HomeMy WebLinkAbout20030570 Ver 5_Certification of Completion_20140501Environmental Consultants,
8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone (919) 846 -5900
sandec com
April 28, 2014
S &EC Project # 10783.P12
NC Department of Environment & Natural Resources
Division of Water Resources
401 & Buffer Permitting Unit
Archdale Building -9th floor
512 N Salisbury Street
Raleigh, NC 27604
Re. Certificate of Completion
Ligon Mill Extension, Ligon Mill Sanitary Sewer Extension & Ligon
Mill Extension -Level Spreaders 2 & 3
DWQ Project #2003- 0570v3, 2003- 0570v4 & 2003- 0570v5
Wake Forest, Wake County, NC
To Whom It May Concern:
As required by the conditions of the 401 Water Quality Certification Approval &
the Authorization Certificate per the Neuse Basin Riparian Buffer Protection
Rules, please see the completed Certificate of Completion for the projects
associated with Ligon Mill Extension (see subject projects).
Sincerely,
SOIL & ENVIRONMENTAL CONSULTANTS, PA
[Db6Vk___ S &"Z)1_
Deborah E. Shirley
Environmental Specialist
CC.
Mr. Brian Mountcastle
Attachments.
1) Certificate of Completion
F 2014
dA.,...,W.6W Branch
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A Reeder John E Skvada, III
Governor Director Secretary
DWR Project No: 2003- 0570v3 -v5
Applicant: Weingarten Investments, Inc.
County: Wake
Project Name: Ligon Mill Rd. Extension, Ligon Mill Sanitary Sewer Extension & Ligon Mill
Extension -Level Spreaders 2 & 3
401 Water Quality Certification Issued Date: 05/12/09, 12/19/11 & 07/15/13
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, e ' „ A,av%- , hereby state that, to the best of my abilities, due care and
diligence was used in the observaf on of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials. l
Signature: Date:
Agent's CeCfk6t1lon
1, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials
Signature- Date:
If this project was designed by a Certified Professional
I, ' as a duly registered Professional (i e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
4018 Buffer Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699 -1650
Locaeon 512 N Salisbury St. Raleigh, North Carolina 27604
Phone 919. 807.6300 %FAX 919- 807.6494
Internet www.rimaterouality oro
An Equal Opportunity Afimiatwe Action Employer