HomeMy WebLinkAboutNCC221680_ESC Approval Submitted_20220504gn Envelope ID; 59750641-5505.4792-A4A1-259641020680
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH 6AROUNA
EriY✓31INWA l"
March 25, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
WSACC
Attention: Chad VonCannon, Engineering Director
232 Davidson Highway
Concord, North Carolina 28027
RE: Project Name: Rocky River Regional WWTP Expansion DB Phase 3
Project ID: CABAR-2022-072
County: Cabarrus
City: Concord Location: 6400 Breezy Lane
River Basin: Yadkin -Pee -Dee
Stream Classification: Other
Acres Approved: 15.88
Submitted By: Brown and Caldwell
Date Received by LQS: March 03, 2022
Plan Type: New
Dear Mr, VonCannon:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications
Required for Approval are listed on the attached page. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit. After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via
email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST
obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of E 0 East
toe talme Quality i Duite 30: f W. oo . Mineral and Land Resoura 2811ces
Mooresville Regional Office; 60 East Center Avenue, Suite 30: 1 1�Iooresvtlle. North Carolina 2$1 l5
704-663-1699
DocuSign Envelope ID: 59750641-5505-4792-A4A1-2F9B41D206B0
Letter of Approval with Modifications
WSACC
March 25, 2022
Page 2 of 3
The NCGOI permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this
land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
Dmuftmd by;
42CFA8FC6WC454.
Zahid Khan
Regional Engineer
Land Quality Section
KSLlcys
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
cc: Brown and Caldwell
Attention: George Anipsitakis
309 East Morehead Street, Suite 160
Charlotte, North Carolina 28202
..sign Envelope ID: 59750641-5505-4792-A4A4-2F9B41D206B0
Letter of Approval with Modifications
WSACC
March 25, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Rocky River Regional WWTP Expansion DB Phase 3
Project ID: CABAR-2022-072
County: Cabarrus
Reviewed by: Kenny S. Llywelyn
1. Temporary diversion ditches designed to direct clean water entering the site to an area off -site must be
stabilized immediately after installation with sod and riprap. Address their installation early within the
construction sequence. [ 15A NCAC .0106(a)(4)].
2. Concrete washout location needs to be shown on the plans. Concrete washout needs to be located outside
the 100-year flood plain.
3. Additional measures may be required - The applicant is responsible for the control of sediment on -site.
If the approved erosion and sedimentation control measures prove insufficient, the applicant must take
those additional steps necessary to stop sediment from leaving this site. [ 15A NCAC 4B .0115]