Loading...
HomeMy WebLinkAboutSW5220102_Plansheet C921, C931-932 - Misc. Detail_20220428POURED (,.nNr.RF CABC STONE COMPACTED TO 100% OF MAXIMUM co LABORATORY DRY DENSITY (ASTM D 1557 OR AASHTO T 180) COMPACTED SUBGRADE TO MINIMUM 98% OF THE MAXIMUM DRY DENSITY USING THE STANDARD PROCTOR TEST D2.01 TYPICAL GRAVEL CROSS SECTION NOT TO SCALE RECEPTICLE D2.04 DOUBLE CHAIN LINK SWING GATE 7.4' 21.14' NOT TO SCALE POSITION B 60' POSITION A 13.7' MIN \ P.V.MODULES \ PROPOSED I \ / 60' l / I MO / ION RANGE OF I, PILES SIZE TO BE W18xW10 GRASS GROUND COVER OR WBXW18 (REFER TO N STRUCTURAL PLANS) /PILES (DEPTHS VARY) POLE TO POLE SPACING (28.54' MIN) NOTE: THE PROPOSED RACKING ASSEMBLY IS A TRACKING SYSTEM AND WILL ROTATE THROUGHOUT THE DAY TO FOLLOW THE SUN. THE CLEAR SPACE BETWEEN PANELS WILL VARY FROM 0.92 - 2.86 TIMES THE PANEL WIDTH. GRASS GROUND COVER UNDER ARRAYS TO BE PLANTED WITH A MIX OF WARM AND COOL -SEASON GRASS SEED. MAINTENANCE: GRASS GROUND COVER SHALL BE RE -SEEDED AS NEEDED. USE OF FERTILIZERS SHALL BE LIMITED TO THE MINIMUM AMOUNT REQUIRED TO MAINTAIN VEIGE)TATCD%CALE USE OF HERBICIDES SHALL BE LIMITED TO THE MINIMUM AMOUNT REQUIRED FOR WEED CONTROL D2.02 SOLAR RACKING (ELEVATION VIEW) 12 � � 10� � 12 HEIGHT MESH GAGE SELVAGE FINISH FABRIC 8> F. K. GALV FRAMEWORK O.D. WALL WT. PER FT. LENGTH END/CORNER POST 3" 0.160 4.64 11' LINE POST 2 1/2" 0.130 3.12 10.5' RAILS 1 5/8" 0.111 1,84 21' GATE FRAME 1 5/8" 0.111 1.84 VARIES GATE POST 4" 0.160 6.56 11' D2.03 FIXED KNOT FENCE DETAIL TENSION WIIRE #7 GA. TOP & BOTTOM GALV. POST CAP BRACE RAIL GALV. 1 5/8" LG40 TENSION BAND 15" ON CTR. CORNER/END POST 3" LG40 GALV. TENSION BAR CHAIN LINK FABRIC NOTES SITE DETAILS j 4 00 � W co � L�rf It M co N � Lf1 r` ~ � � W > a N N N N co N U Z LL c0 c0 Z r a F-Lj Op OG OZ J 00 00 W J O`0 ONO IL W Z Q> W x co 2 p LL N W p LLLL cflQa ZQa 33 N w co w c� z Q U C7 Z z W 0 z � Q o w z �3 � o oJ 0 p U o Q W =) m m cn cn W LLj OD N i U W U) z W U J cn J W m U z �Im 01 Z J O 0 U m O z w a 0 O 0 z V ♦ cn cn J (Il U / W J z m a Ld O w W z J w Q W w w o Q V) W LL w z DRAWN BY: SAK CDC PROJECT NO.: 12139 XXX PERMIT NO. xxx SHEET C921 SLOPE INSTALLATION 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (3Ccm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (3Ccm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (3Dcm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM', STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH -ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (3Ccm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. EROSION CONTROL SLOPE MATTING INSTALLATION NOT TO SCALE CHANNEL INSTALLATION 12" 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 5" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. Z. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5.FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm) APART IN A 5" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (3Ccm) APART IN A 6" (15cm) DEEP X 5" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. N OTE: CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF A. OVERLAPS AND SEAMS NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL B. PROJECTED WATER LINE POINTS ALONG THE CHANNEL SURFACE. C. CHANNEL BOTTOM/SIDE SLOPE VERTICES ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE A A B B NECESSARY TO PROPERLY ANCHOR THE BLANKETS. C C 14849 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 ISA 1-B00-772-2040 caNAOA 1-eoo-aas-zoaa CONSTRUCTION SEOUENCE 1. CONTACT THE DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER IS (919) 791-4200. 2. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND CERTIFICATION OF COVERAGE COC MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR. 3. INSTALL SITE CONSTRUCTION ENTRANCE, TREE PROTECTION FENCE, SILT FENCE OUTLETS PRIOR TO ANY LAND DISTURBING ACTIVITIES (INCLUDING ANY TREE CLEARING OR DEMOLITION). CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES AS SPECIFIED ON THE APPROACH PLAN SHEET. INSTALL ALL OTHER EROSION CONTROL MEASURES AS REQUIRED BY NCDENR INCLUDING SEDIMENT BASINS, BARRIERS, AND DIVERSION DITCHES AS NEEDED. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY NCDEQ, INCLUDING SEDIMENT TRAPS, SILT FENCES BARRIERS AND DIVERSION DITCHES AS NEEDED. MINIMAL CLEARING AND GRUBBING TO INSTALL PERIMETER MEASURES AND CONVEYANCES WILL BE ALLOWED. STAGED STABILIZATION ON BARE SOILS OF SLOPES AND OTHER COMPLETE OR INACTIVE AREAS WILL BE DONE IN A TIMELY MANNER AS OUTLINED UNDER NPDES PERMIT CONDITIONS. 5. MIN:::W:::GRUBBING TO INSTALL PERIMETER MEASURES AND CONVEYANCES WILED STABILIZATION OF BARE SOILS OF SLOPES AND OTHER COAREAS WILL BE DONE IN A TIMELY MANNER. 5. CLEARING AND GRUBBING ONLY NEEDED FOR MINIMUM DESIGN. 7. STABILIZE BANKS AS EARLY AS POSSIBLE. 9. PROCEED WITH GRADING, CLEARING AND GRUBBING. 10. SUBSOIL COMPACTION SHALL BE MINIMIZED. IF COMPACTION OCCURS DURING CONSTRUCTION, SUBSOIL SHALL BE TILLED AND AMENDED TO RETURN SOIL TO ITS PRE -COMPACTION CONDITION. 11. CONSTRUCT PROPOSED STORM DRAINAGE SYSTEM. 12. APPLY TEMPORARY AND PERMANENT SEEDING, RIP RAP AND STABILIZATION MEASURES. 13. ALL BASINS SHALL BE MARKED WITH PERMANENT SIGNAGE THAT CORRESPONDS TO THE BASIN LABELS IN THE APPROVED PLAN. 14. SILT FENCE OUTLETS SHALL BE MARKED WITH SIGNAGE (SUCH AS PAINT ON THE ADJACENT SILT FENCE) THAT CORRESPONDS TO THE SILT FENCE OUTLET LABELS IN THE APPROVED PLAN. 15. THE CURRENT VERSION OF THE DEMLR MONITORING FORM IS TO BE USED FOR SELF INSPECTION OF THIS PROJECT. 6. PERIMETER MEASURES MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. ALL EROSIONS CONTROL MEASURES INCLUDING SEDIMENT BASINS MUST BE REMOVED. TEMPORARY DITCHES SHALL BE REMOVED BY RETURNING DITCH FOOTPRINT TO PRE -CONSTRUCTION GRADES. SEDIMENT BASINS SHALL BE REMOVED BY COMPLETELY REMOVING EMBANKMENT AND GRADING TO PROVIDE POSITIVE DRAINAGE. IF DEWATERING IS NECESSARY TO ABANDON SEDIMENT BASINS, USE PUMP AND DEWATERING BAG.ANY DEWATERING OF THE PROJECT IS TO BE DONE THROUGH A SILT BAG WITH A FLOATING INTAKE THAT IS CONSTANTLY MONITORED WHEN IN USE. SEE C934 FOR DETAILS. 17. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT. 18. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENT CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE. HTTPS: //FILES.NC.GOV/NCDEQ/ENERGY%2DMINERAL %20AND%20LAND%20RESOURCES/STORMWATER/NPDES%20GENERAL%20PERMITS/DEMLR -CSW-MONITORING-FORM-REV-AUGUST- 8-2019.PDF. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. 19. SELF INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 20. PERMANENT GROUND COVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. 21. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE CURRENT NPDES PERMIT OR, IF IT A CRITICAL AREA, BY THE END OF THE DAY. 22. TREES OUTSIDE THE LIMITS OF DISTURBANCE MAY NOT BE REMOVED SO AS TO ALLOW ADDITIONAL SUNLIGHT TO HIT THE SOLAR PANELS. 23. REMAINING MEASURES MUST BE REMOVED AND RESULTING BARE AREAS STABILIZED BEFORE PERMIT CAN BE CLOSED. 24. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISITDEQ.NC.GOV/NCGO1 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. ALL N�jEP�S � J W%_Aj %-FIL-NWTM CORDANCE WITH NCDEQ GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF NCDEQ. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. OBTAIN PROVISIONAL PERMIT. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED. 3. OBTAIN GRADING PERMIT THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF NCDEQ. 4. PROCEED WITH GRADING, CLEARING, AND GRUBBING. 5. SEED AND MULCH DENUDED AREA WITHIN EITHER 7 CALENDAR DAYS (SLOPES GREATER THAN 3:1) OR 14 CALENDAR DAYS (3:1 OR FLATTER). AFTER FINISHED GRADE ARE ESTABLISHED, TEMPORARY SEEDING AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. LIME PER SOIL TEST FERTILIZER (10-10-10) PER SOIL TEST STRAW MULCH 4,000 LBS FOR LATE WINTER/EARLY SPRING SEEDING ADD TO THE ABOVE: RYE GRAIN 12D LBS ANNUAL LESPEDEZA 50 LBS (OMIT IF COVER IS NOT TO EXTEND BEYOND JUNE) FOR SUMMER SEEDING ADD: GERMAN MILLET 40 LBS FOR FALL ADD: RYE GRAIN 120 LBS IF HYDROSEEDING IS USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. 6. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 7. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREA. 8. REQUEST FINAL APPROVAL BY NCDEQ. 3 3 1) GROUND STABILIZATION SITE AREA DESCRIPTION STABILIZATION STABILIZATION TIME TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES GREATER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7-DAYS FOR SLOPES GREATER THAT 50' IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR SLOPES FLATTER THAN 4:1 PERIMETERS AND HQW ZONES) *EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. (SECTION II.B(2)(B)) 2) BUILDING WASTE HANDLING • NO PAINT OR LIQUID WASTE IN STREAM OR STORM DRAINS. • DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. • EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. • CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 3) DISCHARGES TO FEDERALLY -LISTED WATERS • REQUIREMENTS ARE THE SAME AS IN PREVIOUS PERMIT. • THE PERMIT ALLOWS REDUCTION FROM THE 20 ACRE MINIMUM IF THE DIRECTOR OF DWQ DETERMINES THAT OTHER BMPS PROVIDE EQUIVALENT PROTECTION. 4) SELF -INSPECTION REQUIREMENTS • SAME WEEKLY INSPECTION REQUIREMENTS. • SAME RAIN GAUGE & INSPECTIONS AFTER 1" RAIN EVENT. • INSPECTIONS ARE ONLY REQUIRED DURING ESS HOURS." • RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE ON -SITE DURING BUSINESS HOURS UNLESS A SITE -SPECIFIC EXEMPTION IS APPROVED. • RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. • ELECTRONICALLY -AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. • ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND CONDITIONS RECORDED ON NCDEQ SELF -INSPECTION AND SELF -MONITORING COMBINED FORM LOCATED AT H TTPS: //DEQ. NC. GOV/ABOUT/DI VI SI ON S/ ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS 5) IMPLEMENTATION OF NEW PERMIT CONDITIONS • PROJECTS PERMITTED UNDER THE PREVIOUS PERMIT CAN CONTINUE TO FOLLOW THE PREVIOUSLY -PERMITTED CONDITIONS. • COMPLETE APPLICATIONS RECEIVED PRIOR TO AUGUST 3, 2011 CAN FOLLOW CONDITIONS OF APPROVED APPLICATION. • APPLICATIONS RECEIVED AFTER AUGUST 2, 2011 MUST COMPLY WITH NEW PERMIT CONDITIONS. 6) CONDITIONS IN EROSION & SEDIMENTATION CONTROL PLANS • DESIGNATION ON THE PLANS WHERE 7 AND 14-DAY GROUND STABILIZATION REQUIREMENTS ON THE NPDES PERMIT APPLY. • DESIGNATION ON THE PLANS WHERE BASINS THAT COMPLY WITH THE SURFACE -WITHDRAWAL REQUIREMENTS OF THE NPDES PERMIT ARE LOCATED. 7) SEDIMENT BASINS • OUTLET STRUCTURES MUST WITHDRAW FROM BASIN SURFACE UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE. • USE ONLY DWQ-APPROVED FLOCCULANTS. PERMANENT SEEDING MEASURES ALL PERMANENT MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF NCDENR. SEEDING MIXTURE: r S RATE (LB/ACRE) ETOP 25 GRASS 10 DGE PEA 10 3 3 N U R S E-P L-AN TS: - - - - - - - - - - - - - - - - - - - - BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 10 LB/ACRE LITTLE BLUESTEM. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER. SEEDING DATES: BEST POSSIBLE BELOW 2500 FT: AUG. 15 - SEPT. 1 JULY 25 - SEPT 15 MAR. 1 - APR. 1 MAR. 1 - MAY 10 ABOVE 2500 FT: JULY 25 - AUG. 15 JULY 15 - AUG. 30 MAR. 20 - APR. 20 MAR. 5 - MAY 15 COMPLETE SEEDING EARLIER IN FALL, AND START LATER IN SPRING ON NORTH- AND EAST -FACING SLOPES. SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4,000 LB/ACRE (6,000 LBS/ACRE FOR CLAY SOILS) GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 5-10-10 FERTILIZER. MULCH: APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH USING MULCH ANCHORING TOOL OR ASPHALT TACK @400 GAL/ACRE. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAIN IENANUL: MOW NO MORE THAN ONCE A YEAR. REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. GENERAL EROSION CONTROL NOTES 1. ALL GRADING AND SOIL EROSION CONTROL MEASURES ON THIS SITE MUST BE AUTHORIZED BY PERMITS ISSUED BY NCDEQ. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED GRADING, EROSION CONTROL, LAND DISTURBANCE, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN OBTAINED PRIOR TO BEGINNING CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND NCDEQ. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS PRIOR TO BEGINNING WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS SUBJECT TO UNCOVERING AND BACKFILLING AT THE CONTRACTOR'S EXPENSE. 4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 6. PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY INC ONE CALL AT 811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72 HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES. B. EROSION CONTROL IS A FIELD PERFORMANCE BASED ACTIVITY; AND ADDITIONAL SILT FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE ADDED IN ADDITION TO THE APPROVED PLAN AS NECESSARY. MEASURES SHOWN CAN AND SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. CONTRACTOR SHALL ADD ADDITIONAL MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS. 9. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 11. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS NOTES IN THE PLANS. SITE STABILIZATION IS A PERFORMANCE BASED REQUIREMENT, AND THE SITE WILL NOT BE ACCEPTED UNTIL PERMANENT VEGETATION IS ESTABLISHED TO THE SATISFACTION OF THE ENGINEER. 12. CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN ACCORDANCE WITH NPDES PERMIT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. ALL REPAIRS NECESSARY SHOULD BE MADE IMMEDIATELY AND IN STRICT ACCORDANCE WITH NCDEQ STANDARDS AND NPDES PERMIT. CONTRACTOR SHALL SUPPLY THE ENGINEER WITH RECORD OF DEVIATIONS FROM PLANS FOR PREPARATION OF FINAL RECORD DRAWINGS. 13. ALL SLOPES GREATER THAN 2:1 SLOPE AND OVER 5' IN HEIGHT SHALL BE CERTIFIED BY A LICENSED PROFESSIONAL AS REQUIRED BY NCDEQ. 14. CONTRACTOR IS REQUIRED TO OBTAIN AND PROVIDE A COPY OF THE EROSION CONTROL PERMIT FOR ANY OFFSITE BORROW/ SPOIL AREA. CONTRACTOR MUST PROVIDE COPY OF PERMIT TO NCDEQ INSPECTOR PRIOR TO CONSTRUCTION. 15. IF BORROWED OR WASTE FILL MATERIAL IS GENERATED, AN APPROVED GRADING PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY 16. ALL FILL SLOPES SHALL BE COMPACTED FULL DEPTH TO NOT LESS THAN 95% MAXIMUM DENSITY (STANDARD PROCTOR), SHALL BE PLACED ON A SURFACE CLEARED OF GROWTH AND DEBRIS, AND BE PROPERLY BENCHED AND DRAINED. 17. ALL FILL MATERIAL, UNLESS A PERMIT FROM NCDEQ DIVISION OF WASTE MANAGEMENT TO OPERATE A LANDFILL IS ON FILE FOR THE OFFICAL SITE, SHALL BE FREE OF ORGANIC OR OTHER DEGRADABLE MATERIALS, MASONRY, CONCRETE AND BRICK SIZES EXCEEDING 12 INCHES, AND ANY MATERIALS WHICH COULD CAUSE THE SITE TO BE REGULATED AS A LANDFILL BY THE STATE OF NORTH CAROLINA. EROSION CONTROL MAITENANCE NOTES: 1. INSPECT EROSION CONTROL MEASURES ONCE A WEEK AND AFTER EVERY SIGNIFICANT RAINFALL. CONTRACTOR TO INSPECT MEASURES FOR COMPLIANCE WITH PLANS AND DETAILS; INCLUDING SEDIMENT ACCUMULATION BEYOND DETAIL ALLOWANCE, AND ALSO DAMAGE OR FAILURE OF MEASURES. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. WHEN MEASURES ARE FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING MEASURE BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF MEASURES ARE FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. 3 EROSION CONTROL DETAILS W O cp CD W O u7 GO lA [p z CO Ln LMnLn LLJ ~ co a In aZNN N �'Za� ZLjE �w� W=� kJs04 In In Go O L <0 za 0 za a z a a3 3 N 1n E 0 U aL CL a 0 U 0 U V ) a, Q In _ a� MU .� '(D 0 3 0130 3 3 N U w z w U_ J J w 0o U z Y Y � Q Q a C/I C/I Y w U z Q 0 ca z � o z E)' Q o w z oJ 0 o Q w o � o Q :> w m = m � CA cn w Ell Ell n_ N N N m N N � r o z z J 0 M � 0 M z w CL Q w J o = Lr) __10 z z Q w � u� 0 o o 1 z o U) J v o z o Z m U o � w z w � w � � � w ~ o z Q o o Q Lu w z LD CL DRAWN BY: SAK CDC PROJECT NO.: 12139 XXx PERMIT NO xxx SHEET CHANNEL LINER INSTALLATION NOT TO SCALE C931 2' 2 D3.06 PERMANENT DIVERSION DITCH NOT TO SCALE 2"-3" COARSE AGGREGATE (SUCH AS RAILROAD BALLAST) 112„ 0I�. NOTES: 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. FILTER FABRIC SHALL BE PLACED UNDER, THE ENTRANCE/EXIT AND SHALL BE MIRAFI 500 OR EQUAL. 3. STONE TO BE 2 - 3 INCH WASHED STONE. 4. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 5. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 6. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN D3.07 STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE TEMPORARY DITCH WITH SC 250 DITCH LINER I-t FINISHED GRADE 10' N SC250 DITCH LINER CLASS II RIP RAP 2' 10' � I O NOT TO SCALE CLASS II RIP RAP DITCH LINER AT 2:1 SIDE SLOPE OF SEDIMENT BASIN WALL 0 I N D3.04 �nin vrni rii Trn rnnnin STEEL POST WIRE FENCING Ix - I -II : u _ 410 ... T STEEL POST WIRE FENCING CLASS I RIP RAP #5 WASHED STONE M Nr2T z CONCENTRATED FLOW OUTLETS - D3.03 SILT FENCE NOT TO SCALE 2 TEMPORARY LINED DIVERSION DITCH NOT TO SCALE REFERENCE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.55 ROCK PIPE INLET PROTECTION CLASS RIP RAP HEADWALL MIN. 10 GA. LINE WIRES (TYP) R' AADX VARIABLE AS DIRECTED BY ENGINEER IN- i O >�W�i �I WOVEN WIRE FABRIC SILT FENCE FILTER FABRIC FRONT VIEW CONSTRUCTION NOTES: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24" ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4' MIN. OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE RENFORCEMENT, THEN THE FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC TIES SHOULD HAVE A MIN. 50 lb TENSILE STRENGTH. 5. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 6. PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. IETER BERM INC DOT �57 WASHED STONE NATURAL GROUND STEEL POST -- PLASTIC OR WIRE TIES (TYP) MIN. 12-1/2 GA. INTERMEDIATE WIRES (TYP) { EX. GRADE STEEL POST WOVEN WIRE FABRIC SILT FENCE FILTER FABRIC 0 I i� _4_ Z _ N � � Q \> IIIII '"��,� FILL SLOPE MATERIALS NOTES: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62b OF THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USUABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120•F. 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. NOTES: USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. AS AN ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. D3.01 PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL PLAN SILT FENCE NOT TO SCALE PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN 10' 10' O00 FILTER BLANKET FILTER BLANKET SECTION AA SECTION AA NOTES: 1. La IS THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS 24" DEEP IF STONE IS CLASS II) 3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL. 6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD. ANGULAR AND WELL -GRADED. 7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL. RIP -RAP APRON D3.02 NOT TO SCALE �- EX. GRADE ANCHOR 12" LONG SKIRT IN TRENCH 8" DEEP AND 4" WIDE* SIDE VIEW EROSION CONTROL DETAILS Lu M coO w N LO Lf1 a z N N z0 w a `o J CO CO c = 0 LL a= a co w 0 z Q U C7 z w o z m Q O Li z �3 o_ o 0 o J 0 p < o Q m w � m m cn U) w w DRAWN BY: CDC PROJECT NO. XXX PERMIT NO. SHEET O (0 O Lr) Lu � 7 It l co (n L) z v a La iF w J ONO cc > W x (n W z LL z a a 33 N LO OD OD N U w U) z w U J cn J w m 0 z �Im OIz a z J O o- Q o- 0 z w a 0 IE ca z o_ cn I J J cri w J m Q w z w Of w a c� w z SAK 12139 xxx D3.04A TEMPORARY RIP RAP LINED DIVERSION DITCH AT SEDIMENT BASIN ENTRY ROCK PIPE INLET PROTECTION D3.OS NOT TO SCALE C932