Loading...
HomeMy WebLinkAboutSW5220102_Plansheet - Misc. Detail_20220428 (5). ................... _ -4a+• - DOZER TR CLEAT IMF TO TH IE= SI SHOULD BE SEEDED AND STABILEZED IMMEDIATELY. D3.16 SLOPE TRACKING NOT TO SCALE (T 1 1 D3.17 SOIL STOCKPILE NOT TO SCALE PROPOSED GAP IN SILT FENCE T HIGH POINT TO ALLOW FOR CCESS SOIL STOCKPILE TO BE COVERED WITH A TARP OR TEMPORARY GROUND COVER PER NPDES REQUIREMENT 1. 5' 12" OF NCDOT #5 OR #57 WASHED STONE CLASS B RIPRAP ? NOTE: MAXIMUM 100' SPACING FILTER FABRIC 7 24" MAX. BETWEEN CHECK DAMS EXCEPT ON AT CENTER �oC ROADS GREATER THAN 10% GRADE IN WHICH CASE MAXIMUM SPACING OF 50' 1 4' TO 6' BETWEEN CHECK DAMS IS REQUIRED A B L SECTION A —A STONE CHECK DAM: STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION THE FOLLOWING CRITERIA SHOULD BE USED WHEN DESIGNING A CHECK DAM: — ENSURE THAT THE DRAINAGE AREA ABOVE THE CHECK DAM DOES NOT EXCEED 0.5 ACRES. — KEEP THE MAXIMUM HEIGHT AT 2 FT AT THE CENTER OF THE DAM. — KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES AT NATURAL GROUND ELEVATION. — KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER. FILTER — ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. — STABILIZE OVERFLOW AREAS ALONG THE CHANNEL TO RESIST EROSION CAUSED BY CHECK DAMS. — USE NCDOT CLASS B STONE AND LINE THE UPSTREAM SIDE OF THE DAM WITH NCDOT #5 OR #57 STONE. — KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO AVOID WASHOUTS FROM OVERFLOW AROUND THE DAM. D3.14 STONE CHECK DAM NOT TO SCALE TOP VIEW = SEWN IN NECK DIRTBAG 3 OPENING ACCOMODATES UP TO 4' DISCHARGE LENGTH HOSE NOTES: 1) DIRTBAG TO BE PLACED ON AGGREGATE OR STRAW 2) SEAMS MUST BE HIGH STRENGTH DOUBLE STITCHED 'J' SEAMS 3) SEAM MUST BE TESTED UNDER ASTM D-4884, ACF TEST RESULTS AVAILABLE UPON REQUEST 4) THIS WORK SHALL CONSIST OF FURNISHING, PLACING AND REMOVAL OF ASSOCIATED DEVICE 5) CONTRACTOR IS REQUIRED TO USE A DIRTBAG DB-55 OR APPROVED EQUIVELENT 6) FLOATING INTAKE LOCATED IN THE SKIMMER CELL WILL BE USED CROSS SECTION T DB55 FABRIC PROPERTIES PROPERTY TEST METHOD MARV TENSILE STRENGTH ASTM D-4632 205 LBS ELONGATION ASTM D-4632 50% CBR PUNCTURE ASTM D-6241 525 LBS UV RESISTANCE ASTM D-4355 707 ADS ASTM D-4751 80 US SIEVE PERMITTIVITY I ASTM D-4491 1.4 SEC-1 —d FLOW RATE I ASTM D-4491 90 GPM/SF CORPORA7E OFFICE 2631 CARDWELL ROAD ACF DB55 DIRTBAG RICHMOND, VA 23234 PH: U-448-3636 FOR ADDITIONAL N➢RNAIILN PLEASE CINTACI ACF ENVIRPNNLNTAL 1R i:T r MWWWWACFENVMMENTALUM PH: 8W-448-3636 / WWW,ACFENWIRDNMENTALCNM j C 00 � w 00 � L�rf It M co N L9 L ;1 r ~ 00 It � W > a N N N N U Z LLF c0 c0 Z r a H-Lj Op OG OZ J 00 00 Lu J O`0 ONO a w Z Q> w x co 0LL Nwplai a =a H Z Q a 3 N Lo Y I Y � Q Q (!) Cn Y E 3 3 OD T N w z w U J In J w m U z (n W Z Q S U C7 1. INSPECT DEWATERING BAG ONCE A WEEK AND AFTER EVERY o z SIGNIFICANT RAINFALL. CONTRACTOR TO INSPECT DEWATERING BAG FOR [-- COMPLIANCE WITH PLANS AND DETAILS; INCLUDING SEDIMENT Q o ACCUMULATION BEYOND DETAIL ALLOWANCE, AND ALSO DAMAGE OR o �3 FAILURE OF THE DIRTBAG OR PUMP. Of o o O v 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, 0 CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO o m ANOTHER AREA WITH SEDIMENT CONTROLS. 0 00 cn cn w 3. WHEN DEWATERING BAGS ARE FOUND TO BE DAMAGED, CONTRACTOR TO H- REPAIR IMMEDIATELY TO BRING THE DEWATERING BAG BACK INTO COMPLIANCE WITH PLANS AND DETAILS. w w 4. IF DEWATERING BAGS ARE FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED. N N N N 5. CONTRACTOR TO REMOVE DEWATERING BAGS AND BRING AREA TO N N � GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN o REQUESTED AND RECEIVED FROM PROJECT ENGINEER. `V o H 1.5' 9" MIN. MIN a D3.15 FABRIC A FACE VIEW FLOATING INTAKE PUMP \DEWATERING BAG DEWATERING BAG WITH FLOATING INTAKE EROSION CONTROL DETAILS 0 z o. Aul Jaoo y aoobi oaf _ l o °o J Q U 0 � z w a 0 0 c) = LL 0J Lo O z Q w v� 0 V ♦ I O c� Z O J Q Z m O 3: O W � Z w w � � U) w c� U Q z o 0 Q w Lu z 0 DRAWN BY: SAK CDC PROJECT NO.: 12139 XXX PERMIT NO. xxx SHEET C934