Loading...
HomeMy WebLinkAboutNC0020290_Report_20220414Russell Fox Mayor Heather Hockaday Town Manager/Attorney of BURAisk Chad Fox �0* y pcEYca ,�0 Town Clerk cARd��cs` Torn of A3urnob%tUe April 8, 2022 Town of Burnsville Public Works Department SOC Quarterly Report For January, 2022-March, 2022 Mr. Landon Davidson, P. G. Regional Office Supervisor Surface Water Protection Section North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Councilors: Judy Buchanan Denise Collier Randy 011is Bill Wheeler 12'" APR 1 3 2022 .� Water Quality Regional Operations Asheville Regional Office SUBJECT: Environmental Management Commission Settlement Agreement Quarterly Status Report Town of Burnsville Collection System NPDES PERMIT NC0020290 and WQCS00143 Dear Mr. Davidson: This Quarterly Report documents the Town of Burnsville Sewer Collection System compliance activities during January, February and March of 2022. The Town has experienced no SSO's during the period of this quarterly report. • Project 3b-OMC Pump Station Flow Reduction The Town has received DEQ approval for the use of remain funding from an SRF loan for the OMC Pump Station Project to fund the installation of an additional pump that will be used to divert flow (approximately 50-70,000 gpd) to the EY Sewer Districts WWTP located East of Burnsville. After significant delays due to supply chain issues the Contractor has informed the Town's project engineers (McGill Associates) that the pump installation will begin the week of April 11, 2022. The Town awaits completion the EYWSD collection system to make a connection from the pump station into that system. • Project 4-Baker's Creek Pump Station Rehabilitation The Town is currently preparing applications for submission at the May 2, 2022 funding cycle of DWI Grants for this project. • Project 5-West Main Sewer Interceptor Improvements The Preliminary Engineering Report was timely submitted and has been approved by DEQ. The Town is awaiting approval of the Environmental Report which is expected in May 2022. Upon favorable review construction grant funding should be available and design, bid and construction should follow in accordance with the Division's timelines. P.O. Box 97 • Burnsville, North Carolina 28714 • Phone (828) 682-2420 • FAX (828) 682-7757 • www.townofburnsville.org • Project 7- Burnsville WWTP Improvements: Funding for this project will come from an allocation of 3 million dollars from Yancey County's direct earmark in the 2021-22 North Carolina State Budget. WithersRavenel Engineering Firm is preparing project scope and budget for submission with the County's application to receive a letter of intent to fund from DWI and move forward with this project. Additional Projects: • The Town in has secured grant funding through Yancey County from Dogwood Health Trust for the GIS mapping of the sewer collection system. That project is underway and is scheduled for completion in the fall of 2022. Additionally the same funding source will be used to complete an update of the 2016 AMP/CIP along with an infrastructure master plan study to evaluate current conditions and capacity of all Town infrastructure and future needs of both the Town and County. After the RFQ process McGill Associates was selected for this project and is currently negotiating terms with Yancey County. • The Town will submit an application for May 2, 2022 DWI grant funding cycle in an effort of securing funding for repair and rehabilitation of the East Main Sewer Interceptor Improvements in an effort to further reduce I&I in the collection system. The Town Council is committed to improving and planning for future maintenance of the collection and treatment systems. The Town is seeking funding to go beyond the scope of this agreement and work diligently towards reducing l&I, rehabilitating facilities and making sure the system as a whole is in compliance with all permits. Please accept this information on behalf of the Town of Burnsville Sewer System. If further information is needed, please do not hesitate to contact me at 828-682-2824 or by email at hhockaday@townofburnsville.org Sincerely, Town of Burnsvill Heather Hockaday042.----' Town Manager cc: Tim Heim, ARO Environmental Specialist Shane Dale, Public Works Director, Town of Burnsville