Loading...
HomeMy WebLinkAboutSW6220203_Design Calculations_20220505Storm Wafer & Erosion Control Design Colculotions May 5, 2022 Dollar General Store NC-211 Raeford, NC Hoke County Prepared for: Rhetson Companies, Inc. 2075 Juniper Lake Road West End, NC 27376 (910) 944-0881 Prepared by: Bowman North Carolina, Ltd. 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 (919) 553-6570 FIRM# F-1445 Bowman TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP HUG SURFACE WATER CLASSIFICATIONS NOAA POINT PRECIPITATION FREQUENCY ESTIMATES GEOTECHNICAL ENGINEERING REPORT WATER QUANTITY/QUALITY DESIGN SUPPLEMENT DRAINAGE AREA MAPS CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME-FLOW SUMMARY POND OUTLET/STRUCTURE SUMMARY TIME OF CONCENTRATION GRASS CHANNEL EROSION CONTROL CALCULATIONS RIP -RAP APRON SKIMMER BASIN ANTI -FLOTATION CALCULATIONS TEMPORARY DIVERSION DITCH OVERVIEW Background This report contains the storm water management and erosion control calculations for the proposed Dollar General retail site. The project site is located at the southeast corner of the intersection of NC-211 and Fulford McMillan Rd, Raeford in Hoke County and is undeveloped wooded and open space area, The proposed project site consists of 2.84 acres and approximately 2.90 acres will be disturbed as part of this project for the construction of the site improvements, The development of the site will result in an impervious area of 42,924sf (0.99ac - 34,69% impervious), The proposed Dollar General parcel is not located within a FEMA designated flood zone as shown on FEMA FIRM Panel 3710940400J with an effective date of October 17, 2006. There are no existing stream or wetland features on the proposed property. There is a proposed storm water management facility (infiltration basin) on site. The SCM outlined in this report has been designed for post —development peak attenuation and water quality. The SCM is designed to capture a drainage area of 2.16 ac with an impervious area of 1.34 ac, The site grading and storm drainage systems are designed to convey stormwater runoff from the impervious areas of the site to the infiltration basin. The site is not located within a coastal county, therefore the design storm for water quality is a 1.0" storm event. Erosion Control Erosion control measures have been designed in accordance with NCDEQ erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction. The construction entrance will be installed prior to construction commencing. A skimmer basin will be used to treat stormwater runoff prior to leaving the site. Accumulated sediment within the project site will need to be removed and the pond constructed to final design conditions prior to final acceptance of the project. Soils The County Soils Survey indicates that Candor sand soils are present on the site. Attached in the Figures section is the geotechnical engineering report which includes site specific information regarding the site investigation and soil profile. Soil Boring B-12 at the proposed infiltration basin shows that a SHWT was not observed within loft of the existing ground surface and the infiltration rate recorded was 11.3 inches per hour. Site Stabilization After final grading is completed, permanent vegetation shall be applied in acccrdance with the seeding requirements and landscape plan for this site. FIGURES Hydrologic Soil Group —Hoke County, North Carolina 35` 0' 2T N 3Y 0' 18' N Map Scale: 1:1,450 rf printed on A portrait (8.5" x 11") sheet. m N Meters l 0 20 40 80 120 Feet 0 50 100 200 300 Map projection: Web Mercator Comercoordinates: WGS84 Edge tics: UTM Zone 17N WGS84 UrSDDAA Natural Resources Web Soil Survey 12/20/2021 Conservation Service National Cooperative Soil Survey Page 1 of 4 35' Cr 27 N 35° 0' 18' N 0 Z 'W V W J IL Q N - N OM 0-AD,O C U N 4) [6 O O U m o E O C U m a M — o. f6 m Co E c N E O N Zi N 0) a)O .L. O C a) to 'Q 3 N u d O C U m L a)w E m (D > w o o ID c > N 0 L O N C T C � N O 0 m `Q co C N o � (n CDjn E O) E c O U C N � N E 2 [6 N N C f6 W E ° p L N Cl) D •-O] N 10 D_ Q V Z U O (o O O C E co E a)0 0 E Nw'O •-. m o N c E = U O cO r -0 •5 Cj Lo -0 O O N U) n N C7 c to N L ma a) -0 ti Z Q @ 04 Uo U 3 0 V E y a 0 Q)> E U W c0 (0 O Q) ❑ L N L to (6 N U U N CL L p N 0 (n ❑ 0 C [0 U O_ O Q O N O O `0 o N 3 (n IO m .- N (o O E L a� >+ - U L 2 OO o N O ccoo a E T O (n 2 �'°.� m o-0 o c v n aEi mD E a (6 L a) (n N N N .o n 16 " -0 0 U O N (n m O 00 N (0 @ — Z N m 0 y a��i -0 o ro a Q O = L m Z E L N C y a o N N c m N rn 0 N 0 (0 (0 a1 E O .� T C N c O- N a m N U f0 (0 7 U Q❑ w �° 0 �0 Co o TE j �U a� Y 3 u E COa L C E O O E m O O 0) N 0 O> Z Q 7 0 a co � C N O U N _N N O > N O (o O tyA U L .O 7 .O Z0 O L O L 4 E u) > U 2 a-6 Q N � O U) U) U) - ❑ (N E H U .- u) N m > 6 0 C N 6 C 0 U U) (6 t L 0- -0 c m m N m N o N `0 O O L E m is o �° d (o N U U O Z cn o C D t 7 0 © e 0 m O " a C O F m o g 0 0 0 N O W C O C O O rn U) m 13 g o d d CL o 0 a `m 0 U 0 o a a O 0 m U IL a a m Q y m¢ C m U O Z p) Q m C U O Z 0 Q m C ®.®® It ■/ `i 7/ a ElO y. y 4 i 4 N Q N Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol AuA CaB Map unit name Autryville loamy sand, 0 A to 2 percent slopes Candor sand, 1 to 8 A percent slopes Totals for Area of Interest Description Rating Acres in AOI Percent of AOI 0.2 4.7% 4.9 95.3% 5.1 1 100.0% Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition USDA Natural Resources Web Soil Survey 12/20/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Hoke County, North Carolina Component Percent Cutoff., None Specified Tie -break Rule: Higher LISDA Natural Resources Web Soil Survey 12/20/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 Uq Lf) Lf7 Q M Ln en m LWi m x f>0 9 H Y P E N N v > c m W o 0 O Q W O� LL p N a N p x N U U 9 LL C m N O ei ° v N N 2 O VIm w mQ O T m m« O : p N z O C O S N LL y m ULL .3 o Q m A a N u ti 3 N L vpi Nei N N i N> d 3 3 ae C; -0 `m U. = a -j a Wow oa W OJ Q Qa W N a Q O a� w Q Ir O w p t/l 2 U- O m v °o In c N c° o o N E v 'n O c 2 a N. N-0 N O o N c o o 0 C m f> o m m m '� Emp�� W �LL-0....m -o LL N E r LL 3 w ii > > m Z a y a �` N n �n m n E ai i E c m 2 Y N ° N y N N O C W v m d N c li N '� U > Y Q O y` C. v U a m y W v v O c E v v O y d N E v c ° m U> C O J v C U Y O 2 m -O C in ° m V1 Q O 0 m v On ° a C v LL N >> d N m v E E E E 0 N� o> o - o c y o o '�° LL o `-' F= m E m° to0. ;° - .m a n d N v 16 m$ w •3 °> > o d v o a m aT'i m w > o m m °°'E L m v O E TA° a�v ci °aEog� a Q W Q L N U J O m U 3 U OO J o O T U d 2 n_u O O z c O N r _ W n c-'iam �� i E -a' Mo '- N N t�- N N LL �I m m o Z ' - m e 3 Nnpv =�om� �m -a�N 1 nm Nv rcz o m m0a �v n Q Qw ww W ovmm U p E m m>�cLLa L ._ z O Epmcmn "O V N v W 2 d' 2 2 - TU m NE �O • NE Q U O umO EW nOVmi nC ac yz W wL L N EV d !nil b11 2 T10 Q LOmO L L L N c O N O O u- O 10 N O O Lq O O O O O O LO N x 01 9 a 0 Ln o r� a E 3 o m Q m 00 v a E di E Z a -8 V Eu 0 E ra Z Ep $ V a E '50 b ° a E $ 'o ho a p 0 2 2 � k % 5 d § 2 f SE 2 ' t € f ■ \ / ƒ / \ } 2 j / � /■ Q k k k © 6 § \ \ / /,.. 2 F k k\ k/ k} G tA j!E s� � I j P- I « ƒ e + 9 / F 1/6/22, 1:37 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 . Location name: Raeford, North Carolina, USA* Latitude: 35.0071, Longitude:-79.3065* Elevation: 379.6 ft** ` source: ESRI Maps + R " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular i PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 906/6 confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min t0.398.0 S82) (0.470-0 569] (0.54 -0 663) (0-604--Q 732 (0-671-0 815 (0.7.742 09-0 874) (0.76.797 3--0 932) 0.80 -0 986 0.850-61005J (0.886-1.11 t1830] 10-min 0.636-0.769 (0.7528-0 91G 0-H-- 661.08 0.967--16.17 1.07 (1.15--21739) 1.21 1548] (1.2741358j {1.34-51267 (1.40-51974) 15-min 0,794-0.9c2 (0.94-14.14). (1,11-21?34) (1.221548) (1-3651065] (1. 5-61176) 0-53 1-IF187 (1.61-81097) 11-69-2.10y 1.759.19) 1. 30-min 251) 1.0921032 1.3141358} [1.5873 1.77 2515) {2.01 2?44] :91 [2$ 2Z6) 2,356287 (2.50 3007) (2. 903.34)(2.8q 77 60-min ?45} (1.3641964) (i.6481a98) [2.02 2 [2,31 2479. {2.67 3 25) t2.96 386[T] (3.23 3o9il) (3:51 4 31 } (3,85 4 79) (d- 4 5,17 2-hr 1.74 (1.58-1.94] 2.11 . (1.91-245) 2.65 (2.39-2.95) 3.06 (2-76-3.4 1) --1-62-71 (3.25-4.03) 4.06 1 (3.63-4.51) F 4.51 1 (4.00-5.00) F 4.96 1 (4.37-5.50) 5.58 1(4.87-6.18) 6.06 (5.25-6.73) 3-hr 1.84 1.67- .06 2.02 2350 2,55 3?14 2.96 3a66 3.51-4.37) (3.96-4.95) 1 (4.415954). (4.67-5.17) (5.51 7606) (fi.01,0177 6-hr 2.19 (1.99 2.44J 2.66 (2.42--2.95) 3.36 (3,04-3,72) 3.92 4, c0 (3.5d 4-34] (4.22-5,19) [4,76-�,84] 6.02 0 6.73 (5-32-G-62) {5.89-7-39 7.73 (6.686.49) 8.55 [7.30-9.39 2.59 3.131 3.98 4.67 5.64 6.45 7.30 8.22 12-hr 1 9.531 10.6 (2.34-2.88] IL(2.84-3-49 (3,59-4.42) (4.20-5.18} 5.03-6.24) (5.71-7.12} (6.41-8.05) (7,14-9.[t5) (8.15-1 0.5} (8.96-11.7) 3.05 3.69 4.67 F 6.51 7.37 8.25 9.17 10.4 24-hr 11.4 (2,83-3.30) (3.42-4,00 4.32-5.05] (5-02-5.89 (5.99-7.04 5.76-7.96} 7.55-&92) 8,36-9,9p 9.46-11.3) 10.3-12.4) 3.54 4.27 5.37 6.23 7.42 8.37 9.35 10.4 11.8 12.9 2-day (3.30-3.81) (3-98A.60) J1 (4.99-5.78) L(5.78-6.71] (6.8g-7.98] (7.71-9.00 8.59-10.1) (9.48-11.2] (10.7-1 2.7 (11.7-13.9) 3.76 4.53 5.65 6.54 7.77 8.75 9.76 10.8 12.2 13.4 3-da y (3.51-4.03] J1 (4.23A.86 (5.27-6,08) 1 (6,09-7.01) 1 (7.20-8.32) 1 (8.08-9.37) (8.99-10.5) 1 (9.91-11.6) 1 {11.2-13.1} (12.1-14.4) 4-day 3.72 4 25 [4. 87811 5. 5 6434 6: 0--2 31 ] 11 U.554,66)6. 5 9.73 (9,39 D.B) 1116-13:6 (1216-14.8 4.61 F 6.76 7.75 9.11F 10.2 11.3 12.5 14.0 F7-day]F 15.3 (4.314.93) (6.32-7.23) 1 (-9.46-10.9 10.5-12.1 11.5-13.3J (12.9-15.0) (14.D-1&4) 5.28 6.30 7.61 8.63 10.0 11.1 12.2 13.3 14.8 16.0 Q10-da (4.98-5.62) (5.93-6.70J [7.1fi-8:06] (8.11-9.t7) (9.39-10,6) (10.4-11,8] (11.4 13 0]1 (12.4-14.2) (13.7-15 81 (14.8-17.1) 20-day 7 6.7.1 53 (7.95 8192 9 43.00.6 1p.6 1? .9] 12123.7 13.3- 5.1 1415-16.5] (15 7-1 91 (1713-ti4.9 (18 6021.4 8.83 10.4 12.2 13.5 15.3 16.7 18.0 19.4 21.2 22.6 30-day (8,35.9.34) 9.85-11.t}} (T1.5-12.9]. (12.8-14.3] (14.4-16.2] (15.7-17.6) (16 9-19 1) (18.2-20.5) r (19.8-22.a} n (21.0-24.0) 11.2 13.1 15.1 16.6 18.5 20.0 21.4 22.8 24.7 45-day 26.1 (10.6-11,8) jj 112.4-13.8] 14.3-15.9 . 1 (15.7-17.5) 17.5-19-5 (18.8-21A) 1 (20.2-22.6) (21.5-24.2.) (23.1-26.2) (24.4-27.7) 19.5 21.6 23.2 24.7 26.3 28.2 29.7 60-day=[(�F--17-8 16.9-18.7 18.5-20.5 20.5-22.7 f21.9-24.4] {23.4-2G.iJ (24 7-27.7] [26.5.29.8) (27.B-31.4 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precplatipn frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Esllrnates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. pack to Tap PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0070&lon=-79.3065&data=depth&units=english&series=pds 1/4 Irerracon de"o R e p o—r t- Engineering Report Proposed Dollar General — Raeford, NC Raeford, Hoke County, North Carolina October 25, 2021 Terracon Project No. 70215215 Prepared for: Rhetson Companies Inc. West End, North Carolina Prepared by: Terracon Consultants, Inc. Raleigh, North Carolina October 25, 2021 Rhetson Companies Inc. 2075 Juniper Lake Road West End, North Carolina 27376 Attn: Mr. Alan Cagel P: (910) 944-0881 E: alan@rhetsoncompanies.com Re: Geotechnical Engineering Report Proposed Dollar General — Raeford, NC Aberdeen Road and Fulford McMillan Road Raeford, Hoke County, North Carolina Terracon Project No. 70215215 Dear Mr. Cagel: Irerracon We have completed Geotechnical Engineering services for the above referenced project. This study was performed in general accordance with Terracon Proposal No. DG2100105/P70215215 dated August 30, 2021. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations and floor slabs for the proposed store. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. Seth A. Bowman Staff Engineer Geotechnical Services ,`��•SNl GARQ4��if�� . •Essig y` •a SEAL 03D �Q* Andrew A. Nash, PE Department Manager Registered NC 031022 Terracon Consultants, Inc. 2401 Brentwood Rd, Suite 107 Raleigh, North Carolina 27604 P (919) 873-2211 F (919) 873-9555 terracon.com North Carolina Registered F-0869 REPORT TOPICS INTRODUCTION.............................................................................................................1 SITE CONDITIONS.........................................................................................................1 PROJECT DESCRIPTION..............................................................................................2 GEOTECHNICAL CHARACTERIZATION...................................................................... 2 GEOTECHNICAL OVERVIEW....................................................................................... 3 EARTHWORK................................................................................................................. 4 SHALLOWFOUNDATIONS........................................................................................... 8 SEISMIC CONSIDERATIONS........................................................................................ 9 LIQUEFACTION............................................................................................................. 9 FLOORSLABS............................................................................................................... 9 PAVEMENTS................................................................................................................ 10 GENERALCOMMENTS............................................................................................... 12 FIGURES..... :................................................................................................................ 14 Note: This report was originally delivered in a web -based format. Orange Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the GeoReport logo will bring you back to this page. For more interactive features, please view your project online at client.terracon. com . ATTACHMENTS EXPLORATION AND TESTING PROCEDURES SITE LOCATION AND EXPLORATION PLANS EXPLORATION RESULTS SUPPORTING INFORMATION Note: Refer to each individual Attachment for a listing of contents Responsive ■ Resourceful Reliable Geotechnical Engineering Report lrerracon Proposed Dollar General — Raeford, NC to Raeford, Hoke County, North Carolina October 25, 2021 ■ Terracon Project No. 70215215 GevReport REPORT SUMMARY Topic Overview Statement rL Project A new, approximate 10,720-square foot single -story Dollar General Store with paved Description heavy-duty drives and parking areas is proposed. A stormwater management area is proposed between the driveway and building. Geotechnical Characterization and Overview Earthwork The borings encountered very loose to medium dense sand in the upper 5 to 8 feet underlain by denser sand and very stiff clay. Groundwater is anticipated at a depth of 8 feet below the existing ground surface. After stripping and priorto placing fill, the exposed subgrade soils in the Iuilding and pavement footprints should be compacted/densified in place using a medium weight static roller. Shallow Allowable bearing pressure = 2,000 ps# Foundations Expected settlements: < 1-inch total, <'/2-inch differential With subgrade prepared as noted in Earthwork. Concrete: ■ 5 inches Portland Cement Concrete (PCC) in Light Duty areas Pavements a 7 inches PCC in Medium, Duty areas and those exhibiting heavy traffic Asphalt: ■ 3 inches Asphaltic Concrete (AC) over 6 inches granular base in Light Duty areas ■ 4 inches AC over 8 inches granular base in Medium Duty areas General This section contains important information about the limitations of this geotechnical Comments I engineering report. 1. If the reader is reviewing this report as a pdf, the topics above can be used to access the appropriate section of the report by simply clicking on the topic itself. 2. This summary is for convenience only. It should be used in conjunction with the entire report for design purposes. Responsive Resourceful Reliable Geotechnicar Engineering Report Proposed Dollar General — Raeford, NC Aberdeen Road and Fulford McMillan Road Raeford, Hoke County, North Carolina Terracon Project No. 70215215 October 25, 2021 INTRODUCTION This report presents the results of our subsurface exploration and geotechnical engineering services performed for the proposed store to be located off Aberdeen Road and Fulford McMillan Road, in Raeford, Hoke County, North Carolina. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: Subsurface soil conditions ■ Groundwater conditions ■ Site preparation and earthwork ■ Excavation considerations ■ Foundation design and construction • Floor slab design and construction 10 Seismic site classification per IBC Pavement design and construction The geotechnical engineering Scope of Services for this project included the advancement of 12 soil borings to depths of 10 feet to 20 feet below existing site grades. Maps showing the site and boring locations are shown in the Site Location and Exploration Plans sections, respectively. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring logs and as separate graphs in the Exploration Results section. SITE CONDITIONS The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Item ' Description - _ _ .�_ �._ '_ ► The project is located at 4451 Currituck Highway in Raeford, Hoke County, Location North Carolina See Site Location and Exploration Plans Site Coordinates Approximately 36.3583°N, 75.9611 °W Existing An existing house. Improvements Responsive Resourceful Reliable 1 Geotechnical Engineering Report Proposed Dollar General — Raeford, NC ■ Raeford, Hoke County, North Carolina October 25, 2021 v Terracon Project No. 70215215 Item 1 rerracan GeoReport Description Current Ground Cover Grassed area around the existing house and sparse trees. Existing Topography Geology Relatively level The subject site is located in the Coastal Plain Physiographic Province. The Coastal Plain soils consist mainly of marine sediments that were deposited during successive periods of fluctuating sea level and moving shoreline. The soils include sands, silts, and clays with irregular deposits of shells, which are typical of those lain down in a shallow sloping sea bottom. Recent alluvial sands, silts, and clays are typically present near rivers and creeks. According to USGS Mineral Resources On -Line Spatial Data based on the 1998 digital equivalent of the 1985 Geologic Map of North Carolina updated in 1998, the site is mapped within Surficial Deposits, Undivided (Quaternary). PROJECT DESCRIPTION Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows: Item A new, approximate 10,720-square foot single -story Dollar General Store Proposed Structure with paved heavy-duty drives and parking areas is proposed. A stormwater management area is proposed between the driveway and building. It is assumed that the building will be a steel frame construction supported Building Construction on a monolithic shallow foundation and concrete slab -on -grade. Metal panes and a brick veneer are anticipated for exterior walls. Finished Floor Elevation Unknown, no grading plan was provided. We have assumed the finished floor elevation to be up to 2 feet above existing grades. Columns: 20 to 50 kips (assumed) Maximum Loads Walls: Up to 3 kips/linear foot (assumed) Floor Slab: 100 psf (assumed) Grading Up to 2 feet of cut and fill (assumed). GEOTECHNICAL CHARACTERIZATION We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of site preparation and foundation options. Conditions encountered at Responsive Resourceful Reliable 2 Geotechnical Engineering Report lrerracvn Proposed Dollar General — Raeford, NC ■ Raeford, Hoke County, North Carolina October 25, 2021 R Terracon Project No. 70215215 Geol4eport each exploration point are indicated on the individual logs. Laboratory tests for moisture content, Atterberg limits, and grain size were conducted on selected soil samples. The individual logs and test results can be found in the Exploration Results section. The GeoModel can be found in the Figures section of this report. As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel. Model Layer _ layer Name �_ _ _Gener l escription 1 Looser Sand Very loose to medium dense sand 2 Denser Sand Medium dense to dense sand 3 Clay Very stiff to hard clay Groundwater Groundwater was measured between 8 and 12 feet in the borings during our field exploration. Mud rotary drilling techniques that were for drilling can obscure the groundwater readings due to the drilling fluid used. Based on measured water depths after drilling and moisture condition of the soil samples, groundwater is anticipated at a depth of 8 feet below the existing ground surface. The groundwater level can change due to seasonal variations in the amount of rainfall, runoff, lower permeability of the soil, and other factors not evident at the time the borings were performed. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. Seasonal High Water Table (SHWT) and Infiltration SHWT determination and infiltration testing was requested in the proposed stormwater pond. The depth to the seasonal high water table (SHWT) at the requested locations will be determined by examining the chroma value of the existing soils. The determination and testing will be completed and provided at a later date. GEOTECHNICAL OVERVIEW The borings encountered very loose to medium dense sand in the upper 5 to 8 feet underlain by denser sand and very stiff clay. After stripping topsoil, the proposed building and parking lot footprints should be densified in place using a medium weight vibratory roller. The purpose of the rolling is to densify the loose, near surface soils and potentially improve floor slab and foundation support. Responsive Resourceful Reliable 3 November 4, 2021 Rhetson Companies Inc. 2075 Juniper Lake Road West End, North Carolina 27376 Attn: Mr. Alan Cagel P: (910) 944-0881 E: alan@rhetsoncompanies.com Re: Geotechnical Engineering Report Addendum 1 Proposed Dollar General — Raeford, NC Aberdeen Road and Fulford McMillan Road Raeford, Hoke County, North Carolina Terracon Project No. 70215215 Dear Mr. Cagel: Irerracon We have completed Geotechnical Engineering services for the above referenced project. This study was performed in general accordance with Terracon Proposal No. DG2100105/P70215215 dated August 30, 2021. This report addendum of our Geotechnical Report dated October 25, 2021 presents the results of the Seasonal High Water Table (SHWT) and infiltration testing in the proposed stormwater pond. STORMWATER DESIGN Subsurface information at the site was obtained during our field explorations on October 11, 2021. The depth to the seasonal high water table (SHWT) at the requested locations was determined by examining the chroma value of the existing soils. The infiltration rate was determined utilizing a soil permeameter. The SHWT at the locations requested was not observed within 10 feet below the existing ground surface and the infiltration rate recorded at the site was 11.3 inches per hour. See attached Soil Evaluation for Stormwater Design report for SHWT information. Terracon Consultants, Inc. 2401 Brentwood Rd, Suite 107 Raleigh, North Carolina 27604 P (919) 873-2211 F (919) 873-9555 terracon.com North Carolina Registered F-0869 Geotechnical Engineering Report Addendum 1 Irerracon Proposed Dollar General — Raeford, NC a Raeford, Hoke County, North Carolina November4, 2021 s Terracon Project No. 70215215 Ge�Report CLOSURE We. appreciate the opportunity to be of service to you on this project. If you have any questions conceming this report or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. Seth A. Bowman Staff Engineer Geotechnical Services Attachments: Soil Evaluation for Stormwater Design �-i Andrew A. Nash, PE Department Manager Registered NC 031022 Responsive Resourceful Reliable 2 4 V ti A oak RD41 .01 -% -.-I- . --. —.� .- I 'A — f " .. :� 9, � e N-10.' .7 lao o 1pq , .. .. * 's I 4 M, A jo w 0 jjjjjillll� 0A 111111's 610 2.1 b P64%1;i 000 a 4FAO 40 W, sigIA 0 PO 60 IN 09610- 1 imo gWr 4% 1p it Ap c9, 2021 lwricrosPofrCorporation 19; 2021, —romTcm Z Va-4cej imaging w 0 z 0 J Q 0 w BORING LOG NO. B-12 Page 1 of 1 PROJECT: Proposed Dollar General - Raeford CLIENT: Rhetson Companies Inc West End, NC SITE: Aberdeen Rd and Fulford McMillan Rd Raeford, NC w cD LOCATION See Explon Plan) Z wo Lu a ATTERBERG LIMITS w o v Latitude: 35.0063- Longitude:-79.3062' LL _ Q w � J o w z z LL w a w of w w a w Z LL-PL-PI U m ip < LLa DEPTH a y' 0.4 TOPSOIL, 5 inches SILTY SAND ISM), light brown, very loose 1-1-2 N=3 1-2-1 N=3 5 5.5 CLAYEY SAND (SC), brown and red, medium dense to dense 3-7-17 N=24 2 12-15-17 N=32 ' 10.0 1 Boring Terminated at 10 Feet Stratification lines are approximate. In, -situ, the transition may be gradual. Hammer Type' Automatic Advancement Method: See Exi loration and Testing Procedures for a Notes: 2 1/4" HSA description of field and laboralory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Abandonment Method: Boring backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS Irerracon Boring Started: 10-11-2021 Boring Completed: 10-11-2021 No free water observed Drill Rig: D50 Driller: JT 2401 Brentwood Rd Ste 107 Raleigh, NC Project No.: 70215215 ffi Cave in depth tz o c d 'O a �o� o'o I %, l�soor�morn 0 J Y-0 T" CV M N O M N {O C)0 co t•- In V- M In co o 0 0 o- o V- � O N st M N IT m � G 00 _ il- tLL a L I;,-I� L_ C to _ C,N O o w _ N O O O Y C O O C-) coOr U. r :a II v r O N c N ao m N ti ti t` � R � L� O O P �� 0 0 0 .00000 LL Q U A r 0 0 +� O r r r r p 0 M o o 6 > E o 0 0 0 0 0 00 s- Y C N mLL m c E w a C U ,�� m a c O a me- t G = rn cU E m Qxa Ep a ZG m ._ E _0 C O Cf = c 0 p a C Cco m m C Q] y U 2 0 0 0 O O O O CD C C N co � 1'rz IR � U- H (n m m e. N- V- V.: e- t+ e- p a _ I., co ill O O .. to _ °" o E� a cO p�a�O�Otocv V `� Lp N E p d � r a `� o coo N C II E,c Z7 E U E m s c to 19 op C) N coO M C Q ems- to m U t'a V V E E3 a Z I v N o'o c*'i c ON w�+ �" oiod LL' N O 10 G S[ = 01 r N U N a - II C C O� O Z�_ m IO O O P tt N It ti W 7 "U O = Q .c O O rn o y 'v L c tF e} e! c'Y CV r= O Qj it Q W (qLo aD E E_m v�E CV) ��MMM r E m v Q E z M M M M M Q (O c C ❑ E to ~ = W j O p 0 0 0 0 O O ♦+ a N� M "p U 72 O O O O O O v = ` No M n •� m R N N N N �' m y ❑ •pd Q N N N N N N = u�i ID ll a> Q [) li :T m m c_ w �0 mU c 0 c.Swr`.o U a N v❑-t M N �+ X 3 �••,U°°' °m�om ti000U.5 ~CC NcC rn 0 GL_ LL L_ LL p a.or� UU o� 0 '= O O LD.❑ mm m ca N D= oc O N L N Q co v+ .i w; M G 5 m ,5a to >- U L. O Q c N p 0 IM Ua2FF-c o Q� W w c Z hi E a E ma E ! G O N X f0 O co � o a ¢ qt LmGcncmm =w.� .- �'� P3 (h 01,1A r WATER QUALITY/QUANTITY SUPPLEMENT-EZ COVER PAGE L FORMS LOADED PROJECT INFORMATION 1 Project Name Dollar General - Raeford Hoke County) 2 Project Area (ac) 2.84 3 Coastal Wetland Area (ac �^ 4 Surface Water Area (ac 5 Is this project High or Low Densi ? High 6 Does this project use an off -site SCM? No OMPLIANCE WITH 02H .1003(4 7 1 Width of vegetated setbacks provided (feet) 8 lWill the vegetated setback remain vegetated? NIA 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System _ Bioretention Cell 1 12 0 0 0 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 0 16 Sand Filter 0 17 18 Rainwater Harvesting (RWH) 0 0 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond _ 0 0 23 StormFilter 24 Silva Cell 0 25 �Filterra Bayfilter 0 26 0 FORMS LOADED 27 INameand Title: Matt Lowder PE 28 _ Or anization: Bowman North Carolina Ltd. 29 Street address: 4006 Barrett Dr Suite 104 30 Ci , State Zip: Phone number(s): _ _ Email: Raleigh, NC 27609 31 919-553-6570 32 mlowder(a)bowman.com Certification Statement: I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision: that the information provided in the form is, to the best of my knovdedge and belief, true, accurate, and complete-, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. k SEAL � - r r u Cf� f till W'vw.� Signature k Designer Date 5/512Z DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so number of IrnN dens draina a-azeas D 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 -fype of SCM Infiltration Basin 5 Total drainage area (sq ft 142297 93972 6 Onsite drainage area (sq ft) 123745 75420 18552 7 Offsite drainage area R 18552 8 Total BUA in project (sq ft 58416 sf 56211 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10_permitting) New BUA not on subdivided lots (subject to is 11 Offsite BUA (sq 11) 15492 sf 15492 sf 12 Breakdown of new BUA not on subdivided lots: Parkin (sq ft) 29892 sf 29892 sf Side 31k (sq ft 2392 sf 2187 sf Roof (sq ft 10640 sf 10640 sf Road" s ft Future (so ft Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to (sq It 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (s A) 18 Percent BUA 35% 62% 19 Design storm (inchesL 1.0 in 20 Desi n volume of SCM cu ft 4763 d 21 Caleulation method for design volume Simple Method ADDrTtONAI.IN ATiON 22 Please use this space to provide any additional information about the drainage areas : INFILTRATION SYSTEM 1 0raln® a area number 1 2 Minimum required treatment volume cu ft) 4 63 GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10 ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? as 9 What is the method for clewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8 ? Yes 12 Does the drainage easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? NIA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes 16 Does the SCM follow the devices ecific MDC? Yes 17 lWas the SCM desiR221by an NC Aoerlsedprofessional? Yes WRIar"n SYSTEMzggggg2iftam 18 fIroposed slope of the subgrade surface (%) 0% 19 Are terraces or bafflesprovided? No 20 [Type of pretreatment: Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWTelevation (fmso 369.90 23 Depth to SHWT per soils re ort in 121.20 24 Ground elevation at oring in soils report fmsl 380.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate in/hr 5,00 27 Factor of safety (FS) (2 is recommended): 2.00 I Elevations f 29 1 Bottom elevation fmsl 374.8 ft 30 1 Storage elevation (fmsl 377. ft 31 lBygass elevation fnlsi 380.2 ft For Basins Only 32 Bottom surface area ffZ 1590 ft 33 1 Storage elevation surface area (ft?) 3385. ft For Tlenhes Only 34 4 ft 35 Width ft 36 Perforated pipe diameter, if a plicable (inches) 37 Number of laterals 38 Total length of perWated i in 39 Stone type, if applicable 40 Stone porosity 41 Is stone free of fines? 42 Is the the stone wrapped in geotextile fabric? 43 _ Has at least one inspection port beenprovided? volume of SCM (cu ft) j 4763 cf 46 Please use this space to provide any additional information abot infiltration system(s): 1e geotechnical report performed on our site recorded a infiltration rate of 11 3 ches per hour. For our design, we Grose to use a more conservate rate of 5 0 ches per hour, fine 26 Infiltration 3 2:02 PM 5/5/2022 vim tlNIdaX ND ldv [,Toci yyy. �e�0 rc'�`i.ar 731�����Z�Q NVId 30VNMa I ONIOUID ff �h "• { a g � $ � @@@� s � All, Alb ' ;1 sae Ei�� g .-1 a rfag gillsir ` 6 i` r�EiiAi��� ! 1 q• � r � �r {'ars saa49�oil its ■ fit ♦ i � � � { r p oil M. pi � 'P , �� �� g �- •� j° 9 y°y I We Eg , 3 : ! ' �'' I •, � 4 ` ! �� g` g ' pp � � � � ��� ! i� f �E� ot �Q� ��iy slsEr 9�s4�6r4 S r s siilrsl:yly rass 1 I � .r!Milli Iy 'Ills i 1 J"Ia I dif I _ fx 1 e % ] �+yR. C ° --- ""`�"a+�+a unR• �y 13MOSM aVTWIOa 11 z ! ! Ueulmos NVId 30VNrvUa S WUVk!'J fill t xt .'�r � � 1����g • � ggg� ����i � � � �i� '� Btltl q ¢ ps Him - ! Ylipip 93qq y� i o J€aY: + + E 6� �e� i�3ii0 y9 Y it if 11 its j& 3 rg filly ! � r " 9N Ill� � � 17Q A !� ! qq Eg¢g �N�¢ BA 4R��AA3 yA 76 gA �7s�6As4 s e y s s"�gAs9�yiy sus A a.a id i � �•� i r�i J t r e gg e a _ Q�AFAlA if 6y� is a� -� �M Nm it I I I � 1 + AW*-aMNNWAI 2m" N [mmk_m T] Tod $ ueujmog r :a•xr 'rY2Iv_d V'JH1tlON Otl033tltl yy ,* 3NHD2IV'i'IOQ NV'Id 30VNna I ONIC 0 v j • � 3 isr! � Q y� 3g � ! � � _ �� � %r � a [ �', • f1• 9 � °�Q�I • r !� i�l4i 1 � Y �1 � i ��r � � �� � E • ' c`g °� �1 4lilt, r y �•, _ � ° g $ l�F� 1� g �� 11 �� Y p � r 1% - , 11 fififi if I Ii a III � 44 jj 1 f 3 5 1 , , , , t , , , L I e [ [ . IgI r _ 9 e r s 9 9 r _ , 9 1 � S A'4FAlIf4L 7f41:Y 4��g 1 I 1 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Pre -Developed Conditions (Overall Site) Drainage Area (acres, 2.59 Existing Soil Groups: Soil Grouv Map Symbol Soil Description Acres Percent of DA A CaB Candor sand 2.59 100% Exist_inq Land Uses: Land Use Description Existing Soil G►oy Acres Curve # Weighted CN Open Space - Good A 2.36 50 45,E Wooded - Thin A 0.23 55 4.9 Cumulative Curve # = 50.4 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post -Developed Conditions (Infiltration Basin) Drainage Area (acres,Z 2.16 Existing Soil Groups: Soil Grouo Map Symbol Soil Description Acres Percent of DA A CaB Candor sand 2.16 100% Promised Land Uses.' Land Use Description Existing Soil Group Acres Curve # weighted CN Open Space - Good A 0.76 50 17.6 Impervious Area - Building/Pavement A 1.34 98 60.8 Wooded - Thin A 0.06 55 1.5 Cumulative Curve # = 79.9 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post -Developed Bypass Conditions (Infiltration Basin) Drainage Area (acres): 0.43 Existing Soil Groups: Soil Grotto Map Symbol Soil Description Acres Percent of DA A WaB Wagram loamy sand 1.02 237% Proposed Land Uses. Land Use Description Existing Soil Groin Acres Curve # W6ghted CIV Open Space - Good A 0.25 50 29.1 Impervious Area - Building/Paveme A 0.01 98 2.3 Wooded - Thin A 0.17 55 21.7 Cumulative Curve # = 53.1 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin #1 Drainage Area (DA) = 2.16 Acres 93972 sf Impervious Area (IA) = 1.34 Acres 58211 sf Percent Impervious I = 61.95 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.61 in/in Water Quality Volume = 0.109 ac-ft Water Quality Volume = 4,763 cf Water Quality Volume = 0.608 inches of runoff NDAA 1-year. 24-hour event = 3.05 inches Minimum Surface Area SA = (12`FS*DV)/(K-T) Factor of Safety (FS) = 2 Design Volume (DV) = 4763.3 cf Hydraulic Conductivity of Soil = 5.00 in/hr Max Dewatering Time = 72 hours SA = 317.6 sf Drawdown Time T = FS ` (DV-12)/(K*SA) Factor of Safety (FS) = 2 Design Volume (DV) = 4763.3 cf Hydraulic Conductivity of Soil = 5.00 in/hr Surface Area Provided = 1590 sf Drawdown Time = 14.4 hours w O U p U U w U O cD c0 T r7 CT)4 ILO r j p 06 N T r7 LCS cD W (n (n (n (n (n (n (n S W W Q Q Q Q Q Q U Q Q �- � O) LO a) cD Q rn cD O O O O T O O LL (� (n w (� cn cn (n (� \/ J cD 00 r-) 00 p O� CN N 00 CD Q _ 00 N W rY Cn � W w cn m z w � L Q Q w w > r� w Q:f N T Q w ( 1 (n ::D f w I I O Q U > I (n w LL- Q of w Z w a- z O z w J w m � u cn o v� o w > Q 3 w Q wF-- w z cn Q w o a_ o Z O m Qolf m cn F- CD X w U z Of a- i I � � I fl r !I ! I I II I II I I II ! I I! I I I I r I I „ ! ! /I II Do I f II � II �1 ---- - - - - - - of< Q w J o N 1 � a cn o = d QOf w z d Of o 1 1 1 J Z � L LIJ cc) aw LL) Ui �ww W j w w w O Z Q V) �� a a U g w w0 w z u nx W v � rl V O CW7 Q O LL N V 0 M ^ M^ Ln W CSW H N � C" � � N O w`�- J � W LLIM CD O ah n t00 LLJU M N oMD r4 u^9 O — N W QOf Q O M 08 pp ILA 9 L—r, ^ N M to to Op C H U CO L tL z OR O O O O O O P� � W r� n n n r- a$ M 8 M V J O N N N N N N CT CD CD CD cV M7 � ll7 LA H N p W d O JW LLI W L.LLNLLOLLNL p Z U U U U N � to N OO 00 q* O O O- O n dU OCOcV W O J pLNa Z L�L LNL LL LOL UUUU O M O O O CO p W p O p J CL WW fn Cn N N fn � WCx7 p UUUUU NN � W W W ~a (n 0000`a CO CO QM at U Q � O O O O O C C C a Z cc 00 c0 � p O -O)P7M N O r W a - O CD J WL Ni N p p U LNL LNi LNL U U U LL-U U J O U Z_ Cf) coo' N C10 q* _ N ocCo�°OO Z t m CVnr) O� COIN Z o LLJ U) o �p Z LLI ZQ LNLLNLLN UUUU rC Op O W ��O I d ON000 W W O� v4U-) COCVco W U O 7- Cl co P d w _N M Q O �N I LLJ O N� O O �~ Q LLJ Z �= .-"Lri a-=¢ 2 z 5 z cn ¢away � ZZz�`' M z¢ a::-CCI� w w cc LLJ M NW W6N WZ w w wV �O W0 oNU o U QLLI m c) Ln aC9ZU m Z � W W WO LLI C, O_ p WOO C� Z W ck:: U)(/)� O Q O LLI Z�jO N�LQ�II W W W LLI > W KR� O= OZ�N¢ O= LLL.O w O m WLa��ail O r r rOO =fn(n2d a MCnOH OUF -:-C14 ilk 2 I wpp B 32 • ��� 5�� _fit d310 Al < • LIS Pond Report s Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2022 Wednesday, 02 / 9 ! 2022 Pond No. 1 - BMP Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 374.80 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 374.80 1,590 0 0 0.20 375.00 1,745 334 334 1.20 376.00 2,535 2,140 2,474 2.20 377.00 3,385 2,960 5,434 3.20 378.00 4,290 3,838 9,271 4.20 379.00 5,250 4,770 14,041 5.20 380.00 6,270 5,760 19,801 5.90 380.70 7,015 4,650 24,451 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) = 10.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 380.20 0.00 0.00 0.00 No. Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad - Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 5.000 (by Contour) Stage (ft) 6.00 5.00 4.00 moil] 2.00 91 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge Elev (ft) 380.80 379.80 378.80 377.80 376.80 375.80 0.00 r ' ' ' I 'I i' 374.80 0.00 100 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Q Discharge (cfs) Hydrograph Summary Rep o r�ydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.041 2 754 1,007 -- -- -- SCM Pre -Developed 2 SCS Runoff 4.698 2 718 9,418 --- ----- SCM Post -Developed 3 Reservoir 0.000 2 684 0 2 376.53 4,034 Post Through SCM 4 SCS Runoff 0.020 2 730 262 - -- — ----- SCM Post -Developed Bypass 6 SCS Runoff 0.062 2 154 602 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 216 0 6 374.85 779 1.OinPost Through SCM Infiltration.gpw Return Period: 1 Year Wednesday, 02 / 9 / 2022 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31DO by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 0.041 cfs Storm frequency = 1 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 1,007 cuft Drainage area = 2.590 ac Curve number = 50.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 18.90 min Total precip. - 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre -Developed Q (cfs) Q (cfs) Hyd. No. 1 -- 1 Year 0.10 - 0.10 0.09 — 0.09 I I 0.08 - 0.08 0.07 - 0.07 0.06 - - 0.06 0.05 0.05 0.04 I 0.04 � r 0.03 0.03 0.02 - - 0.02 i 0.01 - ` 0.01 I I 0.00 7L- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D@ by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge = 4.698 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 9,418 cuft Drainage area = 2.160 ac Curve number = 79.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 WO 1.00 SCM Post -Developed Hyd. No. 2 -- 1 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D@ by Autodesk, Inc v2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used Exfiltration extracted from Outflow. 4.00 3.00 2.00 1.00 M Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Post Through SCM Hyd. No. 3 -- 1 Year 120 240 360 480 600 Hyd No. 3 Hyd No. 2 Wednesday, 02 / 9 / 2022 = 0.000 cfs = 684 min = 0 cuft = 376.53 ft = 4,034 cuft Q (cfs) 5.00 3.00 2.00 1.00 0.00 720 840 960 1080 1200 1320 1440 [� Total storage used = 4,034 cuft Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 0.430 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.05 in Storm duration = 24 hrs Q (cfs 0.10 - 0.10 0.09 — 0.09 0.08 - 0.08 0.07 — 0.07 0.06 0.06 0.05 0.05 0.04 - — - 0.04 0.03 0.03 0.02 ; 0.02 0.01 - 0.01 0.00 --� - i- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Wednesday, 02 / 9 / 2022 Peak discharge = 0.020 cfs Time to peak = 730 min Hyd. volume = 262 cuft Curve number = 53.1 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Bypass Hyd. No. 4 -- 1 Year 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 6 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.062 cfs Storm frequency = 1 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 602 cuft Drainage area = 2.160 ac Curve number = 79.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 1.0 Post -Developed to SCM Hyd. No. 6 -- 1 Year 60 120 180 240 300 360 - Hyd No. 6 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 420 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 7 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 6 - 1.0 Post -Developed to SCVhx. Elevation Reservoir name = BMP Pond Max. Storage Storage Indication method used. EAltration extracted from Outflow. Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 8 Wednesday, 02 / 9 / 2022 = 0.000 cfs = 216 min = 0 cult = 374.85 ft = 78 cuft Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 20 40 60 80 100 120 140 160 180 200 220 240 260 Hyd No. 7 Hyd No. 6 ® Total storage used = 78 cult Time (min) 1.0inPost Through SCM Hyd. No. 7 -- 1 Year 10 Hydrograph Summary Repo rlydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) --- Hydrograph Description SCM Pre -Developed 1 SCS Runoff 0.242 2 732 2,406 ------ - 2 SCS Runoff 6.484 2 716 13,092 ------- --- — SCM Post -Developed 3 Reservoir 0.000 2 672 0 2 377.15 6,002 Post Through SCM 4 SCS Runoff 0.106 2 724 553 --- -- ------ SCM Post -Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ - -- 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 n/a 0 6 374.80 0.000 1.0inPost Through SCM Infiltration.gpw Return Period: 2 Year Wednesday, 02 / 9 / 2022 11 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 31DO by Autodesk, Inc v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.590 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.69 in Storm duration = 24 hrs Wednesday, 02 / 9 / 2022 Peak discharge = 0.242 cfs Time to peak = 732 min Hyd. volume = 2,406 cuft Curve number = 50.4 Hydraulic length = 0 ft Time of conc. (Tc) = 18.90 min Distribution = Type II Shape factor = 484 SCM Pre -Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 0.50 0.50 0.45 ---- 0.45 0.40 - 0.40 I 0.35 - — I — 0.35 0.30 0.30 0.25 0.25 0.20 - f 0.20 0.15 . 0.15 I 0.10 - I 0.10 0.05 k - - 0.05 0.00 - - — - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.160 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.69 in Storm duration = 24 hrs N. Me 5.00 4.00 3.00 2.00 1.00 Wednesday, 02 / 9 / 2022 = 6.484 cfs = 716 min = 13,092 tuft = 79.9 = Oft = 5.00 min = Type II = 484 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Hyd. No. 2 -- 2 Year Q (cfs) 7.00 . M 5.00 HOES 3.00 2.00 1.00 0.00 , I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 672 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 377.15 ft Reservoir name = BMP Pond Max. Storage = 6,002 cuft Storage Indication method used. Exfiltration extracted from Outflow . oR 4.00 3.00 2.00 1.00 Post Through SCM Hyd. No. 3 -- 2 Year Q (cfs) 7.00 . �� 5.00 4.00 3.00 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 6,002 cult 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Peak discharge = 0.106 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 553 cuft Drainage area = 0.430 ac Curve number = 53.1 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor - 484 Q (cfs) 0.50 ` 0.50 f 0.45 1 I 0.45 k 0.40 - 4 I 0.40 j 0.35 0.35 0.30 ; 0.30 0.25 i - 0.25 I 0.20 — 0.20 i I 0.15 i — 0.15 0.10 — 0.10 4 0.05 0.05 0.00 -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 SCM Post -Developed Bypass Hyd. No. 4 -- 2 Year 17 Hydrograph Summary Repo Oydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.032 2 726 8,553 - - --- SCM Pre -Developed 2 SCS Runoff 11.81 2 716 24,105 -- - - SCM Post -Developed 3 Reservoir 0.000 2 570 0 2 378.63 12,254 Post Through SCM 4 SCS Runoff 0.580 2 722 1,745 -- ------ SCM Post -Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 - - -- 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 n/a 0 6 374.80 0 000 1.0inPost Through SCM Infiltration.gpw Return Period: 10 Year Wednesday, 02 / 9 / 2022 18 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 2.590 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 we Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Wednesday, 02 / 9 / 2022 = 2.032 cfs 726 min = 8,553 cuft = 50.4 = Oft = 18.90 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 19 Hydrograph report Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 2.160 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs 10.00 OR 4.00 2.00 we Wednesday, 02 / 9 / 2022 Peak discharge = 11.81 cfs Time to peak = 716 min Hyd. volume = 24,105 cuft Curve number = 79.9 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Hyd. No. 2 -- 10 Year 120 240 360 480 600 720 Hyd No. 2 Q (cfs) 12.00 10.00 OR . IX 4.00 0 1l 0.00 840 960 1080 1200 1320 1440 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 570 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 378.63 ft Reservoir name = BMP Pond Max. Storage = 12,254 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 60 120 Hyd No. 3 Post Through SCM Hyd. No. 3 -- 10 Year Q (cfs) 12.00 10.00 1M N. We 4.00 2.00 0.00 180 240 300 360 420 480 540 600 Time (min) Hyd No. 2 Total storage used = 12,254 cult 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc v2022 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.430 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs 1.00 .i -- 1.00 0.90 — — -I - - - - 0.90 0.80 0.70 - - — - - 0.70 0.60 - - 0.60 I 0.50 1 — 0.50 I 0.40 — 0.40 0.30 - I 0.30 0.20 — - 0.20 0.10 0.10 E , 1 0.00 • - Ll 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Wednesday, 02 / 9 / 2022 Peak discharge = 0.580 cfs Time to peak = 722 min Hyd. volume = 1,745 cuft Curve number = 53.1 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 SCM Post -Developed Bypass Hyd. No. 4 -- 10 Year 24 Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) I (ft) (cuft) 1 SCS Runoff 6.873 2 726 23,010 -- - - — SCM Pre -Developed 2 SCS Runoff 20.52 2 716 42,986 — ------ - -- SCM Post -Developed 3 Reservoir 1.086 2 744 2,664 2 380.32 21,912 Post Through SCM 4 SCS Runoff 1.658 2 722 4,418 --- -- - SCM Post -Developed Bypass 6 SCS Runoff 0.000 2 n/a 0 -- ----- ------ 1.0 Post -Developed to SCM 7 Reservoir 0.000 2 n/a 0 6 374.80 0.000 1.0inPost Through SCM Infiltration.gpw I Return Period: 100 Year I Wednesday, 02 / 9 / 2022 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 2.590 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.25 in Storm duration = 24 hrs Q (cfs) 7.00 M 5.00 4.00 300 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Pre -Developed Hyd. No. 1 -- 100 Year Wednesday, 02 / 9 / 2022 = 6.873 cfs = 726 min = 23,010 cult = 50.4 = Oft = 18.90 min = Type II = 484 Q (cfs) 7.00 AMC 5.00 4.00 2.00 1.00 0.00 '1 L I ' ' "— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge = 20.52 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 42,986 cuft Drainage area = 2.160 ac Curve number = 79.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 • 11 NOW MIQ SCM Post -Developed Hyd. No. 2 -- 100 Year Q (cfs) 21.00 18.00 15.00 12.00 • el . �� 3.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 02 / 9 / 2022 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 1.086 cfs Storm frequency = 100 yrs Time to peak = 744 min Time interval = 2 rain Hyd. volume = 2,664 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 380.32 ft Reservoir name = BMP Pond Max. Storage = 21,912 cuft Storage Indication method used. Exfiltration extracted from Outflow Post Through SCM Hyd. No. 3 -- 100 Year 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 120 240 360 Hyd No. 3 Hyd No. 2 Q (cfs) 21.00 18.00 15.00 12.00 M we] 3.00 0.00 480 600 720 840 960 Time (min) Total storage used = 21,912 cult 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 SCM Post -Developed Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 0.430 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.25 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 we Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor SCM Post -Developed Bypass Hyd. No. 4 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 4 Wednesday, 02 / 9 / 2022 = 1.658 cfs = 722 min = 4,418 cult = 53.1 = Oft = 10.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) W{ ; k/ | k /k7 �» § Ut ! | ■ | k �® § { � | z! 2 |/ ■ } k} ! � | k k �! ■ k «■!Ct (| � ov ƒ Z7! o � | Bowman North Carolina, Ltd. Dollar General - Raeford, NC - Grass Channel "C" calculations Rational Runoff Coefficient "C" Grass Channel # 1 Drainage Area (acres 2.61 Pran�sed l a ses: Lind Use Desolation Acres %Site Runoff "C C. Roofs 000 0% 0.95 0.00 Asphalt/Concrete Pavement 036 14% 0.95 0.13 Lawn 2.25 86% 0.3 0.26 0.00 0% 0.2 0.00 _Wooded Total Area- 2.61 Cumuialive "CC" 0.39 1 no= 7.98 Qio= 8.12 NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > Grass Channel #1 Name Grass Channel #1 Discharge 8.12 Channel Slope 0.0076 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density Good 65-79% Soil Type Sandy Loam (GM) DS75 North American Green 5401' St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Remarks Permissible calculated Safety Staple Phase Reach Discharge Velocity Depth Mannings N Shear Stress Shear Stress Factor Pattern DS75 Straight 8.12 cfs 2.5 ft/s 1.05 ft 0.036 Unvegetated Underlying Straight 8.12 cfs 2.5 ft/s 1.05 ft 0.036 Substrate 1.6lbs/ft2 0.5lbs/ft2 3.22 STABLE D 1.51lbs/ft2 0.27lbs/ft2 5.6 STABLE D EROSION CONTROL CALCULATIONS EROSION CONTROL CALCS (RIP -RAP CALCULATIONS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Rip -Rap Apron#1 ' All units are in feet " Dissipator pad designed for full flow of pipe Dollar General BM Date 2/2/2022 Date Date Pipe Diameter d= 15 Pipe Slope s= 0.5 % Manning's number n= 0.013 Flow Q= 2 cfs Velocity V = 2.00 ft/s Dissipator Dimensions " Zone = Stone Filling Class = Entry Width ( 3 X Do ) _ Length ( 6 X Do ) = Width (La + Do) _ Min. Thickness = Min. Stone Diameter= i 38 2 B 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches 8.8 RIP -RAP 2/9/2022 Page 1 of 4 Rio -Rao Aaron#3 Pipe Diameter d= 15 in Pipe Slope s= 0.91 % Manning's number n= 0.013 Flow Q= 4 2 cfs Velocity V = 2.00 ft/s Dissipator Dimensions * Zone = 4 2 Stone Filling Class = B Entry Width ( 3 X AO ) = 3.8 ft Length (6 X AO) = 7.5 ft Width (La + AO) = 8.8 ft Min. Thickness = 22 inches Min. Stone Diameter= 6 inches * All units are in feet ** Dissipator pad designed for full flow of pipe I 8.8 RIP -RAP 2/9/2022 Page 3 of 4 EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Dollar General -Raeford Project #: 058-011 Designed by: BRM Date: _ Revised by: Date: Checked by: Date: Skimmer Basin #1 Drainage Area 25-year Runoff (Q25) Surface Area Required Total, AT= 4.53 Ac Disturbed, Ao= 4.53 Ac C = 0.50 T. = 5.00 min 125 = 8.90 in/hr 025 = 20.2 cfs SA = 325sf x 025 SA = 6,552 sf Volume Required VR = 1800 cf/Ac x AD VR = 8,154 cf Sediment Trap Dimensions L = 120 ft (spillway Length) W = 55 ft (Spillway Width) D = 2.0 ft (Depth of Storage) Side Slopes = 2 :1 Lw= 128 ft Lb„= 112 ft W., 1Ni_, Wbp= 63 ft 1. _ Wb,r= 47 ft UW Ratio= 2.2 :1 (must be 2:1 to 6:1) Elevations DBSCl/ohOn Elevation Top of Bens 380.00 (allow 1fl freeboard above spillway Bow height) Emergency Spillway 378.50 Sediment Storage 378.00 Cleanout Mark 377.00 (half of storage height) Bottom 376.00 Provided SAP= 6,600 sf > 6,552 VP= 11,864.0 cf > 8,154 Emergency Spillway - 10 Year Storm 125 = 8.90 in/hr 025 = 20.16 cfs h = 0.5 ft Cw = 3 Lw= 10 ft EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Anti -Flotation Device 4' x 4' Outlet Structure Area: Top of Basin Elev.: Bottom of Basin Elev.: Volume: 32.0 cf Weight: 1997 Ibs 1.20 WT Req'd of Anti -Flotation Device: 2,396 Ibs Volume of Concrete Req'd: 16.0 cf Dollar General RG 16.0 sf 378.0 376.0 Date: 2/9/2022 Date: Date: (Water Displaced - Top c (Unit WT of Concrete = 1 Volume Provided: 69.5 cf (4'x4' riser x 2.0' = 32cf, )f Pond to Bottom of Pond) 150 pcf) 5'x5' footing x 1.5'=37.5cf) Calculate Skimmer Size Basin Volume in Cubic Feet 11,864 Cu.Ft Skimmer Size 2.5 Inch Days to Drain* 3 Days Orifice Radius 1.0 Inch[es] Orifice Diameter 2.0 Inch[es] •in NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet 120 55 Feet VOLUME 1IS 4, Cu. Ft. Bottom dimensions in feet 112 47 Feet Depth in feet 2 Feet 1/28/22, 2:16 PM ECMDS 7.0 NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > Temporary Ditch #1 Name Temporary Ditch #1 Discharge 7.6 Channel Slope 0.005 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Silt Loam (SM) DS75 Phase I Reach DS75 Straight Unvegetated Underlying Straight Substrate North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 ' Normal Permissible Calculated l Safety Staple Discharge Velocity Depth Mann ings N Shear Stress Shear Stress 1111 Factor Remarks J Pattern 7.6 cfs 2.03 ft/s 1.14 ft 0.037 1.6 Ibs/ft2 0.36 Ibs/ft2 4.5 STABLE D 7.6 cfs 2.03 ft/s 1.14 ft 0.037 1.17 Ibs/ft2 0.19 Ibs/ft2 6.13 STABLE D https:Hecmds.com/project/139235/chan nel-analysis/207593/show 1 /1