HomeMy WebLinkAboutNCC221711_NOI Signed Certification_20220503NCG01 Notice of Intent (NOI) Certification Form
Directions:
Print this form, complete, scan and upload to the electronic NOI.
Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 6w Floor (Office 640K)
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN ACCEPTED AS COMPLETE.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.221
Per NC General Statute 143-215.6B (1), any person who knowingly makes any false statement, representation, or
certification in any application, record, report, plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fne not to
exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that (check all boxes to indicate your agreement):
❑✓ I am the person responsible for the construction activities of this project, for satisfying the requirements of this
permit, and for any civil or criminal penalties incurred due to violations of this permit.
❑✓ The information submitted in this NDI is, to the best of my knowledge and belief, true, accurate, and complete
based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information.
�✓ I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control
Plan.
0 If the approved Erosion and Sediment Control Plan is not compliant with Part li (Stormwater Pollution
Prevention Plan) of the NCGO10000 General Permit, I will nonetheless ensure that all conditions of Part it of the
permit are met on the project at all times.
❑✓ I hereby request coverage under the NCGO10000 General Permit and understand that coverage under this
permit will constitute the permit requirements for the discharges) and is enforceable in the same manner as an
individual permit.
Project Name (must match Ala): Union at Tryon, LP
Specific Lot Numbers (must match Alb): NIA
Permittee (must match Bl): Union at Tryon, LP
Legally Responsible Person (must match B2 & B3): Kyle Bach
Title of Legally Responsible Person (must match B3b]: CEO
Name & Title of Signed if Authorized Individual NIA
Differs from Legally Responsible Person:
Phone Number:
� 4/28/22
Signature of Legally Responsible Person or Authorized individual Date
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,
such as a president secretary, treasurer, or vice president, ora manager that is authorized in accordance with Part iV, Section B,
Item (6) of the NCGO10000 permit.