HomeMy WebLinkAboutNC0025321_SOC - June 2021 Quarterly Report_20220414June 2021 Quarterly report as required by the SOC section 2 (b) 8. This quarter we had a few operational concerns. Our belt filter press was down for the entire month of march due to a bearing failure. This made it impossible to get rid of sludge out of the system that was already stressed. AMCI replaced the broken bearings but there were a few weeks lead time in getting the bearings on site and getting the project on the calendar. There also were several electrical issues with the belt filter press during this time. Acorn electrical has been tasked with replacing the existing electric feed panel for the press. The panel is currently in the build process and is scheduled for install as soon as the panel is finished. This should fix most of the electrical problems with the press. The first phase of the digester rehab was completed in mid -May, and we are currently filling the digester taking some stress off the plant. This has increased the plants sludge holding capacity. The next phase of the rehab when budget allows is to add aeration to the digester. We have had several parts of the plant soil tested for compaction and ground stability for the new plant upgrades.