Loading...
HomeMy WebLinkAboutNCC221758_ESC Approval Submitted_20220506Wake County Environmental Services Department Water Quality Division, Watershed Management Section WAKE 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 C TEL 919 856-7400 • FAX 919 743-4772 ­111 IF ( k1U)i — WMESCA —WATERSHED MANAGEMENT EROSION & STORMWATER CONDITIOANAL FAa9:TSITZA� Project Name Bioprocess Innovations Center Expansion f PLG-003401-2021] Watershed Jordan Lake Date Processing Date Received 1/05/2022 Initiated 1/05/2022 Disturbed Acreage 12.10 acres S&E S&E Permit Number SEC-073114-2022 Plan Review Fee 53.025.00 PAID S&E Permit Fee 53.025.00 PENDING SW SW Permit Number SWF-073116-2022 Plan Review Fee 54.537.50 PAID Applicant: Name Alexandria Real Estate Equities, inc ------------------------------------------------------------------------- Address: 5 Laboratory Dr Ste 3200, RTP,NC 27709 ------------------------------------------------------------------------- Phone: 919 313-6645 ------------------------------------------------------------------------- Email: osherrill@are.com ---------------------------------------- SW Permit Fee 54538.00 PENDING Engineer: Name: -------------------------------------------------------------------------------------------- Taylor Hollingshead, P.E. 131 1/2 S. Wilmington St, Suite 200 Address: -------------------------------------------------------------------------------------------- Raleigh, NC 27603 Phone: -------------------------------------------------------------------------------------------- 919-645-5965 Email: ---------- thollingshead@colejeneststone.com ------------------------------------------------------- Plan Date/Revision Date: 11.19.ZOZ1/1.14.ZOZZ/U4.13.ZOZZ The above -referenced erosion control and stormwater management plans have been reviewed and Approval Date: conditionally approved. 5/3/2022 FUJI FILM is approved for the addition. Plans approved limiting the maximum impervious surface of 421,661 SF (9.68 acres). The project shall provide stormwater control (peak attenuation and nutrient management) with 3 dry detention devices. See approved site data below. roved Site Data: Permitted Imp (SF)= 421661 Nitrogen Pre (lb/ac/yr)= 1.94 Road ISA (SF)= Nitrogen Post (lb/ac/yr)= 2.42 Lots ISA (SF)= Nitrogen Post BMP (lb/ac/yr)= 2.32 OtherlSA (SF)= Nitrogen Offset (lb)= na Conditions of Approval Items marked with an "X" were noted as conditions of the Stormwater and Sediment & Erosion Control Plan approval. Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06. A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to issuance ® 1. of the Stormwater and Land Disturbance Permits. Please call to schedule this meeting at your convenience. The Stormwater and Land Disturbance permit fees are due at that time. ® 2. Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to the issuance of a Certificate of Compliance. [10-30-7(D)] ® 3' Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field modifications to erosion and sediment control devices. No devices shall be removed without prior approval from Wake County. 1 APPROVAL SW+S&EConstructionPI@n-V.1 WM WAKE COUNTY ­111 I, ( k1U)i — Wake County Environmental Services Department Water Quality Division, Watershed Management Section 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 WMESCA -WATERSHED MANAGEMENT EROSION & STORMWATER CONDITIOANAL /A»:TSITZA� Wake County's sedimentation pollution control program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during the project it is determined that the Erosion and ® 4. Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation Control Ordinance of Wake County, this office may require revisions in the plan and its implementation to ensure compliance with the Ordinance. Effective April 1, 2019, prior to the preconstruction meeting with the county, the applicant must obtain from NCDEQ- DEMLR the NCG-010000 NPDES Construction Stormwater General Permit coverage by completing an electronic Notice ® S. of Intent (NOI). The online NOI submittal must include the completed and notarized Financial Responsibility/Ownership Form and this approval letter. See NCDEQ web site at: https://deg.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stormwater- perm its/construction-sw. This project reviewed for Erosion and Stormwater only Ensure compliance with building / fire codes throughout project. see PLG-003401-2021 for Fire comments including but ® 6. not limited to: Ensuring Fire Access Road provided with all-weather surface maintained through gravel or other means and roadway that can withstand load of emergency vehicles. Stormwater COAs - All conditions of approval must be completed and approved by Wake County prior to final plat approval or signoff of the Certificate of Occupancy (C.O.) for future building permits. Items required prior to final plat or building permit approval are checked and listed below. As -Built Plans — Upon completion of required improvements, an as -built plan of required stormwater improvements ® 7. must be submitted (must indicate that stormwater improvements were constructed in accordance with the approved plan). [9-31-2] ® 8. Maintenance Plan ® The developer must record and reference on the record plat, a maintenance plan providing instruction about a. annual maintenance tasks and associated costs for at least a 20-year period. [9-32-3(A)] ® It will be the responsibility of the property owners association or lot owner to update the maintenance plan at b. least every 10 years. [9-32-3(8)] ® 9. Maintenance Agreement The developer must record and reference on the record plat, a maintenance agreement or restrictive covenant ® a. that sets for the property owners association's or lot owner's continuing responsibilities for maintenance, including how cost will be apportioned among lot owners served. [9-32-4(A)] ® b The maintenance agreement must provide that the association and its individual members are jointly and severable liable for maintenance. [9-32-4(8)] All maintenance documents required must be submitted prior to record plat approval and must be referenced on the ® 10. record plat. For developments not requiring record plats, documentation must be submitted prior to building permit issuance. [9-32-6] Performance Guarantee —The county may not approve a record plat or issue a building permit until stormwater ® 11. improvements required of the developer have been completed or a performance guarantee has been provided. [9-31-1] Applicable Regulations ® 12. 9-32-2 Parties Responsible for Maintenance of Improvements The developer must maintain stormwater improvements until accepted by a property owners association or lot ® a. owner. The developer must disclose which party will be responsible for continued maintenance on the record plat. 2 APPROVAL SW+S&EConstructionP1an-V.1 WM ice^ WAKE COUNTY ­111 I, ( k1U)i — Wake County Environmental Services Department Water Quality Division, Watershed Management Section 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 WMESCA —WATERSHED MANAGEMENT EROSION & STORMWATER CONDITIOANAL FAa9:TSITZA� Before improvements are accepted for maintenance by the property owners association or lot owner, the ® b. developer must certify to the property owners association or lot owner and the county that improvements are complete and functioning as designed. ® 13. Part 5 — Enforcement and Penalties ® a. Failure to complete required improvements or failure to maintain improvements as required by the approved plan are violations and subject to a fine of up to $1,000 per day. [9-50] ® b Inspection of Stormwater Improvements — Wake County agents have the right to inspect sites to determine whether stormwater improvements are being installed and maintained in compliance with the ordinance. [9-51] 10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2 ® 14. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year period, the erosion and sedimentation control plan approval becomes null and void. 10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2 ® 15. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year period, the erosion and sedimentation control plan approval becomes null and void. ® 16. 10-30-8 Actions Required Prior to Land Disturbance S&EC plan approval and land disturbance permit issued must be prominently displayed until all construction is ® a. complete, all permanent sedimentation and erosion control measures are installed and the site has been stabilized. A copy of the approved plan must be kept on file at the job site. ® b No person shall initiate a land -disturbing activity until notifying Wake County of the date that the land -disturbing activity will begin. ® 17. 10-31-1 Authority County officials may enter any property, public or private, at reasonable times for the purpose of investigating and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access to any authorized ® a. representative or agent for the County who requests entry for purposes of inspections, and presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representatives while in the process of carrying out their official duties. Agents and officials of the County will periodically inspect land -disturbing activities to ensure compliance with ® b the North Carolina Sedimentation Pollution Control Act, this article, or rules or orders adopted or issued pursuant to this article, and to determine whether the measures required in the erosion and sedimentation control plan are effective in controlling erosion and sedimentation resulting from land -disturbing activity. Any land -disturbing activity will be the responsibility of the person(s) conducting the land disturbing activity, ® c. including the property owners. Failure to prevent off site sedimentation will be deemed a violation of the erosion and sedimentation control regulations of this article. Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401 (Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit requirements. The approval issued in this letter cannot supersede any other required permit or approval. Environmental Betsy.pearce@wakegov.com Contact Info: Consultant: Betsy Pearce, CFM 919-856-7541 �` Contact Shawn.springer@wakegov.com Wake County PE: Info: 919-369-6135 Shawn Springer, PE, CFM 3 APPROVAL SW+S&EConstructionP1an-V.1 WM