HomeMy WebLinkAboutNC0039446_NOD2021PC0527 & CEI Report_20211215
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
December 15, 2021
Allen Burchell
Linville Resorts Inc.
Email: alan@eseeola.com
SUBJECT: NOTICE OF DEFICIENCY
Tracking Number: NOD-2021-PC-0527
Permit No. NC0039446
Linville Resorts WWTP
Avery County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Linville Resorts WWTP on
November 23, 2021. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0039446. A summary of the findings and
comments noted during the inspection are provided in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following deficiency(s) was noted during the inspection:
Inspection Area Description of Deficiency _________________________________________________________________________________________________________________________________________________________________________ Effluent Sampling Flow proportional sampling is not being performed as required. _________________________________________________________________________________________________________________________________________________________________________
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law. To prevent further action, carefully review these deficiencies and address the causes of
non-compliance to prevent the recurrence of similar situations.
If you should have any questions, please do not hesitate to contact Stephanie Williams with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4500.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche, Bobby Rowe (ORC)
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0039446 21/11/23 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Linville Resorts WWTP
11 Linville Ave
Linville NC 28646
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 21/11/23 20/03/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
11:30AM 21/11/23 25/01/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Allen Burchell,PO Box 99 Linville NC 286460099//828-733-4311/8287333227 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Stephanie A Williams DWR/ARO WQ/828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
12/15/2021
12/15/2021
NPDES yr/mo/day
21/11/23
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Stephanie Williams, with the Asheville Regional Office, conducted a Compliance Evaluation Inspection
of the Linville Resorts Wastewater Treatment Plant on November 23, 2021. This inspection was
conducted to determine if the system is being operated and maintained in compliance with permit no.
NC0039446. Bobby Rowe (ORC) was present during the inspection.
The facility consists of a manual influent bar screen followed by an influent pump station and splitter
box. Two-thirds of the flow is directed to a single flow equalization basin that serves trains one and
two, and one-third of the flow is directed to the flow equalization basin that serves train three. The
flow is treated equally between three separate trains that operate in parallel, each consisting of an
aeration basin and clarifier. The flows from trains one and two are chlorinated together and the flow
from train three is chlorinated separately. The flows then combine for simultaneous dechlorination
and discharge into the Linville River. Initially, the plant only consisted of two trains. The third train was
added after the initial build.
The equalization basin contained a moderate amount of grease buildup on the surface. Pumping has
been scheduled to remove the grease.
At the time of the inspection no backup ORC was designated. An operator designation form was
submitted following the inspection.
The following violation was noted during the inspection:
1. Flow proportional sampling is not being performed as required. Composite samples are being
taken on time-based intervals; however, the permit requires flow proportional composite sampling.
NC0039446 17 (Cont.)
Page#2
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
Permit:NC0039446
Inspection Date:11/23/2021
Owner - Facility:
Inspection Type:
Linville Resorts WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
The current permit expires on 1/31/2025.Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Parameters analyzed include DO, pH, temperature, and settleability.Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Page#3
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
Permit:NC0039446
Inspection Date:11/23/2021
Owner - Facility:
Inspection Type:
Linville Resorts WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
The floats had a moderate buildup of grease and should be kept clean to maintain
proper function.
Comment:
Equalization Basins Yes No NA NE
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Page#4
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
Permit:NC0039446
Inspection Date:11/23/2021
Owner - Facility:
Inspection Type:
Linville Resorts WWTP
Compliance Evaluation
Equalization Basins Yes No NA NE
There was moderate grease buildup in the EQ basins. See summary for details.Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
The 30-minute settleability was measured at 57% in aeration basin 1 and 58% in
aeration basin 2.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Clarifier 2 had a 5-foot blanket and 6 feet of clear supernatant in a 14-foot clarifier.
Clarifier 3 had a 6-foot blanket and 1.5 feet of clear supernatant in an 11-foot clarifier.
Comment:
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?3
Page#5
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
Permit:NC0039446
Inspection Date:11/23/2021
Owner - Facility:
Inspection Type:
Linville Resorts WWTP
Compliance Evaluation
Disinfection-Tablet Yes No NA NE
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Comment:
De-chlorination Yes No NA NE
Type of system ?Liquid
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Number of tubes in use?
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Page#6
DocuSign Envelope ID: 230AC052-01FD-45F6-9330-8B201EED009E
Permit:NC0039446
Inspection Date:11/23/2021
Owner - Facility:
Inspection Type:
Linville Resorts WWTP
Compliance Evaluation
Effluent Sampling Yes No NA NE
Flow proportional sampling is not being performed as required. See summary for
details.
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Page#7