions of the permit also require pollution prevention and good housekeeping measures to reduce pollution from authorized stormwater discharges (Section G). In order to meet stormwater quality standards of the permit, permittees utilize stormwater control measures (SCMs), which are permanent structural devices that are designed and constructed to remove pollutants from stormwater runoff. For SCMs to work effectively, they must be inspected and maintained regularly. 1.2 Purpose of Document The City of Raleigh Stormwater Management Division maintains and tracks the compliance of more than 2,000 SCMs across the City. In order to execute its SCM program, the City of Raleigh implements two city programs: 1) the SCM Inspections Program, and 2) the Asset Management Program. The Asset Management Program is a team of City employees responsible for ensuring that all City-owned SCMs required under sections 9.2.2 B or E of the UDO are inspected, maintained, and functioning as designed. The purpose of this plan is to document the responsibilities and procedures of the Asset Management Program. For tracking and enforcement of SCMs required under sections 9.2.2 A, B, and E of the UDO, refer to the COR SCM Inspections Program O&M Plan. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan February 2022 AECOM 2-1 2 Organizational Structure The following section details the responsibilities of the Stormwater Management Division, defines service-level agreements (SLAs) with SCM-owning City departments, and provides the ordinances and legal authority that allows the City of Raleigh to implement the SCM maintenance and inspection program. 2.1 Roles/Responsibilities The Stormwater Management Division, which falls under the Engineering Services Department, is responsible for implementing all post-construction stormwater management requirements listed in the City’s MS4 permit by managing compliance of privately-owned and City-owned SCMs within the City of Raleigh’s jurisdiction that are required by the City’s development ordinances. A modified, abridged version of the Stormwater Management Division’s organizational structure is shown in Figure 2-1. City departments that own SCMs are responsible for the inspection and maintenance of their SCMs unless otherwise stated in an SLA with the Stormwater Management Division. Figure 2-1: Stormwater Management Division (Modified, Abridged Organizational Chart) City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan February 2022 AECOM 2-2 2.2 SLA Model Template & Best Practices To facilitate the long-term inspection and maintenance needs of City-owned SCMs, the Stormwater Management Division has established SLAs to define the roles and responsibilities of other City departments with SCMs. The purpose of an SLA is to document the roles and responsibilities of both the owning department and the Stormwater Management Division, as well as to detail which resources and budgets are in place to provide the level of service (LOS) and the support each City department will need to maintain its SCMs. The SLA also documents the processes to which owning departments must adhere, such as device planning and construction, as-built acceptance, contractor agreements, and documentation requirements, for their SCMs. The Stormwater Management Division uses a standard SLA template for all owning departments, but the roles and responsibilities of the owning departments may be modified to account for any department-specific limitations. An SLA model template is included in Appendix A of this plan. 2.3 Ordinances/Legal Authorities The Stormwater Management Division is authorized to implement its SCM O&M Program through the City of Raleigh Unified Development Ordinance (UDO), Chapter 1.1, Article 1.1 Legal Provisions and Chapter 9, Article 9.2.2 Stormwater Management, Sections G and H. The UDO gives the City legal authority to construct or reconstruct, install, inspect, and maintain all post-construction stormwater devices required under sections 9.2.2 A, B, and E on both City and private property. Furthermore, it requires landowners to maintain all on-site stormwater devices unless those devices are accepted for maintenance by the Stormwater Management Division. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan February 2022 AECOM 3-1 3 Tracking To ensure uniform tracking of all pertinent information for SCMs required under sections 9.2.2 A, B, and E of the City’s UDO, the SCM Inspections Program maintains an internal Excel spreadsheet called the “Tracking Spreadsheet” as well as a Geographic Information System (GIS) database in ArcGIS Online called the “Tracking Layer”. The Asset Management Program is not responsible for updating or maintaining the “Tracking Spreadsheet” or “Tracking Layer.” For additional information on SCM tracking, please refer to the COR SCM Inspections Program O&M Plan. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 4-1 4 Inspections The following section discusses the various inspection types and the expected frequency; inspection preparation and safety; inspection checklists available for various types of SCMs; and inspection documentation. 4.1 Schedule/Frequency The City’s Stormwater Management Division manages compliance of SCMs within the jurisdiction of the City of Raleigh that are required under sections 9.2.2 A, B, and E of the UDO. The Asset Management Program is responsible for the inspection and maintenance of City-owned SCMs required under sections 9.2.2 B and E of the UDO, which undergo routine and annual inspections as specified in Sections 4.1.1 and 4.1.2. The City also developed an SCM Inspections standard operating procedure (SOP), which is included as Appendix B of this plan. 4.1.1 Routine Inspections The Asset Management Program aims to conduct routine inspections of City-owned SCMs on a quarterly basis to monitor for any maintenance needs and to ensure proper function. Routine inspections for City-owned SCMs are conducted by the owning departments, unless stated otherwise in the department’s SLA. The routine inspection checklists are provided in Appendix C-1 of this plan. 4.1.2 Annual Inspections Annual inspections are performed every 12 months for SCMs required under the City of Raleigh’s UDO section 9.2.2 (section A, B, and E) and cannot be conducted more than 90 days prior to the site’s anniversary date. Retrofit SCMs are not required by the City’s MS4 permit to undergo annual inspections. Annual inspections for City-owned SCMs are conducted by the owning departments unless stated otherwise in the department’s SLA. Annual inspections are comprehensive and require evaluation of each SCM component to demonstrate that the device is performing properly and is in compliance with the approved stormwater control O&M plan. Annual inspections must be conducted by a North Carolina professional engineer, surveyor, or landscape architect. The City has developed annual inspection checklists for use by professionals when completing annual inspections of City-owned devices. Following inspection, an annual inspection report must be completed and submitted to the SCM Inspections Program for review City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 4-2 and acceptance. Annual inspection reports must be certified by the North Carolina professional engineer, surveyor, or landscape architect who performed the inspection. More information regarding annual inspections and the annual inspection checklists developed by the City can be found in Section 4.3 below. 4.2 Inspection Preparation and Safety Prior to conducting any SCM inspection, inspectors should prepare by reviewing site- specific documentation, including as-built drawings, SCM specifications, maintenance requirements, planting plans, and past inspection/maintenance records, when available. All available site-specific documents are stored digitally on the City’s server. Inspectors should follow the local weather forecast to avoid inspecting devices directly following a significant rain event. For rain events totaling more than 1-inch, inspectors should allow 24 to 48 hours before conducting an inspection to ensure that all device components are clear, visible, and accessible. Prior to performing in-field inspections, safety precautions should be taken as needed, including, but not limited to; avoiding hazardous weather conditions, wearing appropriate personal protective equipment (PPE), and avoiding unsafe conditions. Inspectors should avoid confined spaces unless trained and equipped with proper PPE and required permits. 4.3 Annual Inspection Checklists The Asset Management Program uses device-specific annual inspection checklists when inspecting City-owned SCMs. A g eneral SCM inspection checklist has also been developed to cover new SCM types implemented in the future. The annual inspection checklists are provided in Appendix C-2 of this plan and include the following SCM types: • Bioretention basin • Constructed wetland • Dry pond • Filterra • Level spreader • Sand filter • Swale City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 4-3 • Underground detention • Wet pond • Generic checklist Each checklist includes a General section that is used to document relevant site information, such as the date of inspection, current weather conditions, the inspector’s name, rainfall amounts in the last three days, the anniversary date for the device, and the date of last inspection, as shown in Figure 4-1. Figure 4-1: General Information for Annual Inspection Checklists The other sections of the form are specific to each device type and ask a series of device-specific questions to determine whether each component is functioning properly or in need of maintenance. To provide more information on the extent of maintenance needed, each question has a two-part answer. The inspector will answer Yes, No, or Not Applicable and then select the appropriate action, which could be Monitor, Investigate, or Repair as shown in Figure 4-2. Figure 4-2: Area of SCM to be Assessed for Annual Checklists City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 4-4 For example, if the outlet structure of a wet pond is being inspected, the inspector will be asked to assess whether “Trash, sediment, debris is present at or obstructing the inlet.” If there is substantial sediment blocking the inlet at the time of inspection, the inspector would answer “Yes” and “Repair” as shown in Figure 4-3. Figure 4-3: Inlet Points for Annual Inspection Checklists Each individual component will receive a status code of Fully Functional (FF), Partially Functional (PF), or Not Functional (NF) based on the answers as shown in Figure 4-4. Figure 4-4: SCM Status Code Options for Annual Inspection Checklist At the conclusion of each inspection checklist is an overall SCM evaluation (see Figure 4-5 below), which requires the inspector to summarize all routine and immediate maintenance needs (if applicable), assess the probability and consequence of SCM failure, and provide a LOS score for the entire device. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 4-5 Figure 4-5: Overall SCM Evaluation for Annual Inspection Checklists The annual inspection checklists ensure that each component across all devices is thoroughly inspected and allow the City to track a device’s improvement or decline over time. The inspection checklists are reviewed and updated as needed on an annual basis by the City team as part of the continuous improvement process. 4.4 Documentation of Completed Inspections Completed routine inspections are documented in CityWorks, an Asset Management System used by the City to track routine SCM inspections and maintenance. A work- order generation capability for SCM maintenance workflow is currently under development for CityWorks. Annual inspection reports for SCMs required under sections 9.2.2 B and E of the UDO can be submitted to the SCM Inspections Program for approval 90 days prior to the site’s anniversary date in PDF format. Annual inspection reports must be certified by the North Carolina professional engineer, surveyor, or landscape architect who performed the inspection. Annual inspection reports must be submitted with the Stormwater Device City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 4-6 Annual Inspection Report Summary (Form-501). Once the annual inspection report has been approved and accepted by the SCM Inspections Program, the report will be signed by City staff and returned to the submitter and the acceptance of the annual inspection report will be tracked in the “Tracking Spreadsheet.” All signed annual inspection reports are retained for 6 years on the City’s server. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan February 2022 AECOM 5-1 5 Maintenance The Asset Management Program is responsible for maintaining SCMs located on City property, pursuant to the SLA with the owning department. The Asset Management Program identifies devices in need of maintenance, then prioritizes, budgets, and implements routine maintenance and major repairs in order to ensure all devices are maintained properly and functioning as designed. The following section discusses routine maintenance; specialized maintenance; major repairs and rehabilitation; contractor qualifications; general and SCM-specific routine maintenance guidance documents; the notification process for immediate corrective actions; and documentation of completed maintenance and costs. 5.1 Routine Maintenance Routine maintenance of City-owned SCMs will be accomplished by City maintenance staff or qualified maintenance contractors and tracked in CityWorks. Routine maintenance items are continuously addressed by maintenance staff or by contractors under routine maintenance contracts. Additional routine maintenance items can be identified during routine and annual inspections and would then be incorporated into ongoing routine maintenance activities. The City has developed technical guidance and specifications for routine maintenance of SCMs. The maintenance documents include a general section that addresses maintenance requirements for any type of SCM and additional sections that provide SCM-specific guidance. The maintenance documents specify required frequency of routine maintenance items, a framework for documentation of these items, and limited specifications for materials and methods. 5.2 Specialized Maintenance Specialized maintenance of City-owned SCMs will be accomplished by contractors with expertise in the specific maintenance needed. These maintenance needs may include, but are not limited to, aquatic vegetation maintenance or removal, tree care, pest control, etc. Specialized maintenance needs can be identified during routine and annual inspections. Any specialized SCM maintenance performed will be tracked in CityWorks. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan February 2022 AECOM 5-2 5.3 Major Repairs & Rehabilitation Major repairs or rehabilitation needs for City-owned SCMs are identified during routine and annual inspections as immediate corrective actions. These types of repairs are typically infrequent, costly, and are unable to be addressed by routine maintenance. SCMs in need of major repairs or rehabilitation are prioritized based on LOS scores which are given by the inspector (see Figure 4-5) during annual SCM inspections. The complexity of maintenance work as well as the consequences and probability of SCM failure are considered during prioritization. Depending on the level of effort, expertise required, and City staff availability, the major repairs will either be assigned to City Maintenance staff or to a qualified maintenance contractor. If the maintenance work is to be assigned to a contractor, the Asset Management Program will develop a Repair & Rehabilitation (R&R) Plan that is SCM-specific. An R&R Plan is a construction document that typically consists of general notes; specific restoration and maintenance activities; and annotated original design plans (if available) showing the locations and extent of needed repairs or modifications identified by the Asset Management Program. R&R Plans are not intended to be used to completely redesign or rebuild SCMs. Once an R&R plan has been developed and finalized, maintenance work will be awarded to a contractor through a bidding process; see Section 5.4 for maintenance contractor qualifications. As with other maintenance work, these activities will be documented in CityWorks. 5.4 Maintenance Contractor Qualifications The City is currently developing a process to identify and maintain a group of qualified contractors for SCM maintenance. The process will include development and use of the appropriate procurement process to identify qualified contractors for both non-routine maintenance projects, such as comprehensive rehabilitation projects, as well as routine maintenance of SCMs. The City has also developed mechanisms that would hold contractors responsible for issues that develop during a period following the completion of maintenance work and before the device is accepted by the Stormwater Division. This will be accomplished by providing for a contracting mechanism that incentivizes the contractor to maintain the device until final acceptance. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan February 2022 AECOM 5-3 5.5 Notification of Immediate Corrective Actions The immediate need for corrective actions may be triggered when the inspection reveals that the condition of an SCM may be deemed hazardous to public health, safety, and welfare or if the SCM is no longer functional. Examples of hazardous conditions may include standing water on travel ways open to traffic, failed/crushed piping, missing manhole covers, signs of embankment failure, damaged fencing around steep slopes, flooding hazards, etc. If an SCM is discovered to be a danger to the health, safety, and welfare of the public, the inspector should immediately notify their point of contact at the City by phone of the hazardous conditions so that appropriate action can be taken to address the issue. A hotline number (919-996-3940) or an email to RaleighStormwater@raleighnc.gov can also be used as methods for reporting. A quantitative risk assessment scoring mechanism, which will assess the level of risk to the City if a stormwater device were to fail, is currently in development and will be applied to the annual inspection checklists for City-owned SCMs. 5.6 Documentation of Completed Maintenance and Costs The owning department is responsible for documenting completed maintenance and associated costs within the CityWorks application. The Stormwater Management Division will reimburse the owning departments for any maintenance costs as specified in the SLA. Costs are tracked on a per device basis for time, labor, and materials. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 6-1 6 Annual Program Review The Stormwater Management Division reviews its stormwater program annually in order to identify whether sufficient funding and resources are available to meet the City’s NPDES MS4 permit requirements. The following section discusses the Asset Management Program’s budget and resource needs, and how the City seeks to continually improve its stormwater program. 6.1 Identify Budget and Resource Needs The Stormwater Management Division reviews their budget and resource needs for the Asset Management Program to perform inspections and maintenance for all City-owned SCMs. Program duties typically include: • Prepare and update SLAs with City departments that own SCMs, as appropriate. • Accept SCMs into the program once they are constructed, as-built certification is completed, and warranty period has ended. • Confirm with SCM Inspections Program staff that all SCMs accepted into the program are classified correctly such that all devices are inspected routinely and annually, as required. • Identify maintenance needs and develop R&R Plans accordingly based on routine and annual inspections. During annual review, the SCM Inspections Program documents several reporting metrics associated with the City’s post-construction runoff MS4 requirements, such as the number of sites with SCMs throughout the City and the number of sites with newly approved O&M plans. The Stormwater Management Division can use these metrics to assess program growth and whether more funding and/or resources are needed going forward. As SCMs continue to be constructed throughout the City of Raleigh, the Stormwater Management Division will continue to annually assess the budgetary, staffing, and resource needs for performing the Program’s duties listed above. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 6-2 6.2 Adaptive Management The City aims to continually evaluate and improve the Asset Management Program through process improvements based on findings from the annual program review. The City can make appropriate changes to the different procedures used to accomplish the program goals, such as evaluating the annual inspection checklists for necessary improvements and tracking SCM LOS scores or other performance measures to identify SCMs that may need more frequent maintenance to maintain functionality. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM 7-1 7 Annual Reporting The Stormwater Management Division is required by the City’s NPDES MS4 permit to submit an annual report describing the activities performed in support of each aspect of its Stormwater Management Plan (SWMP). The annual report is divided into ten sections, which include the six minimum control measures, program implementation, water quality monitoring, and total maximum daily loads. Each section includes a brief program narrative, the specific MS4 permit requirements, and associated best management practices (BMPs), as identified in the SWMP. Each program-specific BMP is accompanied by an annual reporting metric specified in the SWMP in order to demonstrate compliance, followed by the activities performed by the City during the permit year. MS4 permit requirements relating to SCMs, annual reporting metrics, and activities performed during the permit year are recorded in Section F of the annual report. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM Appendix A – SLA Model Template City of Raleigh Stormwater Control Measure Service Level Agreement 7/01/2020 Service Level Agreement (SLA) for the Inspection and Maintenance of City of Raleigh Stormwater Control Measures Effective Date: 07-01-2020 Stormwater Control Measure(s) See Attached Exhibit A Approval (By signing below, all Approvers agree to all terms and conditions outlined in this Agreement.) Approvers Title Signed Approval Date Richard Kelly Engineering Services Director or Designee Michael Moore Raleigh Department of Transportation Director or Designee Document Owner: City of Raleigh Engineering Services / Stormwater Management Version Version Date Description Prepared by 1.0 04-24-2020 Service Level Agreement Bradley Stuart City of Raleigh Stormwater Control Measure Service Level Agreement Page 2 of 10 7/01/2020 Table of Contents 1. Agreement Overview ............................................................................................................................................ 3 2. Goals & Objectives ............................................................................................................................................... 3 3. Stakeholder Roles and Responsibilities ................................................................................................................ 3 4. Periodic Review .................................................................................................................................................... 4 5. Device Construction, Inspection and Documentation Requirements for SCM Program Acceptance ................... 4 5.1. Planning and Design Information ................................................................................................................ 4 5.2. Construction and Inspection ......................................................................................................................... 5 5.3. Documentation ............................................................................................................................................. 5 6. Service Agreement ................................................................................................................................................ 6 6.1. Service Scope ............................................................................................................................................... 6 6.2. Raleigh Department of Transportation Responsibilities .............................................................................. 6 6.3. Stormwater Management Responsibilities ................................................................................................... 6 6.4. Service Assumptions .................................................................................................................................... 7 7. Service Management ............................................................................................................................................. 7 7.1. Service Coordination .................................................................................................................................... 7 7.2. Service Documentation and Payments ......................................................................................................... 8 7.3. Communication ............................................................................................................................................ 9 7.4. Service Management Table .......................................................................................................................... 9 8. Design and Construction Management ............................................................................................................... 10 City of Raleigh Stormwater Control Measure Service Level Agreement Page 3 of 10 7/01/2020 1. Agreement Overview This Agreement represents a Service Level Agreement (“SLA” or “Agreement”) between Stormwater Management and Raleigh Department of Transportation (RDOT) for the provisioning of services required to support the inspection and maintenance of City owned Stormwater Control Measures (SCMs). This Agreement remains valid until superseded by a revised agreement mutually endorsed by the stakeholders. This Agreement outlines the parameters of all services covered as they are mutually understood by the primary stakeholders. This Agreement does not supersede current processes and procedures unless explicitly stated herein. 2. Goals & Objectives The purpose of this Agreement is to provide a documented basis by which resources and budgets are in place to provide the required level of service and support to Raleigh Department of Transportation by Stormwater Management. The goal of this Agreement is to obtain mutual agreement for services provided by Stormwater Management to Raleigh Department of Transportation such that City owned Stormwater Control Measures are properly inspected and maintained. The objectives of this Agreement are to:  Provide clear reference to service ownership, accountability, roles and/or responsibilities.  Present a clear, concise and measurable description of services.  Match perceptions of expected service provision with actual service support & delivery. 3. Stakeholder Roles and Responsibilities The Stormwater Management Division will provide for the management of the Stormwater Control Measure devices and act as the service management provider to the owning Department. Raleigh Department of Transportation, as the owner of the device(s), will receive support for the operation, maintenance and inspection of their Stormwater Control Measures. Raleigh Department of Transportation will also provide maintenance services for the devices. Service Management Provider: Stormwater Management Owner / Maintenance Service Provider: Raleigh Department of Transportation City of Raleigh Stormwater Control Measure Service Level Agreement Page 4 of 10 7/01/2020 4. Periodic Review This Agreement is valid from the Effective Date outlined herein and is valid until further notice. This Agreement should be reviewed at a minimum once per fiscal year; however, in lieu of a review during any period specified, the current Agreement will remain in effect. The Stormwater Program Manager (“Document Owner”) is responsible for facilitating regular reviews of this document. Contents of this document may be amended as required, provided mutual agreement is obtained from the primary stakeholders and communicated to all affected parties. The Document Owner will incorporate all subsequent revisions and obtain mutual agreements / approvals as required. Stormwater Program Manager Review Period: Yearly (12 months) Initial Review Date: 07-01-2021 5. Device Construction, Inspection and Documentation Requirements for SCM Program Acceptance In order to plan for and transfer devices into the SCM Program, the Stormwater Management Division will need for the owning Department and other City Divisions supporting the planning, construction and inspection to adhere to the process guidelines and acceptance requirements as defined in this document. Newly constructed devices that do not meet the requirements may not be eligible for transfer into the SCM Program. 5.1. Planning and Design Information To prepare budgets and plans for maintenance and inspection of SCMs, Stormwater Management will need information during the planning and design phase of projects.  To support Program budgeting, the owning Department will notify Stormwater Management of proposed SCMs in the project planning phase.  A representative from Stormwater Management will be consulted during the construction plan review for the proposed SCMs. City of Raleigh Stormwater Control Measure Service Level Agreement Page 5 of 10 7/01/2020 5.2. Construction and Inspection Devices must be properly constructed and inspected. SCMs must be installed as designed and fully functional at the end of the warranty period.  Complete the “As-Built Acceptance’ process as administered by the Stormwater Management Division’s Programs Group.  Ensure that, during the warranty period for the contractor, any general maintenance issues that come up with any of the SCMs onsite will be addressed by the contractor.  Devices will be inspected by representatives from Stormwater and the owning Department prior to the close of the warranty period and before program acceptance.  All SCM device deficiencies will be repaired by the contractor before the close of the warranty period. 5.3. Documentation Prior to transfer of SCMs into the program the owning Department and other City Divisions supporting the planning, construction and inspection of the devices will submit the required documentation.  The final construction plans for the SCMs onsite.  All design calculations for the SCMs onsite.  Design engineer’s Operation and Maintenance documentation.  Produce Stormwater Control Measure as-built plans/survey for any approved Stormwater Control Measure (SCM).  Include construction specifications in all bidding documents that will ensure all of the bullets listed above are contract requirements and the responsible party is clearly defined. City of Raleigh Stormwater Control Measure Service Level Agreement Page 6 of 10 7/01/2020 6. Service Agreement The following detailed service parameters are the responsibility of Stormwater Management in the ongoing support of this Agreement. 6.1. Service Scope The following Services are covered by this Agreement;  Routine Inspections  Annual Inspection and Certification  Routine Maintenance - as described in attached Exhibit A (updated as needed)  Specialized Maintenance - as described in attached Exhibit A (updated as needed)  In-House Repairs 6.2. Raleigh Department of Transportation Responsibilities Raleigh Department of Transportation responsibilities and/or requirements in support of this Agreement include:  Reasonable availability of Raleigh Department of Transportation representative(s) when resolving a service related need or request.  Raleigh Department of Transportation will ensure device acceptance requirements as outlined in sections 5.1, 5.2 and 5.3 are met. 6.3. Stormwater Management Responsibilities Stormwater Management responsibilities and/or requirements in support of this Agreement include:  Provide for the proper inspection, maintenance and function of the Stormwater Control Measure(s) as covered in this Agreement.  Appropriate notification to Raleigh Department of Transportation for all scheduled maintenance. City of Raleigh Stormwater Control Measure Service Level Agreement Page 7 of 10 7/01/2020 6.4. Service Assumptions Assumptions related to in-scope services and/or components include:  Raleigh Department of Transportation will provide routine maintenance services for Stormwater Control Measure devices treating storm drainage from City right- of-way.  Stormwater Management will utilize contract services to provide for specialized SCM maintenance.  Changes to services will be communicated and documented to all stakeholders. 7. Service Management The following sections provide relevant details on service coordination, payments and documentation. 7.1. Service Coordination Inspection, maintenance and repair service(s) covered in this Agreement are tracked in Cityworks and provided as follows:  Routine Inspections: Stormwater Management Staff will provide monthly checks (at the intervals specified in attached Exhibit A). o Additional system checks will be provided as necessary and as specified in the operation and maintenance manual. o Stormwater will report maintenance issues to Raleigh Department of Transportation to schedule repairs. o Reports are provided to Raleigh Department of Transportation as necessary or requested.  Annual Inspection and Certification: Stormwater Management Staff will perform an annual inspection and certification (as required). o Annual inspection report is provided to Raleigh Department of Transportation. o Annual inspection and certification of regulated devices will be performed by a consultant managed by Stormwater. o Stormwater will perform an annual inspection on non-regulated devices. City of Raleigh Stormwater Control Measure Service Level Agreement Page 8 of 10 7/01/2020  Routine Maintenance: Raleigh Department of Transportation will perform routine maintenance of City owned SCMs that treat runoff from roadways and at Raleigh Department of Transportation facilities. o Raleigh Department of Transportation staff will track and report the routine maintenance in Cityworks. o Work performed as specified in attached Exhibit A and as detailed in the individual device O&M guidance when provided by the designer. o Stormwater Management Staff will provide technical support as requested by Raleigh Department of Transportation.  Specialized Maintenance: Stormwater Management Staff will manage contractors to provide the required specialized SCM maintenance (e.g. – Aquatic). o Stormwater staff will track and report the costs for specialized SCM maintenance in Cityworks. o Work performed as specified in attached Exhibit A and as detailed in the individual device O&M guidance when provided by the designer.  In-House Repairs: Stormwater Management Staff will coordinate with Raleigh Department of Transportation and other City departments to provide some required system repairs. These repairs will generally be for minor or restorative issues that are beyond the scope of routine maintenance, but within the capacity of City forces to complete. o City staff will track and report the costs for In-House system repairs in Cityworks. o Work performed as specified by the Stormwater engineer or design consultant. 7.2. Service Documentation and Payments In support of services outlined in this Agreement, Stormwater Management will coordinate payments and documentation of the service costs associated with maintaining the Stormwater Control Measure(s) as outlined below:  Stormwater Management will provide Operational Funding to cover costs associated with routine maintenance, specialized SCM maintenance, inspection services and City performed repairs.  Stormwater Management will maintain a Capital Reserve Fund for contracted design and repair services. City of Raleigh Stormwater Control Measure Service Level Agreement Page 9 of 10 7/01/2020  Raleigh Department of Transportation and Stormwater staff will document the costs associated with maintaining each Stormwater Control Measure in Cityworks.  Stormwater Management will coordinate payments for specialized SCM maintenance services.  Each device has an annual budget assigned for maintenance and repairs. This budget will be reviewed annually by the Raleigh Department of Transportation and Stormwater Management designees.  Stormwater Management will reimburse Raleigh Department of Transportation quarterly for all labor, material and equipment costs associated with work performed on the SCMs. 7.3. Communication  Designated Liaison: Both departments will assign a designated staff person as the primary point of contact and communication for the purposes of this agreement. o For RDOT that person shall be the Transportation Manager: Jason Holmes o For Engineering Services that person shall be the Project Manager: Brad Stuart 7.4. Service Management Table The table below identifies the responsibility for funding and performing or managing the work for the service tasks outlined in this Service Level Agreement. Stormwater Control Measure Program Task Stormwater RDOT Device Management $ W Routine Inspections $ W Routine Maintenance $ W Specialized SCM Maintenance $ W In-House Repairs $ W Annual Inspections $ W Providing Funding = $ Performing or Managing the Work = W City of Raleigh Stormwater Control Measure Service Level Agreement Page 10 of 10 7/01/2020 8. Design and Construction Management The Stormwater Management Division will provide design and construction management services for contracted repairs of Stormwater Control Measure devices when requested by the owning Department and approved by the Engineering Services Department Director or Designee. These repairs will generally be for system failures or life-cycle replacements that are beyond the scope and capacity of City forces to complete. Raleigh Department of Transportation and Stormwater Management will review funding availability and options for repair or replacement at the time of the request. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM Appendix B – SCM Inspections SOP SCM Inspections Standard Operating Procedures City of Raleigh January 2022 - FINAL SCM Inspections SOP Project Number: 60658668 January 2022 AECOM ii Quality Information Prepared by Checked by Verified by Approved by AECOM Technical Services Alaina Armel, PE Sujit Ekka, PE Sujit Ekka, PE Revision History Revision Revision date Details Authorized Name Position Distribution List # Hard Copies PDF Required Association / Company Name 0 1 City of Raleigh SCM Inspections SOP Project Number: 60658668 January 2022 AECOM iii Prepared for: City of Raleigh 127 West Hargett Street Raleigh, NC 27601 Prepared by: AECOM Technical Services 5438 Wade Park Boulevard Suite 200 Raleigh, NC 27607 www.aecom.com NCBELS License No. F-0342 SCM Inspections SOP Project Number: 60658668 January 2022 AECOM iv Table of Contents 1 Introduction...................................................................................................................1-1 1.1 Purpose of Document .......................................................................................1-1 2 SCM Inventory ..............................................................................................................2-1 3 Types of Inspections and Frequency ............................................................................3-1 3.1 Internal SCM Inspections ..................................................................................3-1 3.2 Routine SCM Inspections ..................................................................................3-1 3.3 Annual SCM Inspections ...................................................................................3-1 4 Procedures for Inspection Preparation and Safety ........................................................4-1 4.1 Document Review .............................................................................................4-1 4.2 Scheduling Inspections .....................................................................................4-2 4.3 Field Preparation...............................................................................................4-3 4.4 Safety ...............................................................................................................4-3 5 Inspection Checklists ....................................................................................................5-1 5.1 Internal Inspections ...........................................................................................5-1 5.2 Routine SCM Inspection ...................................................................................5-3 5.3 Annual SCM Inspections ...................................................................................5-4 6 Documentation of Completed Inspections ....................................................................6-1 7 Compliance and Enforcement Processes .....................................................................7-1 Appendices Appendix A Example Field Materials Checklist Appendix B Form 600 for Internal SCM Inspections Appendix C Routine SCM Inspection Checklist Appendix D Annual SCM Inspection Checklists Appendix E Annotated Annual SCM Inspection Checklist Figures Figure 5-1: Internal Inspections Checklist – General Information .............................................5-1 Figure 5-2: Internal Inspections Checklist – Maintenance Needs Assessment .........................5-2 Figure 5-3: Internal Inspections Checklist – Status Code .........................................................5-2 Figure 5-4: Internal Inspection Checklists – Photos of Maintenance Needs .............................5-2 Figure 5-5: Routine Inspections Checklists – Drop Down Menu ...............................................5-3 Figure 5-6: Routine Inspection Checklists – Comments Contingent Upon Previous Answer .....5-3 Figure 5-7: Routine Inspection Checklists – Required Comments ............................................5-3 Figure 5-8: Routine Inspection Checklists – Closing Observations ...........................................5-4 Figure 7-1: SCM Annual Inspection Enforcement Procedure ....................................................7-1 SCM Inspections SOP Project Number: 60658668 January 2022 AECOM v List of Definitions and Acronyms Anniversary Date:The date the annual inspection report is due for any SCMs with annual inspection requirements. The Anniversary Date is based on the date an SCM’s as-built certification package was accepted by the City of Raleigh unless staff has otherwise approved a change of Anniversary Date with the property owner. City-owned SCM:SCMs that are installed on property that is owned and/or operated by the City of Raleigh. Owning Department: The City of Raleigh department that is ultimately responsible for an SCM. Privately-Owned SCM: SCMs that are not owned or operated by the City of Raleigh. Service Level Agreement (SLA):A document that defines the roles and responsibilities between City departments with SCMs and the Stormwater Management Division to facilitate the long-term inspection and maintenance of City-owned SCMs. Stormwater Control Measure (SCM): As defined in 15A NCAC 02H.1002, also known as Best Management Practice (BMP), a permanent structural device that is designed, constructed, and maintained to remove pollutants from stormwater runoff by promoting settling or filtration, or mimic the natural hydrologic cycle by promoting infiltration, evapotranspiration, post-filtration discharge, reuse of stormwater, or a combination thereof. UDO 9.2.2.A Stormwater Control Measures:Devices that are required for volume control on residential single-family lots developed under this UDO section (as of 2016). These devices require as-builts and have associated N-file numbers. They are subject to the Annual Inspection & Maintenance requirements of 9.2.2.A.4.c, which do not require a professional, and can be completed by the property owner. The maintenance, function and inspection of these devices are enforceable through the SCM Inspections program. UDO 9.2.2.B and/or E Stormwater Control Measures:Devices that are required for Nitrogen Reduction and/or Run-off Controls on under these UDO sections. These devices require as- builts and have associated N-file numbers. They are subject to the Annual Inspection & Maintenance requirements of 9.2.2.H, which require certification by a professional engineer, surveyor, or landscape architect. The maintenance, function and inspection of these devices are enforceable through the SCM Inspections program. CCTV Closed Circuit Television FF Fully Functional MFI Minor Functional Issues MS4 Municipal Separate Storm Sewer System NCDEQ North Carolina Department of Environmental Quality NF Not Functional NPDES National Pollutant Discharge Elimination System O&M Operations and Maintenance PF Partially Functional SCM Inspections SOP Project Number: 60658668 January 2022 AECOM vi PPE Personal Protective Equipment SCM Stormwater Control Measure SLA Service-Level Agreements SOP Standard Operating Procedure UDO Unified Development Ordinance SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 1-1 1 Introduction The City of Raleigh is authorized by its Phase I Municipal Separate Storm Sewer System (MS4) Permit (Permit No. NCS000245) to discharge stormwater from its MS4 to receiving waters of the state. To meet the stormwater quality standards of the permit, the City utilizes stormwater control measures (SCMs), which are permanent structural devices designed to manage stormwater runoff. For SCMs to work effectively, they must be inspected and maintained regularly. The City of Raleigh Stormwater Management Division maintains and tracks the compliance of more than 2,000 SCMs across the City. In order to execute its SCM program, the City of Raleigh implements two city programs: 1) the SCM Inspections Program, and 2) the Asset Management Program. The SCM Inspections Program is a team of City employees tasked with tracking the compliance of all SCMs and overseeing enforcement. The Asset Management Program is a team of City employees responsible for ensuring that all City-owned SCMs are inspected, maintained, and functioning as designed. 1.1 Purpose of Document The purpose of this SCM Inspection Standard Operating Procedure (SOP) is to provide standard procedures for SCM inspectors to conduct thorough inspections at each site, in order to ensure SCMs are performing properly in compliance with the site’s approved stormwater control plan and the City’s Unified Development Ordinance (UDO) Section 9.2.2.D. The recommendations and best practices detailed in this document are based on industry standards. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 2-1 2 SCM Inventory To ensure uniform tracking of all pertinent SCM information, the SCM Inspections Program maintains an internal spreadsheet called the “Tracking Spreadsheet”. The spreadsheet is used to track the annual inspection compliance status of each site, the anniversary date, plan name, site address, site contact information, and any tracking notes associated with each site. The spreadsheet is updated periodically to reflect any changes in ownership or contact information, compliance status, etc. To manage SCM data, the SCM Inspections Program creates and manages an N-file (N: Total Nitrogen) folder on the City’s server for each site, which may contain more than one SCM. An N- file folder contains digital copies or scans of a site’s as-built information, site maps, previous inspection documentation, enforcement documentation, and any other historical documents. The N-file folders assist the City with compliance tracking and fulfilling document requests from property owners and inspectors. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 3-1 3 Types of Inspections and Frequency The SCM Inspections Program administers inspections for SCMs required under the UDO Sections 9.2.2.A, B, or E. The following section describes the three types of SCM inspections. 3.1 Internal SCM Inspections At the direction of City Council, all SCMs within the City of Raleigh that were required under UDO Sections 9.2.2.A, B, or E must have an internal inspection be conducted by City Staff once every three years. The inspection report and accompanying photos are stored in the N-file folder, and the date of the most recent internal inspection is stored in the Tracking Spreadsheet mentioned in Section 2. These inspections are not required by the City’s National Pollutant Discharge Elimination System (NPDES) MS4 permit. 3.2 Routine SCM Inspections Routine inspections are not required by the City’s NPDES MS4 permit. However, since City- owned SCMs must be regularly maintained, the Asset Management Program conducts routine inspections of all City-owned SCMs on a quarterly basis. Any routine SCM inspections conducted on private property are completed at the discretion of the property owner. 3.3 Annual SCM Inspections Annual inspections are required for all SCMs that are under the City of Raleigh’s UDO Sections 9.2.2.A, B, or E. An annual inspection must be completed and certified by a North Carolina Professional Engineer, Surveyor, or Landscape Architect. The annual inspection report must certify that all SCMs, including open space areas, are performing properly and are in compliance with the approved stormwater control plan, the applicable maintenance manual, and Raleigh Stormwater Control & Watercourse Buffer Manual. Inspections are due on a yearly basis and must be conducted within 90 days prior to the SCM’s anniversary date. The anniversary date is based on the date the SCM as-built certification was accepted by the City. Pursuant to the owning department’s Service-Level Agreement (SLA), the Asset Management Program is responsible for annual inspections of City-owned SCMs. Therefore, the Asset Management Program contracts with professionals when necessary to perform these inspections and submit the reports to the SCM Inspections Program. Annual inspections are reviewed, enforced, and tracked by the SCM Inspections Program. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 4-1 4 Procedures for Inspection Preparation and Safety Proper preparation prior to SCM inspection is key to ensuring each inspection is thorough and representative of a device’s current condition. Prior to inspection, the inspector should review all relevant site documents, confirm that the inspection is scheduled appropriately, gather all necessary field equipment, and take adequate safety precautions. The following sections discuss the procedures for proper inspection preparation. 4.1 Document Review Reviewing historical documents prior to SCM inspection is an essential part of inspection preparation. The documents an inspector can reference and the information the inspector should take note of within each document are listed below. Digital copies or scans of historical documents are stored in each site’s N-file folder on the City’s server. As-Built Drawings & Photos: As-built drawings are construction drawings that show the post-construction dimensions, elevations, and locations of all design components associated with each SCM on site. Certified and sealed as-built drawings for each site must be submitted to the City upon completion of SCM construction. Inspectors should review the as-built drawings prior to inspection and take copies into the field if able. Prior to inspection, inspectors should review the as-built drawings and photos for the locations of all design components within the device, inlet and outlet pipe sizes and materials, riser details, vegetation, and any other pertinent information related to the device’s design. Once in the field, the inspector can then verify the as-built drawings against the device and note any deviations. Examples of deviations may include differing inlet pipe sizes or materials, the number of inlets in the field does not match the as-builts, riprap armoring on the emergency spillway was present in the field but not shown in the as-builts, etc. In case of SCMs where as-built documents are not available, available design drawings should be reviewed and any deviations noted in the inspection reports. Planting Plans: Planting plans are construction drawings that show the different varieties of plants that should be present within a device after construction is completed, as well as the number of each plant variety. Planting plans are often included with the as-built drawings and are typically only associated with devices that use planted vegetation for treatment such as stormwater wetlands, bioretention cells, and Filterra units. If a device has a planting plan, inspectors should review the planting plan prior to inspection and take a copy into the field if able. Prior to inspection, the inspector should become familiar with the plant varieties shown on the planting plan and gather information on what the plants look like so the inspector can identify them in the field. Once in the field, the inspector can then verify the planting plans against what is present in the device and note any deviations. Deviations may include different plant varieties present in the field than what is shown in the planting plan, and the specified number of each plant variety in the field does not match the planting plan. Stormwater Operation & Maintenance (O&M) Manual:All SCMs required under the UDO Sections 9.2.2.A, B, or E must have an approved O&M manual. O&M manuals are device-specific documents written by the design engineer that establish procedures and maintenance requirements for each design component. Inspectors should briefly SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 4-2 review the O&M manual prior to inspection to gather information such as the required drawdown time, vegetation that should be removed if present, appropriate grass height, where to inspect for signs of erosion, different kinds of erosion and the associated indicators to look for, specific areas of outlet structures that warrant close inspection, depth of sediment inside the device that requires removal, permanent pool elevation, etc. Previous Inspection Reports: Previous years’ inspection reports are particularly important to review prior to inspection. Inspectors should review the reports for information regarding previous routine maintenance needs and any major repairs identified. During inspection, the inspector should verify that all maintenance needs or repairs mentioned in the previous inspection report have been addressed. 4.2 Scheduling Inspections The inspector should take into account the type of inspection being performed, the SCM’s anniversary date, if any of the devices on-site are dependent on the growing season, recent rainfall amounts, and the proximity to other sites. More detail on what specifically the inspector should consider when scheduling an inspection is provided below. Inspection Type:There are three types of inspections performed by the City with different frequency requirements. The inspector should be aware of the inspection type they are performing and schedule accordingly. Refer to Section 3 for more information on each inspection type and their frequency. Anniversary Date:An SCM’s anniversary date is defined as the date the as-built package for an SCM requiring an annual inspection was accepted by the City. If the inspector is performing an annual inspection, the inspector must perform the inspection and submit the annual inspection report within 90 days prior to the anniversary date for the site to remain in compliance. Growing Season:Inspecting certain devices during the growing season is especially important for annual inspections. The main purpose of annual inspections is to confirm that the device is functioning as designed and is maintained properly. For device types that include planted vegetation as a design element, it is critical to inspect these devices during the growing season to ensure that the health of the planted vegetation can be accurately assessed. Devices that commonly include planted vegetation are stormwater wetlands, bioretention cells, and Filterra units. Significant Storm Events:A significant storm event is defined as a storm totaling greater than 1 inch within 24 hours. Unknowingly inspecting devices directly after a significant storm event could lead to conclusions that are not representative of the overall condition of a device. For example, unknowingly inspecting a dry pond the day after a significant storm event could cause the inspector to falsely conclude that the device is holding water, triggering maintenance items. Inspectors should consult a device’s O&M manual or the device-specific North Carolina Department of Environmental Quality (NCDEQ) O&M manual to determine the required drawdown time. Inspectors should also review recent rainfall data to determine if a significant storm event or any other smaller events have occurred within 72 hours of the inspection and take that data into consideration when performing an inspection. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 4-3 Location:If an inspector is performing inspections at multiple sites on a given day, the inspector should use each site’s location and determine their proximity to each other to determine the most efficient route. 4.3 Field Preparation Proper field preparation is an important aspect of conducting thorough inspections, and the necessary equipment and preparation may vary between sites. Some SCMs may be located at secure facilities or on private property and will require inspectors to notify and coordinate access with the City departments, the facility, and/or the owner prior to inspection. Depending on the device type, such as devices with underground components, inspectors may also need to coordinate with the City or subconsultants to facilitate the use of closed-circuit television (CCTV) devices prior to the inspection of underground components. Some sites will require facility and/or device specific preparation, and inspectors should develop a checklist of field items needed to complete inspections. This checklist should include items such as proper identification, inspection forms, electronic devices used for inspections, personal protective equipment (PPE), a first aid kit, sunscreen, insect repellant, snake chaps, measuring tape, leather gloves, manhole hooks, etc. An example field materials checklist can be found in Appendix A. 4.4 Safety Prior to performing field inspections, safety precautions should be taken as needed, including, but not limited to, conducting a vehicle check before traveling to the site, avoiding hazardous weather conditions, wearing the appropriate PPE, and taking frequent breaks for water. Inspectors should avoid confined spaces unless trained and equipped with the proper PPE and required certifications. Inspectors should be aware of their surroundings at all times while performing inspections. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 5-1 5 Inspection Checklists The City performs three types of SCM inspections: internal, routine, and annual. Each type of inspection uses a distinct inspection checklist. The following sections provide an overview of the checklists for each type of inspection with guidance on how to complete them. The figures shown in Sections 5.1 and 5.2 use the Dry Detention inspection checklist as an example. 5.1 Internal Inspections At the direction of City Council, all SCMs within the City of Raleigh that require an annual inspection must be inspected once every three years by City staff. Internal inspections are performed by the SCM Inspections Program using PDF-fillable, device-specific inspection checklists called Form 600s. A blank Form 600 is attached in Appendix B. Each inspection checklist, regardless of device type, requires the inspector to fill out general information about the site. This information, shown in Figure 1 below, is important to ensure each device being inspected is accurately identified. Figure 5-1: Internal Inspections Checklist – General Information The inspection checklist is intended to be brief but provides each design component and the overall device with a status of Fully Functional (FF), Minor Functional Issues (MFI), Partially Functional (PF), or Not Functional (NF). Once finished with the inspection, the inspector should assign the device an Overall Status of FF, MFI, PF, or NF based on the assessment of each design component. The status codes are defined as follows: Fully Functional (FF) – All parts are in good working order Minor Functional Issues (MFI) – Device is functional, but has some minor areas to monitor Partially Functional (PF) – Part of the device needs repairs Not Functional (NF) – Repairs are required Each design component has a series of checkboxes that list potential maintenance needs associated with that design component. Common maintenance needs may vary slightly across design components. During inspection, the inspector should only check the boxes that apply. Figure 5-2 below is an example of how this may be filled out in the field. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 5-2 Figure 5-2: Internal Inspections Checklist – Maintenance Needs Assessment Once the inspector has checked all boxes that apply, each design component will be assigned a status code based on what was observed in the field. For further clarification, any field observations or maintenance needs should be written out in the Comments section for each design component. The comment shown in Figure 5-3 below illustrates how to fill out this section. Figure 5-3: Internal Inspections Checklist – Status Code At the end of each inspection checklist is an area for the inspector to attach photos, shown below in Figure 5-4. The inspector should attach photos of any important maintenance needs identified during the inspection and include a caption explaining what is being shown in each photo. Figure 5-4: Internal Inspection Checklists – Photos of Maintenance Needs SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 5-3 5.2 Routine SCM Inspections Routine SCM inspections of City-owned SCMs are performed quarterly by the Asset Management Program using electronic inspection checklists developed in CityWorks. Privately- owned SCMs are inspected at the discretion of the property owner and do not use the routine inspection checklists shown in Appendix C. Appendix C includes an overview of the routine SCM inspection fields as they appear in CityWorks. Routine inspections checklists are brief in nature and are specific to each device type. The inspector is required to select Yes or No from a drop-down menu in response to each question, shown in Figure 5-5 below. Figure 5-5: Routine Inspections Checklists – Drop Down Menu Maintenance needs are identified throughout the routine inspection checklists based on the question and the inspector’s answer. Contingent on an inspector’s answer, the inspector may be required to provide comments, as shown in Figure 5-6; however, certain questions require a comment regardless of the inspector’s answer, as shown in Figure 5-7 below. Comments should clearly explain the current condition of the design component in question, the routine or immediate maintenance needs identified, and any other information needed to understand the device’s current condition. Figure 5-6: Routine Inspection Checklists – Comments Contingent Upon Previous Answer Figure 5-7: Routine Inspection Checklists – Required Comments SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 5-4 Lastly, at the end of each inspection checklist is an area for the inspector to provide any closing observations about the overall device, list all needed repairs across all design components, and provide recommendations for maintaining the device. The inspected SCM is then assigned a condition score. The conclusion of the routine inspection form is shown below in Figure 5-8. Figure 5-8: Routine Inspection Checklists – Closing Observations 5.3 Annual SCM Inspections Annual inspections are performed on a yearly basis and must be conducted within 90 days prior to the SCM’s anniversary date. Annual inspections of City-owned SCMs are conducted by the Asset Management Program or their contracted professionals. Annual inspections of privately- owned SCMs are conducted by a North Carolina Professional Engineer, Surveyor, or Landscape Architect as discussed previously in Section 3.3. Annual inspections require thorough evaluation of each design component to demonstrate that the device is functioning as designed. The Asset Management Program has developed nine device-specific annual inspection checklists for inspection of City-owned SCMs. Checklists were developed for the following SCM types:  Bioretention basin  Dry pond  Filterra  Level spreader  Sand filter  Stormwater wetland  Swale  Underground detention  Wet pond A generic annual inspection checklist was also developed to be used for any device that does not have a specific checklist. Appendix D includes the nine (9) SCM-specific annual inspection SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 5-5 checklists as well as the generic SCM inspection checklist. Appendix E includes an example annual inspection checklist, which has been annotated with instructions and guidance on how to complete.Not all sections of the annotated inspection checklist have been completed, but rather only the sections where guidance on completing the checklist would be beneficial to the inspector. Each inspection checklist contains a General section that documents relevant site information such as the device type, N-file, date of inspection, the site’s anniversary date, recent rainfall, etc. The following sections of each form are specific to the design components associated with each device type. For example, the dry pond inspection checklist will include sections for Inlet Points, Forebay, Basin, Outlet Structure, Emergency Spillway, Embankment, and Miscellaneous, whereas the swale inspection checklist will include sections for Inlet Points, Swale, Outlet Structure, and Miscellaneous. Each design component section asks a series of questions to determine if the component is functioning properly or needs maintenance. Each question requires a two-part answer. The inspector will be required to provide an Observation of Yes,No, or Not Applicable and an Action of Monitor, Investigate,or Repair.Once the inspector has completed all questions, the inspector will be required to give each design component a Status Code of Fully Functional (FF),Partially Functional (PF), or Not Functional (NF) and provide notes detailing what was observed in the field to warrant the Status Code assigned. At the conclusion of each annual inspection checklist are the Approximate Quantity of Maintenance Items Required section and the SCM Evaluation section. If applicable, the inspector shall document the length, material, and diameter of pipe replacement, as well as the square footage of area to be re-seeded and the number of trees to be removed in the Approximate Quantity of Maintenance Items Required section. The SCM Evaluation section requires the inspector to provide a summary of all routine maintenance needs and immediate corrective actions, the probability and consequence of failure, and providing a Level of Service score for the overall device. The Level of Service score for each device is used by the City to track the performance of SCMs over time. The details on Level of Service scores are provided in the checklists in Appendix D. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 6-1 6 Documentation of Completed Inspections Documentation of completed annual SCM inspections are required by the City’s MS4 NPDES permit to be in compliance. Internal and routine SCM inspections are documented for the City’s record but are not required by the City’s permit. Completed Internal SCM Inspections:Internal inspections are tracked in the City’s Tracking Spreadsheet managed by the SCM Inspections Program. The date of inspection and any observations or maintenance needs identified during the inspection are also documented in the City’s Tracking Spreadsheet. Completed Routine SCM Inspections:Routine inspections of City-owned SCMs are completed and tracked in CityWorks by the Asset Management Program. Completed Annual SCM Inspections:Annual inspection reports for SCMs are submitted to the SCM Inspections Program up to 90 days prior to the SCM’s anniversary date in PDF format and are tracked using the City’s Tracking Spreadsheet. All annual inspection reports of SCMs required under the UDO Sections 9.2.2.A, B, or E are retained for 6 years and are located on the City’s server. Annual inspection reports of SCMs are required by the City to be submitted with a Stormwater Device Annual Inspection Summary form (Form 501). Form 501 serves as a cover page for the annual inspection report and provides a general overview of the SCM location, property owner information, and the North Carolina Professional Engineer’s, Surveyor’s, or Landscape Architect’s seal. As specified in Form 501, reports should include all items listed in the Stormwater Device Annual Inspection Report Checklist. SCM Inspections SOP Project Number: 60658668 January 2022 AECOM 7-1 7 Compliance and Enforcement Processes Compliance and enforcement procedures only apply to annual inspections. The submittal of an annual inspection report within 90 days prior to a device’s anniversary date is required for all SCMs to remain in compliance with UDO Sections 9.2.2.A, B, or E. If an annual inspection report is not submitted to the SCM Inspections Program by the device’s anniversary date, the owner is notified. The following flowchart Figure 7-1 depicts the process of identification and documentation of SCMs required under the UDO Sections 9.2.2.A, B, or E that are non- compliant, the notification process, and enforcement procedures. Figure 7-1: SCM Annual Inspection Enforcement Procedure City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM Appendix C – Inspection Checklists City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM Appendix C - 1 – Routine Inspection Checklist SCM Inspections Custom questions on following slides All inspections also have these built-in fields: Cisterns Dam Well Monitoring Filter Strip Green Roof Non-regulated Bio Retention Non-regulated Pond (Regulated has same) Non-regulated Wetland (Regulated has same) Permeable Pavers Regulated Dry Detention Pond Regulated Bio Retention Sand Filter Swale City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM Appendix C - 2 – Annual Inspection Checklist CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 1 of 19 GENERAL INFORMATION SCM TYPE: Bioretention Cell SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 2 of 19 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 3 of 19 Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 4 of 19 FOREBAY ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Riprap or stabilization clogged or covered in sediment Circle one: Yes No Not applicable Notes: Excess sediment displaced 50% or more of the design storage capacity Circle one: Yes No Not applicable Notes: Erosion or bare areas present Circle one: Yes No Not applicable Notes: Does the transition berm (if applicable) show signs of erosion Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Signs of flow bypassing the forebay Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 5 of 19 Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 6 of 19 BIORETENTION CELL ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Evidence of water ponding no longer than 48 hours Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Plant density/required vegetation adequate Circle one: Yes No Not applicable Notes: Plantings/required vegetation in need of maintenance/pruning Circle one: Yes No Not applicable Notes: Plants/grass cover is dead or unhealthy Circle one: Yes No Not applicable Notes: Tree stakes/wires present six months after planting Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 7 of 19 Notes: Bare or eroded areas present in the cell and/or surrounding areas Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Mulch has been displaced and/or has decomposed Circle one: Yes No Not applicable Notes: Sediment clogging the media or accumulated 3 inches or more in depth Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 8 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 9 of 19 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s)/riser structure Circle one: Yes No Not applicable Notes: There is joint failure/loss of joint material/evidence of leaking or piping present at the outlet pipe(s)/riser structure Circle one: Yes No Not applicable Notes: Outlet pipe/riser structure obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Trash, sediment, or debris clogging the trash rack Circle one: Yes No Not applicable Notes: Trash rack is damaged Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 10 of 19 Water is able to flow freely through the SCM to the outlet structure Circle one: Yes No Not applicable Notes: Evidence of erosion and/or undercutting around the outlet pipe(s) Circle one: Yes No Not applicable Notes: Overgrown, undesirable, or woody vegetation present Circle one: Yes No Not applicable Notes: There are cleanouts present that indicate an underdrain system Circle one: Yes No Not applicable Notes: There is evidence that clogging has occurred in the underdrain system Circle one: Yes No Not applicable Notes: Cleanout caps are missing or damaged Circle one: Yes No Not applicable Notes: Cleanout caps are secure/tight/not loose, and not allowing water to enter through the top opening Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 11 of 19 Evidence of trash/debris downstream of outlet pipe or at the dissipator pad Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of outlet pipe or around the dissipator pad Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 12 of 19 EMERGENCY SPILLWAY Erosion or signs of instability Circle one: Yes No Not applicable Notes: Armoring satisfactory Circle one: Yes No Not applicable Notes: If vegetated, the grass height (between 6 and 12 inches) and cover is adequate Circle one: Yes No Not applicable Notes: Trash or debris present Circle one: Yes No Not applicable Notes: Undesirable or woody vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 13 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 14 of 19 EMBANKMENT ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Grass cover unhealthy or erosion on earthen embankment Circle one: Yes No Not applicable Notes: Grass appropriate height Circle one: Yes No Not applicable Notes: Signs of seepage on the downstream face Circle one: Yes No Not applicable Notes: Evidence of animal burrowing or activity Circle one: Yes No Not applicable Notes: Signs of piping, settling, scouring, cracking, or sloughing Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 15 of 19 Woody or undesirable vegetation growing on embankment Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 16 of 19 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 17 of 19 Embankment section consists of retaining wall Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 18 of 19 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Bioretention v 3. 09/10/19 Page 19 of 19 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 1 of 18 GENERAL INFORMATION SCM TYPE: Dry Pond SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 2 of 18 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 3 of 18 Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 4 of 18 FOREBAY ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Riprap or stabilization clogged or covered in sediment Circle one: Yes No Not applicable Notes: Excess sediment displaced 50% or more of the design storage capacity Circle one: Yes No Not applicable Notes: Erosion or bare areas present Circle one: Yes No Not applicable Notes: Does the transition berm show signs of erosion Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 5 of 18 Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 6 of 18 BASIN ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Evidence of standing water present in the basin beyond the allotted drawdown time (longer than 5 days after a storm event) Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Sediment accumulated to a depth greater than the original design sediment storage depth Circle one: Yes No Not applicable Notes: Plants/grass cover is dead or unhealthy Circle one: Yes No Not applicable Notes: Grass is maintained/mowed to the appropriate height Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 7 of 18 Erosion or bare areas present in the basin or surrounding area Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 8 of 18 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s) or riser structure Circle one: Yes No Not applicable Notes: Pipe(s) or riser structure leaking Circle one: Yes No Not applicable Notes: Orifices, weirs, or riser structure clogged with trash, sediment, or debris Circle one: Yes No Not applicable Notes: Outlet pipe obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Trash, sediment, or debris clogging/obstructing trash rack Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 9 of 18 Trash rack damaged Circle one: Yes No Not applicable Notes: Water able to flow freely through the SCM to the outlet control structure Circle one: Yes No Not applicable Notes: Overgrown, undesirable, or woody vegetation present Circle one: Yes No Not applicable Notes: Erosion or other signs of damage at the outlet Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of outlet pipe or at the dissipator pad Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of outlet pipe or around the dissipator pad Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 10 of 18 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 11 of 18 EMERGENCY SPILLWAY Erosion or signs of instability Circle one: Yes No Not applicable Notes: Armoring satisfactory Circle one: Yes No Not applicable Notes: If vegetated, the grass height (between 6 and 12 inches) and cover is adequate Circle one: Yes No Not applicable Notes: Trash or debris present Circle one: Yes No Not applicable Notes: Undesirable or woody vegetation Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 12 of 18 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 13 of 18 EMBANKMENT ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Grass cover unhealthy or erosion on earthen embankment Circle one: Yes No Not applicable Notes: Grass appropriate height Circle one: Yes No Not applicable Notes: Signs of seepage on the downstream face Circle one: Yes No Not applicable Notes: Evidence of animal burrowing or activity Circle one: Yes No Not applicable Notes: Signs of piping, settling, scouring, cracking, or sloughing Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 14 of 18 Woody or undesirable vegetation growing on embankment Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 15 of 18 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 16 of 18 Embankment section consists of retaining wall Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 17 of 18 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Dry Pond v 3. 09/09/19 Page 18 of 18 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 1 of 8 GENERAL GENERAL INFORMATION SCM TYPE: Filterra® (Tree box systems) SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: UNDER MANUFACTURER WARRANTY: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS SURROUNDING FILTERRA: SITE CONDITIONS: INSPECTORS NOTES CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 2 of 8 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet and/or bypass Circle one: Yes No Not applicable Notes: Structural damage to the grate or bypass structure Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe Circle one: Yes No Not applicable Notes: Standing water present Circle one: Yes No Not applicable Notes: Adjacent drainage area stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 3 of 8 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 4 of 8 TREE BOX ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Structural damage to the box Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Trash/debris and/or sediment accumulation present Circle one: Yes No Not applicable Notes: Tree growth unhealthy Circle one: Yes No Not applicable Notes: Tree needs pruning Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 5 of 8 Standing water in the tree box Circle one: Yes No Not applicable Notes: Mulch is inadequate (minimum 3”) Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 6 of 8 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 7 of 8 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Replacement Tree (ea) Replacement Mulch (inches) Replacement Filter Media (inches from top of media to top of slab) CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Filterra v 3. 09/10/19 Page 8 of 8 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 1 of 16 GENERAL INFORMATION SCM TYPE: Level Spreader SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 2 of 16 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 3 of 16 Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 4 of 16 BYPASS CHANNEL ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Bare areas and/or erosive gullies present Circle one: Yes No Not applicable Notes: Damage to the turf reinforcement mat Circle one: Yes No Not applicable Notes: Riprap has been displaced Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 5 of 16 Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 6 of 16 LEVEL SPREADER ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Cracks/leaks in concrete trough Circle one: Yes No Not applicable Notes: Sediment accumulation in the trough inhibiting proper flow Circle one: Yes No Not applicable Notes: Evidence of stormwater bypassing level spreader Circle one: Yes No Not applicable Notes: Erosion/washout in earthen trough Circle one: Yes No Not applicable Notes: Vegetative cover in the earthen trough is adequate and is maintained/mowed Circle one: Yes No Not applicable Notes: Damage to the concrete lip Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 7 of 16 Notes: Evidence of damage to the gravel diaphragm Circle one: Yes No Not applicable Notes: Sediment accumulation present in diaphragm Circle one: Yes No Not applicable Notes: Evidence of erosion and/or gullies present on berm Circle one: Yes No Not applicable Notes: Sediment accumulation at the base of the berm Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 8 of 16 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 9 of 16 VEGETATIVE FILTER STRIP Erosive gullies or bare areas present Circle one: Yes No Not applicable Notes: Trash or debris present Circle one: Yes No Not applicable Notes: Sediment accumulation present Circle one: Yes No Not applicable Notes: Undesirable or woody vegetation present Circle one: Yes No Not applicable Notes: Grass cover is appropriate length for species and maintained/mowed Circle one: Yes No Not applicable Notes: Grass cover is diseased, dead, or unhealthy Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 10 of 16 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 11 of 16 BUFFER ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Plant cover is unhealthy or dead Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Erosion or bare areas present Circle one: Yes No Not applicable Notes: Evidence of disturbance Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 12 of 16 Status Code (Circle One) Other Notes: Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 13 of 16 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of device Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of device Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 14 of 16 Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 15 of 16 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: LS-VFS v 3. 09/10/19 Page 16 of 16 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 1 of 13 GENERAL INFORMATION SCM TYPE: Sand Filter SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 2 of 13 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 3 of 13 Sediment present on surface of adjacent pavement Circle one: Yes No Not applicable Notes: Flow diversion structure (clogged/obstructed by sediment, trash, or debris Circle one: Yes No Not applicable Notes: Flow diversion structure is damaged Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 4 of 13 SEDIMENT CHAMBER ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Excess sediment displaced 50% or more of the design storage capacity Circle one: Yes No Not applicable Notes: Structural damage to the vault and/or pipe Circle one: Yes No Not applicable Notes: Evidence of oil accumulation Circle one: Yes No Not applicable Notes: Baffles and/or weir is damaged Circle one: Yes No Not applicable Notes: Evidence of leaking Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 5 of 13 Notes: Trash/debris accumulation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 6 of 13 SAND CHAMBER ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Evidence of water ponding for longer than 24 hours after storm event Circle one: Yes No Not applicable Notes: Structural damage to the vault and/or pipe Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Side slopes and surrounding areas are well vegetated Circle one: Yes No Not applicable Notes: Evidence of sediment clogging/discoloration of the filter media Circle one: Yes No Not applicable Notes: Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 7 of 13 Erosion/gullies or bare areas present in the basin or surrounding area Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 8 of 13 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s) or riser structure Circle one: Yes No Not applicable Notes: Pipe(s) or riser structure leaking Circle one: Yes No Not applicable Notes: Orifices, weirs, or riser structure clogged with trash, sediment, or debris Circle one: Yes No Not applicable Notes: Outlet pipe obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Water is able to flow freely through the SCM to the outlet structure Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 9 of 13 Cleanouts present that would indicate an underdrain system Circle one: Yes No Not applicable Notes: Evidence indicating underdrain system is clogged Circle one: Yes No Not applicable Notes: Cleanout caps missing or damaged Circle one: Yes No Not applicable Notes: Cleanout caps are secure/tight/not loose, and not allowing water to enter through the top opening Circle one: Yes No Not applicable Notes: Trash, sediment, or debris clogging/obstructing trash rack Circle one: Yes No Not applicable Notes: Trash rack is damaged Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 10 of 13 Erosion or other signs of damage at the outlet Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of outlet pipe or at the dissipator pad Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of outlet pipe or around the dissipator pad Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 11 of 13 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 12 of 13 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Sand Filter v 3. 09/10/19 Page 13 of 13 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 1 of 19 GENERAL INFORMATION SCM TYPE: Constructed Wetland SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 2 of 19 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 3 of 19 Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 4 of 19 FOREBAY ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Riprap or stabilization clogged or covered in sediment Circle one: Yes No Not applicable Notes: Excess sediment displaced 50% or more of the design storage capacity Circle one: Yes No Not applicable Notes: Erosion or bare areas present Circle one: Yes No Not applicable Notes: Does the transition berm (if applicable) show signs of erosion Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 5 of 19 Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 6 of 19 MAIN TREATMENT AREA ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Algae covering over 50% of deep pool and shallow water surface Circle one: Yes No Not applicable Notes: Undesirable vegetation (e.g., cattails, phragmites) present in the deep pool and shallow water areas Circle one: Yes No Not applicable Notes: Sediment accumulation has reduced the original design depth by 50% or more Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Erosion or bare areas present in the basin or surrounding areas Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 7 of 19 Evidence of geese or other waterfowl residence in the pond or other water quality issues Circle one: Yes No Not applicable Notes: Plant density/required vegetation adequate Circle one: Yes No Not applicable Notes: Plantings growing in the main treatment area are dead, unhealthy, or undesirable Circle one: Yes No Not applicable Notes: Water level returns to the permanent pool elevation per the design drawdown time Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 8 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 9 of 19 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s) or riser structure Circle one: Yes No Not applicable Notes: Pipe(s) or riser structure leaking Circle one: Yes No Not applicable Notes: Orifices, weirs, or riser structure clogged with trash, sediment, or debris Circle one: Yes No Not applicable Notes: Outlet pipe obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Sluice gate operating through the intended range of motion Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 10 of 19 Trash, sediment, or debris clogging/obstructing trash rack Circle one: Yes No Not applicable Notes: Trash rack damaged Circle one: Yes No Not applicable Notes: Water able to flow freely through the SCM to the outlet control structure Circle one: Yes No Not applicable Notes: Overgrown, undesirable, or woody vegetation present Circle one: Yes No Not applicable Notes: Erosion or other signs of damage at the outlet Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of outlet pipe or at the dissipator pad Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of outlet pipe or around the dissipator pad Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 11 of 19 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 12 of 19 EMERGENCY SPILLWAY Erosion or signs of instability Circle one: Yes No Not applicable Notes: Armoring satisfactory Circle one: Yes No Not applicable Notes: If vegetated, the grass height (between 6 and 12 inches) and cover is adequate Circle one: Yes No Not applicable Notes: Trash or debris present Circle one: Yes No Not applicable Notes: Undesirable or woody vegetation Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 13 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 14 of 19 EMBANKMENT ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Grass cover unhealthy or erosion on earthen embankment Circle one: Yes No Not applicable Notes: Grass appropriate height Circle one: Yes No Not applicable Notes: Signs of seepage on the downstream face Circle one: Yes No Not applicable Notes: Evidence of animal burrowing or activity Circle one: Yes No Not applicable Notes: Signs of piping, settling, scouring, cracking, or sloughing Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 15 of 19 Woody or undesirable vegetation growing on embankment Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 16 of 19 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 17 of 19 Embankment section consists of retaining wall Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 18 of 19 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wetland v 3. 09/10/19 Page 19 of 19 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 1 of 11 GENERAL INFORMATION SCM TYPE: Swale SCM FACILITY ID: SCM N-FILE SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 2 of 11 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 3 of 11 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 4 of 11 SWALE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Undesirable vegetation or woody vegetation present Circle one: Yes No Not applicable Notes: Overhanging/overgrown vegetation causing shaded or bare areas Circle one: Yes No Not applicable Notes: Excess sediment accumulation at the bottom of the swale (>4 inches) Circle one: Yes No Not applicable Notes: Evidence of standing water present Circle one: Yes No Not applicable Notes: Check dam stone needs replacing or replenishing (if present) Circle one: Yes No Not applicable Notes: Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 5 of 11 Check dam weep holes are clogged or obstructed (if present) Notes: Evidence of erosion around the sides of the check dams (if present) Circle one: Yes No Not applicable Notes: Erosion, gullies, or bare areas present in the swale or surrounding areas Circle one: Yes No Not applicable Notes: Grass cover is diseased, dead, or unhealthy Circle one: Yes No Not applicable Notes: Grass is maintained/mowed to the appropriate height (4 – 6 inches) Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 6 of 11 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 7 of 11 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s), drop inlets, or other structures Circle one: Yes No Not applicable Notes: Outlet structure obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Erosion or other signs of damage Circle one: Yes No Not applicable Notes: Water able to flow freely to the outlet control structure Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 8 of 11 Evidence of trash/debris downstream of outlet pipe or at the dissipator pad Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of outlet pipe or around the dissipator pad Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 9 of 11 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 10 of 11 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Swale v 3. 09/10/19 Page 11 of 11 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 1 of 10 GENERAL INFORMATION SCM TYPE: Underground Detention SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: SURROUNDING GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 2 of 10 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe or structure Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 3 of 10 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 4 of 10 UNDERGROUND STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Vault/pipe structurally damaged Circle one: Yes No Not applicable Notes: Weir/Baffles damaged Circle one: Yes No Not applicable Notes: Device leaking Circle one: Yes No Not applicable Notes: Proper drainage Circle one: Yes No Not applicable Notes: Trash or debris accumulation present Circle one: Yes No Not applicable Notes: Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 5 of 10 Sediment has accumulated to a height greater than the orifice or control structure Notes Signs of oil accumulation or other water quality issues Circle one: Yes No Not applicable Notes: Signs of wildlife Circle one: Yes No Not applicable Notes: Signs of undesirable vegetation Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 6 of 10 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s) or structure (Joint failure) Circle one: Yes No Not applicable Notes: Pipe(s) or structure leaking Circle one: Yes No Not applicable Notes: Baffles, weirs, or structure clogged with trash, sediment, or debris Circle one: Yes No Not applicable Notes: Erosion/undercutting/piping signs Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of outlet pipe Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 7 of 10 Evidence of erosion downstream of outlet pipe Circle one: Yes No Not applicable Notes: Overgrown, undesirable, or woody vegetation present Circle one: Yes No Not applicable Notes Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 8 of 10 hi MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 9 of 10 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Underground Detention v 3. 09/10/19 Page 10 of 10 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 1 of 19 GENERAL INFORMATION SCM TYPE: Wet Pond SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 2 of 19 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Structural damage to the inlet pipe including joint separation Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 3 of 19 Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 4 of 19 FOREBAY ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Riprap or stabilization clogged or covered in sediment Circle one: Yes No Not applicable Notes: Excess sediment displaced 50% or more of the design storage capacity Circle one: Yes No Not applicable Notes: Erosion or bare areas present Circle one: Yes No Not applicable Notes: Does the transition berm (if applicable) show signs of erosion Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 5 of 19 Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 6 of 19 BASIN ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Algae covering over 50% of the water surface Circle one: Yes No Not applicable Notes: Undesirable vegetation present in basin (e.g., cattails, phragmites) Circle one: Yes No Not applicable Notes: Sediment accumulated to a depth greater than the original design sediment storage depth Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Erosion or bare areas present in the basin Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 7 of 19 The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Evidence of geese or other waterfowl residence in the pond or other water quality issues Circle one: Yes No Not applicable Notes: Plants growing on vegetated shelf dead, unhealthy, or undesirable Circle one: Yes No Not applicable Notes: Plants on the vegetated shelf need pruning Circle one: Yes No Not applicable Notes: Water surface higher or lower than the design water surface elevation Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 8 of 19 Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 9 of 19 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s) or riser structure Circle one: Yes No Not applicable Notes: Pipe(s) or riser structure leaking Circle one: Yes No Not applicable Notes: Orifices, weirs, or riser structure clogged with trash, sediment, or debris Circle one: Yes No Not applicable Notes: Outlet pipe obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Sluice gate operating through the intended range of motion Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 10 of 19 Trash, sediment, or debris clogging/obstructing trash rack Circle one: Yes No Not applicable Notes: Trash rack damaged Circle one: Yes No Not applicable Notes: Water able to flow freely through the SCM to the outlet control structure Circle one: Yes No Not applicable Notes: Overgrown, undesirable, or woody vegetation present Circle one: Yes No Not applicable Notes: Erosion or other signs of damage at the outlet Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of outlet pipe or at the dissipator pad (if present) Circle one: Yes No Not applicable Notes: Evidence of erosion downstream of outlet pipe or around the dissipator pad (if present) Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 11 of 19 Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 12 of 19 EMERGENCY SPILLWAY Erosion or signs of instability Circle one: Yes No Not applicable Notes: Armoring satisfactory Circle one: Yes No Not applicable Notes: If vegetated, the grass height (between 6 and 12 inches) and cover is adequate Circle one: Yes No Not applicable Notes: Trash or debris present Circle one: Yes No Not applicable Notes: Undesirable or woody vegetation Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 13 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 14 of 19 EMBANKMENT ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Grass cover unhealthy or erosion on earthen embankment Circle one: Yes No Not applicable Notes: Grass appropriate height Circle one: Yes No Not applicable Notes: Signs of seepage on the downstream face Circle one: Yes No Not applicable Notes: Evidence of animal burrowing or activity Circle one: Yes No Not applicable Notes: Signs of piping, settling, scouring, cracking, or sloughing Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 15 of 19 Woody or undesirable vegetation growing on embankment Circle one: Yes No Not applicable Notes: Status Code (Circle One) Fully Functional (FF)-All components are in good working order Partially Functional (PF)-Device is functional, but some components may need minor repair Not Functional (NF)-Device requires repair to be functional Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 16 of 19 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 17 of 19 Embankment section consists of retaining wall Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 18 of 19 APPROXIMATE QUANTITY OF MAINTENANCE ITEMS REQUIRED Pipes Material: Length (ft): Material: Length (ft): Diameter: Diameter: Eroded area for reseeding (sf) Trees >2” DBH removal (ea) Other CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Wet Pond v 6. 09/10/19 Page 19 of 19 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MODERATE SEVERE CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 4 Excellent Condition. Device is functioning properly as intended. No maintenance needs identified. No imminent damage to downstream water quality. 3 Good Condition. Device is functioning properly as intended. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 2 Fair Condition. Device is functioning properly as intended. Moderate (routine and non-routine) maintenance needs identified. No imminent damage to downstream water quality. 1 Poor Condition. SCM is not functioning as intended. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 0 SCM is not functioning. Significant maintenance required to restore SCM function. Potential of damage to downstream water quality. CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 1 of 19 GENERAL INFORMATION SCM TYPE: SCM FACILITY ID: SCM N-FILE: SCM PHYSICAL LOCATION: INSPECTORS NAME: INSPECTION DATE AND TIME: DATE OF LAST INSPECTION: ANNIVERSARY DATE: WEATHER CONDITIONS: (AIR TEMP, PRECIPITATION, ETC.) DATE OF LATEST RAINFALL: AMOUNT OF RAINFALL IN LAST 3 DAYS: GROUND MOISTURE CONDITIONS: SITE CONDITIONS: INSPECTORS NOTES NOTE: This checklist is for the inspection of devices that do not have a specific inspection checklist. There are currently 9 devices with developed inspection checklists: Bioretention Basin, Constructed Wetland, Dry Pond, Filterra, Level Spreader, Sand Filter, Swale, Underground Detention, and Wet Pond. Inspectors should use the appropriate form if available. Depending on the device, several of these assessments will not be applicable. If there are components or items not covered by this checklist, include detailed notes in the “Other Notes” part of each section. GENERAL CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 2 of 19 INLET POINTS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of inlets (Circle One): 1 2 3 4 5 Trash, sediment, debris present at or obstructing the drains/stormwater collection system Circle one: Yes No Not applicable Notes: Trash, sediment, debris present at or obstructing the inlet Circle one: Yes No Not applicable Notes: Evidence of erosion or undercutting at the inlet Circle one: Yes No Not applicable Notes: Inlet system has structural concerns, such as joint separation at the inlet pipe Circle one: Yes No Not applicable Notes: Adequate stabilization present (e.g., riprap, concrete, filter fabric) Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 3 of 19 The riprap or stabilization is clogged and/or covered in sediment Circle one: Yes No Not applicable Notes: Undesirable vegetation present Circle one: Yes No Not applicable Notes: Status Code (Circle One) Maintained (M) - Only routine maintenance needs identified Partially Maintained (PM) - Moderate maintenance needs identified Not Maintained (NM) - Major repairs or rehabilitation is needed Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 4 of 19 FOREBAY/PRETREATMENT SYSTEM ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Riprap or stabilization clogged or covered in sediment Circle one: Yes No Not applicable Notes: Excess sediment displaced 50% or more of the design storage capacity Circle one: Yes No Not applicable Notes: Erosion or bare areas present Circle one: Yes No Not applicable Notes: The transition berm (if applicable) shows signs of erosion Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 5 of 19 Undesirable vegetation present Circle one: Yes No Not applicable Notes: Bypass structure is damaged or obstructed by sediment or vegetation Circle one: Yes No Not applicable Notes: Bypass channel has undesirable or woody vegetation Circle one: Yes No Not applicable Notes: Bypass channel has bare or eroded areas/riprap has been displaced Circle one: Yes No Not applicable Notes: Pretreatment system is free of debris and is functioning properly Circle one: Yes No Not applicable Notes: Status Code (Circle One) Maintained (M) - Only routine maintenance needs identified Partially Maintained (PM) - Moderate maintenance needs identified Not Maintained (NM) - Major repairs or rehabilitation is needed CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 6 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 7 of 19 MAIN TREATMENT AREA ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Algae covering over 50% of water surface Circle one: Yes No Not applicable Notes: Undesirable vegetation (e.g., cattails, phragmites, or other invasives) or woody vegetation present in main treatment area or surrounding area Circle one: Yes No Not applicable Notes: Sediment has accumulated to a depth greater than the storage depth of the original design Circle one: Yes No Not applicable Notes: Trash/debris present Circle one: Yes No Not applicable Notes: Erosion or bare areas present in the main treatment area or surrounding areas Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 8 of 19 Evidence of impacts by wildlife residence (such as geese) in the SCM or other water quality issues Circle one: Yes No Not applicable Notes: Plantings growing in the main treatment area are dead, unhealthy, or undesirable Circle one: Yes No Not applicable Notes: Side slopes maintained/mowed Circle one: Yes No Not applicable Notes: Water level returns to the designed elevation per the design drawdown time for wet devices Circle one: Yes No Not applicable Notes: Ponding on surface of dry devices Circle one: Yes No Not applicable Notes: Observation port or cleanout caps are visibly damaged Circle one: Yes No Not applicable Notes: Drainage system (e.g., underdrain, gutters, spouts, etc.) is clogged or visibly damaged Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 9 of 19 Engineered filter media or permeable pavement is clogged with sediment Circle one: Yes No Not applicable Notes: Engineered filter media is displaced, mounded, or missing Circle one: Yes No Not applicable Notes: Status Code (Circle One) Maintained (M) - Only routine maintenance needs identified Partially Maintained (PM) - Moderate maintenance needs identified Not Maintained (NM) - Major repairs or rehabilitation is needed Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 10 of 19 OUTLET STRUCTURE ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Number of outlets (Circle One): 1 2 3 4 5 Structural damage to the pipe(s) or riser structure Circle one: Yes No Not applicable Notes: Pipe(s) or riser structure leaking Circle one: Yes No Not applicable Notes: Orifices, weirs, or riser structure clogged with trash, sediment, or debris Circle one: Yes No Not applicable Notes: Outlet pipe obstructed/clogged with sediment/trash/debris Circle one: Yes No Not applicable Notes: Distribution system, pumps, sensors, meters, filters, or other mechanical components operating as intended Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 11 of 19 Sluice gate operating through the intended range of motion Circle one: Yes No Not applicable Notes: Trash, sediment, or debris clogging/obstructing trash rack Circle one: Yes No Not applicable Notes: Trash rack damaged Circle one: Yes No Not applicable Notes: Water able to flow freely through the SCM to the outlet control structure Circle one: Yes No Not applicable Notes: Overgrown, undesirable, or woody vegetation present Circle one: Yes No Not applicable Notes: Erosion at the outlet structure Circle one: Yes No Not applicable Notes: Evidence of trash/debris downstream of outlet pipe or at the dissipator pad Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 12 of 19 Evidence of erosion downstream of outlet pipe or around the dissipator pad Circle one: Yes No Not applicable Notes: Status Code (Circle One) Maintained (M) - Only routine maintenance needs identified Partially Maintained (PM) - Moderate maintenance needs identified Not Maintained (NM) - Major repairs or rehabilitation is needed Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 13 of 19 EMERGENCY SPILLWAY Erosion or signs of instability Circle one: Yes No Not applicable Notes: Armoring satisfactory Circle one: Yes No Not applicable Notes: If vegetated, the grass height (between 6 and 12 inches) and cover is adequate Circle one: Yes No Not applicable Notes: Trash or debris present Circle one: Yes No Not applicable Notes: Undesirable or woody vegetation Circle one: Yes No Not applicable Notes: Status Code (Circle One) Maintained (M) - Only routine maintenance needs identified Partially Maintained (PM) - Moderate maintenance needs identified Not Maintained (NM) - Major repairs or rehabilitation is needed CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 14 of 19 Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 15 of 19 EMBANKMENT ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair Grass cover unhealthy or erosion on earthen embankment Circle one: Yes No Not applicable Notes: Grass appropriate height Circle one: Yes No Not applicable Notes: Signs of seepage on the downstream face Circle one: Yes No Not applicable Notes: Evidence of animal burrowing or activity Circle one: Yes No Not applicable Notes: Signs of piping, settling, scouring, cracking, or sloughing Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 16 of 19 Woody or undesirable vegetation growing on embankment Circle one: Yes No Not applicable Notes: Status Code (Circle One) Maintained (M) - Only routine maintenance needs identified Partially Maintained (PM) - Moderate maintenance needs identified Not Maintained (NM) - Major repairs or rehabilitation is needed Other Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 17 of 19 MISCELLANEOUS ASSESSMENT OBSERVATIONS ACTION PICTURE NO. Monitor Investigate Repair SCM accessible both on foot and by vehicle Circle one: Yes No Not applicable Notes: Access to the SCM components clear and adequate for maintenance equipment mobilization Circle one: Yes No Not applicable Notes: Evidence of herbicide/fertilizer use in or around the device Circle one: Yes No Not applicable Notes: Local or adjacent land disturbing activity present Circle one: Yes No Not applicable Notes: Drainage area/overall site is stable Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 18 of 19 Retaining wall, edge restraints, or other structural barrier is cracked or damaged Circle one: Yes No Not applicable Notes: Permeable pavement surface is stained, uneven, or cracked Circle one: Yes No Not applicable Notes: Rainwater harvesting cistern is visibly damaged Circle one: Yes No Not applicable Notes: CITY OF RALEIGH SCM INSPECTION PROGRAM SCM NAME: INSPECTION DATE: Generic v 1. 12/21/21 Page 19 of 19 SCM EVALUATION MAINTENANCE NEEDS ROUTINE MAINTENANCE NEEDED IMMEDIATE CORRECTIVE ACTION NEEDED LEVEL OF SERVICE PROBABILITY OF FAILURE: LOW MEDIUM HIGH CONSEQUENCE OF FAILURE: LOW MEDIUM HIGH SCORING 1 Very Good Condition. Device is maintained per the Operations and Maintenance Manual/Guidance. Only routine maintenance needs identified. No imminent damage to downstream water quality. 2 Good Condition. Device is maintained per the Operations and Maintenance Manual/Guidance. Minor maintenance needs identified that can enhance SCM performance. No imminent damage to downstream water quality. 3 Fair Condition. Device is partially maintained in accordance with the Operations and Maintenance Manual/Guidance. Moderate maintenance needs identified. No imminent damage to downstream water quality. 4 Poor Condition. SCM is not maintained per the Operations and Maintenance Manual/Guidance. Major maintenance required to restore SCM function. Potential of damage to downstream water quality. 5 Very Poor Condition. SCM is not maintained per the Operations and Maintenance Manual/Guidance. Repair/rehabilitation necessary to restore SCM function. Potential of damage to downstream water quality. City of Raleigh Project Number: 60658668 Asset Management Program SCM O&M Plan March 2022 AECOM aecom.com