HomeMy WebLinkAboutSW5220102_Plansheet C921, C931-932 - Misc. Detail_20220428POURED
(,.nNr.RF
CABC STONE COMPACTED
TO 100% OF MAXIMUM
co
LABORATORY DRY DENSITY
(ASTM D 1557 OR AASHTO
T 180)
COMPACTED
SUBGRADE TO MINIMUM 98%
OF THE MAXIMUM DRY
DENSITY USING THE
STANDARD PROCTOR TEST
D2.01 TYPICAL GRAVEL CROSS SECTION
NOT TO SCALE
RECEPTICLE
D2.04 DOUBLE CHAIN LINK SWING GATE 7.4' 21.14'
NOT TO SCALE
POSITION B
60' POSITION A
13.7'
MIN \
P.V.MODULES \
PROPOSED
I
\ / 60' l
/ I MO / ION RANGE OF
I,
PILES SIZE TO BE W18xW10 GRASS GROUND COVER
OR WBXW18 (REFER TO N
STRUCTURAL PLANS)
/PILES (DEPTHS VARY)
POLE TO POLE SPACING
(28.54' MIN)
NOTE:
THE PROPOSED RACKING ASSEMBLY IS A TRACKING SYSTEM AND WILL
ROTATE THROUGHOUT THE DAY TO FOLLOW THE SUN. THE CLEAR SPACE
BETWEEN PANELS WILL VARY FROM 0.92 - 2.86 TIMES THE PANEL
WIDTH.
GRASS GROUND COVER UNDER ARRAYS TO BE PLANTED WITH A MIX OF
WARM AND COOL -SEASON GRASS SEED.
MAINTENANCE:
GRASS GROUND COVER SHALL BE RE -SEEDED AS NEEDED.
USE OF FERTILIZERS SHALL BE LIMITED TO THE MINIMUM AMOUNT
REQUIRED TO MAINTAIN VEIGE)TATCD%CALE
USE OF HERBICIDES SHALL BE LIMITED TO THE MINIMUM AMOUNT
REQUIRED FOR WEED CONTROL
D2.02 SOLAR RACKING (ELEVATION VIEW)
12 � � 10� � 12
HEIGHT
MESH
GAGE
SELVAGE
FINISH
FABRIC
8>
F. K.
GALV
FRAMEWORK
O.D.
WALL
WT. PER FT.
LENGTH
END/CORNER POST
3"
0.160
4.64
11'
LINE POST
2 1/2"
0.130
3.12
10.5'
RAILS
1 5/8"
0.111
1,84
21'
GATE FRAME
1 5/8"
0.111
1.84
VARIES
GATE POST
4"
0.160
6.56
11'
D2.03
FIXED KNOT FENCE DETAIL
TENSION WIIRE #7 GA.
TOP & BOTTOM GALV.
POST CAP
BRACE RAIL GALV.
1 5/8" LG40
TENSION BAND 15"
ON CTR.
CORNER/END POST
3" LG40 GALV.
TENSION BAR
CHAIN LINK FABRIC
NOTES
SITE DETAILS
j 4 00 �
W co � L�rf
It
M co
N � Lf1
r`
~ � �
W
>
a N N
N N co
N U
Z
LL c0 c0
Z r a
F-Lj Op OG
OZ
J 00 00
W J O`0 ONO
IL W Z Q>
W x
co 2 p LL
N W p LLLL
cflQa
ZQa
33
N
w
co
w
c�
z
Q
U
C7
Z
z W
0 z
� Q o
w z �3
� o
oJ
0 p
U
o Q
W =) m
m
cn
cn W
LLj
OD
N
i
U
W
U)
z
W
U
J
cn
J
W
m
U
z
�Im
01 Z
J
O
0
U
m
O
z
w
a
0
O
0
z
V ♦
cn
cn
J
(Il
U /
W
J
z
m
a
Ld
O
w
W
z
J
w
Q W
w
w
o
Q
V) W
LL
w
z
DRAWN BY: SAK
CDC PROJECT NO.: 12139
XXX PERMIT NO. xxx
SHEET
C921
SLOPE INSTALLATION
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH
WITH APPROXIMATELY 12" (3Ccm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE
BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm) APART IN THE BOTTOM OF THE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (3Ccm)
PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" (3Dcm) APART ACROSS THE WIDTH OF THE BLANKET.
3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES
IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM', STAPLES/STAKES
SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING
ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING
INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH -ON THE PREVIOUSLY INSTALLED BLANKET.
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE
3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (3Ccm) APART ACROSS ENTIRE
BLANKET WIDTH.
NOTE:
*IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO
PROPERLY SECURE THE BLANKETS.
EROSION CONTROL SLOPE MATTING INSTALLATION
NOT TO SCALE
CHANNEL INSTALLATION
12"
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 5" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH
APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET
WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND
COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF
BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES
SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET.
Z. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE
SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING
STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM
, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE
PATTERN.
4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW
OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS.
5.FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES
APPROXIMATELY 12" (3Ccm) APART IN A 5" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH
AFTER STAPLING.
6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND
STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED
ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS.
USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE
CHANNEL.
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm)
APART IN A 6" (15cm) DEEP X 5" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
N OTE:
CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF
A. OVERLAPS AND SEAMS NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL
B. PROJECTED WATER LINE POINTS ALONG THE CHANNEL SURFACE.
C. CHANNEL BOTTOM/SIDE
SLOPE VERTICES ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR
STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE
A A
B B NECESSARY TO PROPERLY ANCHOR THE BLANKETS.
C C
14849 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725
ISA 1-B00-772-2040
caNAOA 1-eoo-aas-zoaa
CONSTRUCTION SEOUENCE
1. CONTACT THE DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO
COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER IS (919) 791-4200.
2. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND CERTIFICATION OF COVERAGE
COC MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR.
3. INSTALL SITE CONSTRUCTION ENTRANCE, TREE PROTECTION FENCE, SILT FENCE OUTLETS
PRIOR TO ANY LAND DISTURBING ACTIVITIES (INCLUDING ANY TREE CLEARING OR
DEMOLITION). CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES AS SPECIFIED ON
THE APPROACH PLAN SHEET. INSTALL ALL OTHER EROSION CONTROL MEASURES AS
REQUIRED BY NCDENR INCLUDING SEDIMENT BASINS, BARRIERS, AND DIVERSION DITCHES
AS NEEDED. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES.
4. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY NCDEQ, INCLUDING SEDIMENT
TRAPS, SILT FENCES BARRIERS AND DIVERSION DITCHES AS NEEDED. MINIMAL CLEARING
AND GRUBBING TO INSTALL PERIMETER MEASURES AND CONVEYANCES WILL BE ALLOWED.
STAGED STABILIZATION ON BARE SOILS OF SLOPES AND OTHER COMPLETE OR INACTIVE
AREAS WILL BE DONE IN A TIMELY MANNER AS OUTLINED UNDER NPDES PERMIT
CONDITIONS.
5. MIN:::W:::GRUBBING TO INSTALL PERIMETER MEASURES AND CONVEYANCES
WILED STABILIZATION OF BARE SOILS OF SLOPES AND OTHER
COAREAS WILL BE DONE IN A TIMELY MANNER.
5. CLEARING AND GRUBBING ONLY NEEDED FOR MINIMUM DESIGN.
7. STABILIZE BANKS AS EARLY AS POSSIBLE.
9. PROCEED WITH GRADING, CLEARING AND GRUBBING.
10. SUBSOIL COMPACTION SHALL BE MINIMIZED. IF COMPACTION OCCURS DURING
CONSTRUCTION, SUBSOIL SHALL BE TILLED AND AMENDED TO RETURN SOIL TO ITS
PRE -COMPACTION CONDITION.
11. CONSTRUCT PROPOSED STORM DRAINAGE SYSTEM.
12. APPLY TEMPORARY AND PERMANENT SEEDING, RIP RAP AND STABILIZATION MEASURES.
13. ALL BASINS SHALL BE MARKED WITH PERMANENT SIGNAGE THAT CORRESPONDS TO THE
BASIN LABELS IN THE APPROVED PLAN.
14. SILT FENCE OUTLETS SHALL BE MARKED WITH SIGNAGE (SUCH AS PAINT ON THE
ADJACENT SILT FENCE) THAT CORRESPONDS TO THE SILT FENCE OUTLET LABELS IN
THE APPROVED PLAN.
15. THE CURRENT VERSION OF THE DEMLR MONITORING FORM IS TO BE USED FOR SELF
INSPECTION OF THIS PROJECT.
6. PERIMETER MEASURES MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS ARE
PERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL
TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE
TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE.
SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPS UNTIL
ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. ALL EROSIONS CONTROL MEASURES
INCLUDING SEDIMENT BASINS MUST BE REMOVED. TEMPORARY DITCHES SHALL BE
REMOVED BY RETURNING DITCH FOOTPRINT TO PRE -CONSTRUCTION GRADES. SEDIMENT
BASINS SHALL BE REMOVED BY COMPLETELY REMOVING EMBANKMENT AND GRADING TO
PROVIDE POSITIVE DRAINAGE. IF DEWATERING IS NECESSARY TO ABANDON SEDIMENT
BASINS, USE PUMP AND DEWATERING BAG.ANY DEWATERING OF THE PROJECT IS TO BE
DONE THROUGH A SILT BAG WITH A FLOATING INTAKE THAT IS CONSTANTLY MONITORED
WHEN IN USE. SEE C934 FOR DETAILS.
17. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT,
CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE
AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACED
IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT.
18. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENT
CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM
FOUND ON THE DEMLR WEBSITE. HTTPS: //FILES.NC.GOV/NCDEQ/ENERGY%2DMINERAL
%20AND%20LAND%20RESOURCES/STORMWATER/NPDES%20GENERAL%20PERMITS/DEMLR
-CSW-MONITORING-FORM-REV-AUGUST- 8-2019.PDF. TWELVE MONTHS OF COMPLETE
INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL
TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX.
19. SELF INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE
PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF
EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE
IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE
MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE
SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING.
20. PERMANENT GROUND COVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER,
NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE.
21. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE CURRENT
NPDES PERMIT OR, IF IT A CRITICAL AREA, BY THE END OF THE DAY.
22. TREES OUTSIDE THE LIMITS OF DISTURBANCE MAY NOT BE REMOVED SO AS TO ALLOW
ADDITIONAL SUNLIGHT TO HIT THE SOLAR PANELS.
23. REMAINING MEASURES MUST BE REMOVED AND RESULTING BARE AREAS STABILIZED
BEFORE PERMIT CAN BE CLOSED.
24. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT
THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT,
VIA INSPECTION REPORT, THE PERMITTEE SHALL VISITDEQ.NC.GOV/NCGO1 TO SUBMIT AN
ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE
WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT.
MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. ALL
N�jEP�S � J W%_Aj %-FIL-NWTM CORDANCE WITH NCDEQ
GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE
WITH REQUIREMENTS OF NCDEQ. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED
WITH FOR ALL WORK.
1. OBTAIN PROVISIONAL PERMIT.
2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED.
3. OBTAIN GRADING PERMIT THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF NCDEQ.
4. PROCEED WITH GRADING, CLEARING, AND GRUBBING.
5. SEED AND MULCH DENUDED AREA WITHIN EITHER 7 CALENDAR DAYS (SLOPES GREATER THAN 3:1)
OR 14 CALENDAR DAYS (3:1 OR FLATTER). AFTER FINISHED GRADE ARE ESTABLISHED, TEMPORARY
SEEDING AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING
RATES PER ACRE.
LIME PER SOIL TEST
FERTILIZER (10-10-10) PER SOIL TEST
STRAW MULCH 4,000 LBS
FOR LATE WINTER/EARLY SPRING SEEDING ADD TO THE ABOVE:
RYE GRAIN 12D LBS
ANNUAL LESPEDEZA 50 LBS (OMIT IF COVER IS NOT TO EXTEND BEYOND JUNE)
FOR SUMMER SEEDING ADD:
GERMAN MILLET 40 LBS
FOR FALL ADD:
RYE GRAIN 120 LBS
IF HYDROSEEDING IS USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW MULCH AT THE
RATE OF 1,000 LBS PER ACRE.
6. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
7. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREA.
8. REQUEST FINAL APPROVAL BY NCDEQ.
3
3
1) GROUND STABILIZATION
SITE AREA DESCRIPTION
STABILIZATION
STABILIZATION TIME
TIME FRAME
FRAME EXCEPTIONS
PERIMETER DIKES, SWALES,
7 DAYS
NONE
DITCHES, AND SLOPES
HIGH QUALITY WATER (HQW) ZONES
7 DAYS
NONE
SLOPES GREATER THAN 3:1
7 DAYS
IF SLOPES ARE 10' OR
LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR FLATTER
14 DAYS
7-DAYS FOR SLOPES
GREATER THAT 50' IN LENGTH
ALL OTHER AREAS WITH
14 DAYS
NONE (EXCEPT FOR
SLOPES FLATTER THAN 4:1
PERIMETERS AND
HQW ZONES)
*EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON
WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE.
(SECTION II.B(2)(B))
2) BUILDING WASTE HANDLING
• NO PAINT OR LIQUID WASTE IN STREAM OR STORM DRAINS.
• DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER
WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND
STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE.
• EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM
STORM DRAINS AND STREAMS UNLESS NO REASONABLE
ALTERNATIVES AVAILABLE.
• CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT
WITH SURFACE WATERS, WETLANDS, OR BUFFERS.
3) DISCHARGES TO FEDERALLY -LISTED WATERS
• REQUIREMENTS ARE THE SAME AS IN PREVIOUS PERMIT.
• THE PERMIT ALLOWS REDUCTION FROM THE 20 ACRE MINIMUM IF
THE DIRECTOR OF DWQ DETERMINES THAT OTHER BMPS PROVIDE
EQUIVALENT PROTECTION.
4) SELF -INSPECTION REQUIREMENTS
• SAME WEEKLY INSPECTION REQUIREMENTS.
• SAME RAIN GAUGE & INSPECTIONS AFTER 1" RAIN EVENT.
• INSPECTIONS ARE ONLY REQUIRED DURING ESS
HOURS."
• RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE ON -SITE
DURING BUSINESS HOURS UNLESS A SITE -SPECIFIC EXEMPTION IS
APPROVED.
• RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON
REQUEST.
• ELECTRONICALLY -AVAILABLE RECORDS MAY BE SUBSTITUTED
UNDER CERTAIN CONDITIONS.
• ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND
CONDITIONS RECORDED ON NCDEQ SELF -INSPECTION AND
SELF -MONITORING COMBINED FORM LOCATED AT
H TTPS: //DEQ. NC. GOV/ABOUT/DI VI SI ON S/
ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS
5) IMPLEMENTATION OF NEW PERMIT CONDITIONS
• PROJECTS PERMITTED UNDER THE PREVIOUS PERMIT CAN CONTINUE
TO FOLLOW THE PREVIOUSLY -PERMITTED CONDITIONS.
• COMPLETE APPLICATIONS RECEIVED PRIOR TO AUGUST 3, 2011 CAN
FOLLOW CONDITIONS OF APPROVED APPLICATION.
• APPLICATIONS RECEIVED AFTER AUGUST 2, 2011 MUST COMPLY
WITH NEW PERMIT CONDITIONS.
6) CONDITIONS IN EROSION & SEDIMENTATION
CONTROL PLANS
• DESIGNATION ON THE PLANS WHERE 7 AND 14-DAY GROUND
STABILIZATION REQUIREMENTS ON THE NPDES PERMIT APPLY.
• DESIGNATION ON THE PLANS WHERE BASINS THAT COMPLY WITH
THE SURFACE -WITHDRAWAL REQUIREMENTS OF THE NPDES PERMIT
ARE LOCATED.
7) SEDIMENT BASINS
• OUTLET STRUCTURES MUST WITHDRAW FROM BASIN SURFACE
UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE.
• USE ONLY DWQ-APPROVED FLOCCULANTS.
PERMANENT SEEDING MEASURES
ALL PERMANENT MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH
REQUIREMENTS OF NCDENR.
SEEDING MIXTURE:
r
S RATE (LB/ACRE)
ETOP 25
GRASS 10
DGE PEA 10
3
3
N U R S E-P L-AN TS: - - - - - - - - - - - - - - - - - - - -
BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 10 LB/ACRE LITTLE
BLUESTEM. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). IT MAY BE
BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER.
SEEDING DATES:
BEST POSSIBLE
BELOW 2500 FT: AUG. 15 - SEPT. 1 JULY 25 - SEPT 15
MAR. 1 - APR. 1 MAR. 1 - MAY 10
ABOVE 2500 FT: JULY 25 - AUG. 15 JULY 15 - AUG. 30
MAR. 20 - APR. 20 MAR. 5 - MAY 15
COMPLETE SEEDING EARLIER IN FALL, AND START LATER IN SPRING ON NORTH- AND
EAST -FACING SLOPES.
SOIL AMENDMENTS:
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4,000 LB/ACRE (6,000
LBS/ACRE FOR CLAY SOILS) GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE
5-10-10 FERTILIZER.
MULCH:
APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE
MULCHING MATERIAL. ANCHOR MULCH USING MULCH ANCHORING TOOL OR ASPHALT TACK
@400 GAL/ACRE. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. A DISK
WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
MAIN IENANUL:
MOW NO MORE THAN ONCE A YEAR. REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS
FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY.
GENERAL EROSION CONTROL NOTES
1. ALL GRADING AND SOIL EROSION CONTROL MEASURES ON THIS SITE MUST BE AUTHORIZED
BY PERMITS ISSUED BY NCDEQ. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL
LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE
PROJECT TECHNICAL SPECIFICATIONS.
2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED GRADING, EROSION CONTROL,
LAND DISTURBANCE, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN OBTAINED PRIOR
TO BEGINNING CONSTRUCTION.
3. ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND
NCDEQ. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS PRIOR TO BEGINNING
WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS SUBJECT TO UNCOVERING
AND BACKFILLING AT THE CONTRACTOR'S EXPENSE.
4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR.
5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND
ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY
CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS
HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO
CONSTRUCTION.
6. PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK
DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM
CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE
REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS
WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE.
7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE
CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY INC ONE CALL AT
811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72
HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES.
B. EROSION CONTROL IS A FIELD PERFORMANCE BASED ACTIVITY; AND ADDITIONAL SILT
FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE
ADDED IN ADDITION TO THE APPROVED PLAN AS NECESSARY. MEASURES SHOWN CAN AND
SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. CONTRACTOR SHALL
ADD ADDITIONAL MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS.
9. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL
NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES.
10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL
UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A
UTILITY COMPANY PERFORMS THE WORK.
11. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED
ACCORDING TO THE SPECIFICATIONS NOTES IN THE PLANS. SITE STABILIZATION IS A
PERFORMANCE BASED REQUIREMENT, AND THE SITE WILL NOT BE ACCEPTED UNTIL
PERMANENT VEGETATION IS ESTABLISHED TO THE SATISFACTION OF THE ENGINEER.
12. CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN
ACCORDANCE WITH NPDES PERMIT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED
WEEKLY AND AFTER EACH RAINFALL. ALL REPAIRS NECESSARY SHOULD BE MADE
IMMEDIATELY AND IN STRICT ACCORDANCE WITH NCDEQ STANDARDS AND NPDES PERMIT.
CONTRACTOR SHALL SUPPLY THE ENGINEER WITH RECORD OF DEVIATIONS FROM PLANS
FOR PREPARATION OF FINAL RECORD DRAWINGS.
13. ALL SLOPES GREATER THAN 2:1 SLOPE AND OVER 5' IN HEIGHT SHALL BE CERTIFIED BY A
LICENSED PROFESSIONAL AS REQUIRED BY NCDEQ.
14. CONTRACTOR IS REQUIRED TO OBTAIN AND PROVIDE A COPY OF THE EROSION CONTROL
PERMIT FOR ANY OFFSITE BORROW/ SPOIL AREA. CONTRACTOR MUST PROVIDE COPY OF
PERMIT TO NCDEQ INSPECTOR PRIOR TO CONSTRUCTION.
15. IF BORROWED OR WASTE FILL MATERIAL IS GENERATED, AN APPROVED GRADING PERMIT
MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF
ANY LAND DISTURBING ACTIVITY
16. ALL FILL SLOPES SHALL BE COMPACTED FULL DEPTH TO NOT LESS THAN 95% MAXIMUM
DENSITY (STANDARD PROCTOR), SHALL BE PLACED ON A SURFACE CLEARED OF GROWTH
AND DEBRIS, AND BE PROPERLY BENCHED AND DRAINED.
17. ALL FILL MATERIAL, UNLESS A PERMIT FROM NCDEQ DIVISION OF WASTE MANAGEMENT TO
OPERATE A LANDFILL IS ON FILE FOR THE OFFICAL SITE, SHALL BE FREE OF ORGANIC OR
OTHER DEGRADABLE MATERIALS, MASONRY, CONCRETE AND BRICK SIZES EXCEEDING 12
INCHES, AND ANY MATERIALS WHICH COULD CAUSE THE SITE TO BE REGULATED AS A
LANDFILL BY THE STATE OF NORTH CAROLINA.
EROSION CONTROL MAITENANCE NOTES:
1. INSPECT EROSION CONTROL MEASURES ONCE A WEEK AND AFTER EVERY SIGNIFICANT RAINFALL.
CONTRACTOR TO INSPECT MEASURES FOR COMPLIANCE WITH PLANS AND DETAILS; INCLUDING
SEDIMENT ACCUMULATION BEYOND DETAIL ALLOWANCE, AND ALSO DAMAGE OR FAILURE OF
MEASURES.
2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT
AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS.
3. WHEN MEASURES ARE FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING
MEASURE BACK INTO COMPLIANCE WITH PLANS AND DETAILS.
4. IF MEASURES ARE FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES
AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED.
5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE
STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER.
3
EROSION CONTROL
DETAILS
W O
cp
CD W O u7
GO lA
[p
z CO Ln LMnLn
LLJ
~ co a
In
aZNN
N
�'Za�
ZLjE
�w�
W=�
kJs04
In In
Go O L
<0
za
0
za
a
z a
a3
3
N
1n
E
0
U
aL
CL
a 0
U
0
U
V ) a,
Q In
_ a�
MU
.� '(D 0 3
0130 3
3
N
U
w
z
w
U_
J
J
w
0o
U
z
Y Y �
Q Q a
C/I C/I Y
w
U
z
Q
0
ca
z �
o z
E)' Q o
w z
oJ
0 o Q
w o �
o Q :>
w m
= m
� CA
cn w
Ell
Ell
n_
N N N
m N
N �
r o
z
z
J
0
M
�
0
M
z
w
CL
Q
w J
o
=
Lr)
__10
z
z
Q
w
�
u�
0
o
o
1
z
o U)
J
v
o
z
o
Z
m
U
o
�
w
z
w �
w
�
� �
w
~
o
z
Q
o
o
Q
Lu
w
z
LD
CL
DRAWN BY: SAK
CDC PROJECT NO.: 12139
XXx PERMIT NO xxx
SHEET
CHANNEL LINER INSTALLATION
NOT TO SCALE
C931
2'
2
D3.06 PERMANENT DIVERSION DITCH
NOT TO SCALE
2"-3" COARSE
AGGREGATE (SUCH AS
RAILROAD BALLAST)
112„ 0I�.
NOTES:
1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE
TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR
FROM AN EXISTING ROAD.
2. FILTER FABRIC SHALL BE PLACED UNDER, THE ENTRANCE/EXIT AND
SHALL BE MIRAFI 500 OR EQUAL.
3. STONE TO BE 2 - 3 INCH WASHED STONE.
4. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS
OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING
WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
5. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
STREETS MUST BE REMOVED IMMEDIATELY.
6. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT
PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT
SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH
DRAINS INTO AN APPROVED SEDIMENT BASIN
D3.07 STABILIZED CONSTRUCTION ENTRANCE
NOT TO SCALE
TEMPORARY DITCH WITH SC 250 DITCH LINER
I-t
FINISHED GRADE
10'
N
SC250 DITCH LINER
CLASS II RIP RAP
2'
10'
� I
O
NOT TO SCALE
CLASS II RIP RAP DITCH LINER AT 2:1 SIDE SLOPE
OF SEDIMENT BASIN WALL
0
I
N
D3.04
�nin vrni rii Trn rnnnin
STEEL POST
WIRE FENCING
Ix -
I
-II :
u _
410
... T
STEEL POST
WIRE FENCING
CLASS I RIP RAP
#5 WASHED STONE
M Nr2T z
CONCENTRATED FLOW OUTLETS -
D3.03 SILT FENCE
NOT TO SCALE
2
TEMPORARY LINED DIVERSION DITCH
NOT TO SCALE
REFERENCE NCDENR EROSION AND SEDIMENT CONTROL PLANNING
AND DESIGN MANUAL SECTION 6.55 ROCK PIPE INLET PROTECTION
CLASS
RIP RAP
HEADWALL
MIN. 10 GA. LINE
WIRES (TYP)
R' AADX
VARIABLE
AS DIRECTED BY ENGINEER
IN-
i
O >�W�i
�I
WOVEN WIRE
FABRIC
SILT FENCE
FILTER FABRIC
FRONT VIEW
CONSTRUCTION NOTES:
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD
STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER
FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES
NOT EXCEED 24" ABOVE THE GROUND SURFACE. (HIGHER
FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO
CAUSE FAILURE OF THE STRUCTURE.)
3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS
ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID
JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY
FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST
WITH 4' MIN. OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE
MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE
POSTS. EXTEND THE WIRE MESH SUPPORT TO THE
BOTTOM OF THE TRENCH. FASTEN THE WIRE
RENFORCEMENT, THEN THE FABRIC ON THE UPSLOPE SIDE
OF THE FENCE POST. WIRE OR PLASTIC TIES SHOULD
HAVE A MIN. 50 lb TENSILE STRENGTH.
5. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8"
DEEP ALONG THE PROPOSED LINE OF POSTS AND
UPSLOPE FROM THE BARRIER.
6. PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE
OF THE TRENCH.
7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE
FILTER FABRIC AND COMPACT. THOROUGH COMPACTION
OF THE BACKFILL IS CRITICAL TO SILT FENCE
PERFORMANCE.
8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
IETER BERM INC DOT
�57 WASHED STONE
NATURAL GROUND
STEEL POST
-- PLASTIC OR
WIRE TIES (TYP)
MIN. 12-1/2 GA.
INTERMEDIATE
WIRES (TYP)
{ EX. GRADE
STEEL POST
WOVEN WIRE FABRIC
SILT FENCE FILTER FABRIC
0
I
i� _4_ Z _
N � �
Q \>
IIIII '"��,� FILL SLOPE
MATERIALS NOTES:
1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY
WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS
CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS
CONFORMING TO THE REQUIREMENTS IN ASTM D 6461,
WHICH IS SHOWN IN PART IN TABLE 6.62b OF THE
NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL.
2.
SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET
RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM
OF 6 MONTHS OF EXPECTED USUABLE CONSTRUCTION LIFE
AT A TEMPERATURE RANGE OF 0 TO 120•F.
3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33
LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET.
MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO
FACILITATE FASTENING THE FABRIC.
4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER
FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND
A MAXIMUM MESH SPACING OF 6 INCHES.
NOTES:
USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT
EXCEED 1/4 ACRE AND NEVER IN AREAS OF
CONCENTRATED FLOW
* FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED
STONE. AS AN ANCHOR WHEN SILT FENCE IS PROTECTING
CATCH BASIN.
D3.01
PIPE OUTLET TO FLAT AREA
NO WELL-DEFINED CHANNEL
PLAN
SILT FENCE
NOT TO SCALE
PIPE OUTLET TO
WELL-DEFINED CHANNEL
PLAN
10' 10'
O00
FILTER BLANKET FILTER BLANKET
SECTION AA SECTION AA
NOTES:
1. La IS THE LENGTH OF THE RIP RAP APRON.
2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS
24" DEEP IF STONE IS CLASS II)
3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN
ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE
BANK, WHICHEVER IS LESS.
4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP
AND SOIL FOUNDATION.
5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL.
6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD.
ANGULAR AND WELL -GRADED.
7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE
RECEIVING CHANNEL OR SLIGHTLY LOWER.
8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT
THROUGHOUT ITS LENGTH.
9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL.
RIP -RAP APRON
D3.02
NOT TO SCALE
�- EX. GRADE
ANCHOR 12" LONG SKIRT IN
TRENCH 8" DEEP AND 4" WIDE*
SIDE VIEW
EROSION CONTROL
DETAILS
Lu
M coO
w N LO Lf1
a z N N
z0 w a `o
J CO CO
c = 0 LL
a=
a
co
w
0
z
Q
U
C7
z w
o z
m Q O
Li z �3
o_ o
0 o J
0 p <
o Q m
w � m
m
cn
U) w
w
DRAWN BY:
CDC PROJECT NO.
XXX PERMIT NO.
SHEET
O (0 O Lr)
Lu � 7 It
l
co
(n L)
z v a
La iF
w J ONO
cc > W x
(n W z LL
z a a
33
N
LO
OD
OD
N
U
w
U)
z
w
U
J
cn
J
w
m
0
z
�Im
OIz
a
z
J
O
o-
Q
o-
0
z
w
a
0
IE
ca
z
o_
cn
I
J
J
cri
w
J
m
Q
w
z
w
Of
w
a
c�
w
z
SAK
12139
xxx
D3.04A
TEMPORARY RIP RAP LINED DIVERSION DITCH AT
SEDIMENT BASIN ENTRY
ROCK PIPE INLET PROTECTION
D3.OS NOT TO SCALE
C932