Loading...
HomeMy WebLinkAboutNCC221757_ESC Approval Submitted_20220506DocuSign Envelope ID: 86992BA0-FA91-4B9B-A02B-4DD76910E4FF ROY COOPERo' Governor ELIZABETH S. BISER (- Secretary " r�'M1110.� BRIAN WRENN Director NORTH CAROLINA Environmental Quality April 11, 2022 LETTER OF APPROVAL WITH MODIFICATIONS VSP Business, LLC Attention: Shailesh Panara, Manager 1534 Copperplate Road Charlotte, North Carolina 28262 RE: Project Name: Prime Express Kannapolis Gateway Acres Approved: 8.5 Project ID: CABAR-2022-058 County: Cabarrus City: Kannapolis Location: R. L. Ketchie Boulevard River Basin: Yadkin Pee -Dee Stream Classification: Other Submitted By: The -Isaacs Group, PC Date Received by LQS: April 04, 2022 Plan Type: Revised Dear Mr. Panara: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.ggv/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible parry must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 a.rr DocuSign Envelope ID: 86992BA0-FA91-4B9B-A02B-4DD76910E4FF Letter of Approval with Modifications VSP Business, LLC April 11, 2022 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, ED"USigned W 42CFABFC5B8C459.., Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: The Isaacs Group, P.C. Attention: William Pugh 8720 Red Oak Boulevard, Suite 420 Charlotte, North Carolina 28217 DocuSign Envelope ID: 66992BA0-FA91-4B9B-A02B-4DD76910E4FF Letter of Approval with Modifications VSP Business, LLC April 11, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Prime Express Kannapolis Gateway Project ID: CABAR-2022-058 County: Cabarrus Reviewed by: Kenny S. Llywelyn (Sheet C 4.3 Phase 2) All Stormwater pipes that bypass sediment basins and discharge directly to existing drainage inlets must be added an extra protection as a silt sack or equivalent to prevent sediment from getting into the storm drainage system.