Loading...
HomeMy WebLinkAboutSW6220203_Supplement-EZ Form_20220505SUPPLEMENT-EZ COVER PAGE FORMS LDADED PROJECT INFORMATION 1 Project Name Pro ect Area (ac) Dollar General - Raeford (Hoke County) 2 2.84 3 Coastal Wetland Area ac 4 Surface Water Area (ac). High No 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 8 Will the vegetated setback remain vegetated? NIA 9 If BUA ispro osed in the setback . does it meet NCAC 02H.1003 4 o-d !? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 0 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Matt Lowder, PE 28 Or anization: Bowman North Carolina. Ltd. 29 1 Street address: 4006 Barrett Dr. Suite 104 Phone Email: Raleigh, NC 27609 919-553-6570 mlowder@bowman.com Certification Statement: I certify, under penatty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications. operation and maintenance agreements and other supporting information are consistent with the information provided here. uesiciner kto- lIrr <<� 0 )k. n 2+434 - �ffltrttl � I Signature & Designer s52Z 6Dale DRAINAGE AREAS 1 Is this a high density pro ect? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this pro ect have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Infiltration Basin 5 Total drainage area (sq ft 142297 93972 6 Onsite drainage area (sq ft 123745 75420 7 Offsite drainage area (sq ft 18552 18552 8 Total BUA in pro ect (sq ft 58416 sf 58211 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10 New BUA not on subdivided lots (subject to rmittin sf 11 Offsite BUA (sq ft 15492 sf 15492 sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 29892 sf 29892 sf Sidewalk (sq ft 2392 sf 2187 sf Roof (sq ft 10640 sf 10640 sf Roadway s ft Future (so ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 35 % 62 19 Design storm inches 1.0 in 20 Design volume of SCM cu ft 4763 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 1 Please use this space to provide any additional information about the drainage area(s): INFILTRATION SYSTEM 1 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-yearstorm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes ri-90 What is the method for dewatering the SCM for maintenance? Pump (preferred)If applicable, will the SCM be cleaned out after construction? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensedprofessional? Yes 18 jProposed slope of the subgrade surface (%) 0 19 jAre terraces or baffles provided? No 20 IType of pretreatment: Forebay ILr M.nn 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SH Wi elevation (fmsl) 369.90 23 Depth to SHWi per soils report (in) 12120 24 Ground elevation at boring in soils report (fmsl) 380.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate (in/hr) 5.00 27 1 Factor of safety (FS) (2 is recommended): 2.00 1 F1—ftnnc 29 113ottomelevation (fmsl) 374.8 It 30 IStorage elevation (fmsl) 377. It 31 1 Bypass elevation (fmsl) 3802 It For Basins Only 32 1 Bottom surface area(ft) 1590 ft 33 IStorage elevation surface area(ft) 3385. It Fni Tmnrha nnly 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) L.4 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 IDesign volume of SCM (cu ft) 45 ITime to draw down (hours) ADDITIONAL INFORMATION Please use this space to provide any The geotechnical report performed on our site recorded a infiltration rate of 11.3 inches per hour. For our design, we chose to use a more conservate rate of 5.0 inches per hour, line 26. Infiltration 1 2:55 PM 5/5/2022