Loading...
HomeMy WebLinkAboutSW5220102_Plansheet - Misc. Detail_20220428 (4)BASIN DIMENSIONS BASIN I.D. SURFACE AREA (SF) WATER DEPTH (FT) TOP OF WATER LENGTH (FT) TOP OF WATER WIDTH (FT) WATER SURFACE ELEV. BASIN BOTTOM ELEV. TOP OF BERM ELEV. BERM WIDTH (FT) SPILLWAY LENGTH (FT) OUTLET RIM INVERT SKIMMER SIZE (IN) SKIMMER ORIFICE DIAMETER (IN) A 23,100 2 220 105 228 226 230 5 44 225.5 4.0 3.4 B I 6,325 2 115 55 223.5 221.5 225.5 5 32 221 4.0 3.0 B2 2,250 2 75 30 223.5 221.5 225.5 5 SEE B 1 SEE B 1 SEE B 1 SEE B I C 20,300 2 290 70 224.5 222.5 226.5 5 44 222 4.0 3.2 D 9,600 2 160 60 235 233 237 5 20 232.5 2.5 2.4 E 11,625 2 155 75 234.5 232.5 236.5 5 36 231.5 3.0 2.6 F 13,200 2 165 80 237 235 239 5 40 235 3.0 2.7 G 1 49200 2 100 42 232 230 234 5 16 229.5 2.0 1.7 G2 10,850 2 155 70 236 234 238 5 32 233 3.0 2.5 H 11,050 2 170 65 226 224 228 5 36 223.5 3.0 2.5 I 20,500 2 205 100 232 230 234 5 44 229.5 4.0 3.2 J 27,900 2 300 93 239 237 241 5 52 236 4.0 3.7 K 22,000 2 220 100 240.5 238.5 242.5 5 44 238 4.0 3.3 L 12,000 2 160 75 232 230 234 5 36 229.5 3.0 2.6 M 38,000 2 380 100 242 240 244 5 56 239 5.0 4.3 N 27,200 2 320 85 241 239 243 5 52 238.5 4.0 3.7 O 12,000 2 160 75 244.5 242.5 246.5 5 36 242.5 3.0 2.6 P 22,000 2 220 100 260 258 262 5 44 257.5 4.0 3.3 Q 6,875 2 125 55 267 265 269 5 24 264 2.5 2.0 R 5,750 2 115 50 220 218 222 5 16 217.5 2.5 1.9 MAINTENANCE NOTES: INSPECT TEMPORARY SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREA. BAFFLE (TYP.) + r + EARTHEN EMBANKMENT + ++ + + 11 11 III 11 II -I - ROPE FOR MAINTENANCE ACCESS + SKIMMER ON RIP RAP PAD-- ++ + II,IIIII SILT FENCE WITH CONCENTRA FLOW OUTLET PROTECTION e 1 RIP RAP OUTLET PROTECTION ++ _ + I -I + + III -I -_ + + + + + IIIIIIIIII ++ +4++ 11 + + + + ++ + TEMPORARY INLET RIP RAP INLET ZONE 25% OF SURFACE AREA FIRST CHAMBER 25% OF SURFACE AREA SECOND CHAMBER 25% OF SURFACE AREA NOTES: OUTLET ZONE 1. POROUS BAFFLE USING JUTE NET BACKED 25% OF SURFACE AREA BY COIR EROSION BLANKET (OR EQUIVALENT). 2. SEE FIGURE 6.65B OF NCDENR MANUAL OUTLET STRUCTURE FOR CROSS SECTION OF POROUS BATTLE. WITH RISER BARREL (SEE DETAIL) D3.os SEDIMENT TRAP / BASIN BAFFLE DETAIL NOT TO SCALE SCH 40 COUPLING CONNECTION (TYP) VENT (TYP) INLET (TYP) PROPOSED NYLON ROPE B (ROPE TO RUN EMBANKMENT TO PROVIDE METHOD TO PULL SKIMMER) m�a m IIIIIII INota][oil SCH 40 SOLID PVC BARREL OR "ARM" SUPPLIED BY USER (TYP) HOSE (TYP) c NOTES: 1. SKIMMER SHOWN IN FLOATING POSITION 2. FAIRCLOTH SKIMMER OR APPROVED EQUIVALENT 3. SKIMMER TO BE REMOVED UPON REMOVAL OF SEDIMENT TRAP 4. COUPLING CONNECTION INTO PROPOSED OUTLET STRUCTURES MUST BE SEALED UPON REMOVAL OF SKIMMER POND SKIMMER DETAIL D3.09 NOT TO SCALE SUPPORT POST, SUPPORT ROPE TO 24" INTO BOTTOM STAKE TO WIRE TO PREVENT OR SIDE SUPPORT WIRE SAGGING /VAA VA //\\N�/VAA/VAA//VA VA//VA D3.10 COIR MESH OR SIMILAR, TRENCHED INTO BOTTOM OR SIDE BAFFLE DETAIL NOT TO SCALE BAFFLE MATERIAL GAUGE GAPING STAPLE 11 LANDS 777 STEEL POST BAFFLE MATERIAL SHOULD BE SECURED TO THE BOTTOM OF THE SIDES AND BASIN USING 12" LANDSCAPE STAPLES 8 7 6 FILTREXX® SILT SOXXTM WORK AREA SECTION VIEW 2" HEADWIDTH WOODEN STAKESPLACED 10' ON CENTER 12" FILTREXX®SILT SOXXTI AREA TO BE PROTECTED 2" HEADWIDTH WOODEN STAKES PLACED 10' O.C. AREA TO BE PROTECTED 5 4 3 2 FILTREXX® PYRAMID STAKING DETAIL (2) 2%2%48+" HARDWO-- STAKES, WRAPPED TOGE- WITH 16 GUAGE WIRE, 1 C 2"x2"x36" HARDWOOD ST 10' O.C., STARTING 5' FR ANGLED STAKES COMPOST SOCK CONNECTION/ATTACHMENT DETAIL B \�\ ASIL'T FSO RX M OVERLAPPING SECT FORM CONNECTION FLOW WORK AREA IN A TOP VIEW NOTES: 1, ALL MATERIAL TO MEET FILTREXX®SPECIFICATIONS. OPENING 2. SILT SOXXTm FILL TO MEET APPLICATION ACCOMODATES UP D3. 1 3 REQUIREMENTS. TO 4' DISCHARGE 3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS HOSE DETERMINED BY ENGINEER. 8 7 6 5 4 iv i in L DIMENSIONS ARE IN INCHES ANGULAR BEND i 2° DRAWN TWO PLACE DECIMAL ± AI5 THREE PLACE DECIMAL ± CHECKED .005 ECD 3 "'NATE STAKING OPTION CLOSED END DATE Irk nrbin do L W 8DD-4Q-361 I W'A.P TENVIR[7VNEVAL.EP1 j C 00 � CO � LLrf W M SO N � r V ~ co In W Ln > a N N N N U� Z z L co eo �z a F- co eo OJ CO tD W J a`0 ONO C. w Z Q> W x CO20LL N W plat cD< ZQ0. 3 N LO co W 0 z Q U C7 Z � Z W o z Q O o_ o 0 O J o � O H L Q m W � m Z m = 0 In (n W B An- o C> ° Jo - - ao - _ - U 8cn w Ln o� _ ;yap cci' ° Ah� �° GR lil B A FOR ADOITIOML rDRKATION PLEASE CWTACT ACF EIRMNKNAL PH MO M3-361 / WVV.PCFEAVIUMENTPL,CW GRADING & EROSION CONTROL DETAILS CID T N T U 4i w U) z w U J N J W m z W H Q ofz J 0 Q 0 0 z Lv IE 0 0 O _ L J z Q W cn � v �M/ / I J o m 0 z O J Q Z m O O Z W Z W W � � ' A W < � Q w W z 0 DRAWN BY: SAK CDC PROJECT NO.: 12139 XXX PERMIT NO. xxx SHEET C933