Loading...
HomeMy WebLinkAboutNCC221679_ESC Approval Submitted_20220501Notice0 : It is a direct violation of your approved plan to initiate any land disturbing activities PRIOR to holding a scheduled Pre -Construction Conference (Pre -Con). To prepare for this Pre -Con follow these steps: 1. Complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC under the NCG010000 Construction Stormwater General Permit. See attached approval letter for link to apply. 2. Receive your COC within 3 business days from DEMLR. (Email a copy of the COC to Danielle Rudisill: drudisill aAlincolncounty.org ) 3. Contact our office at 704-736-8501 to schedule your Pre -Construction Conference prior to any land disturbance. (A pre -con cannot be scheduled without first obtaining a COC from DEMLR) Your copy of the approved plan and grading certificate will be delivered to you and/or your grader onsite at the meeting. SOIL EROSION and SEDIMENTATION CONTROL Lincoln County Natural Resources Department NATO115 West Main Street, Lincolnton, INC 28092 704-736-8501 Fax: 704-736-8504 RCSOURC[5 LETTER OF APPROVAL (WITH SECONDARY ATTACHMENT 1a) Project Name: Hwy. 73 Flex Building Submitted By: J. David Ledford, RLA Project ID #: 22-COM-08 Date received by LCNRD: 4/21/22 Location: Hwy. 73, iron Station, NC 28080 Plan Type: Commercial Watershed: Catawba River Basin Acres Approved: 3.2 acres Contact Office to Schedule Pre -Construction Conference Prior to Any Land Disturbance Date: 4/28/22 JCK Properties, LLC c/o Jimmy Pressley, Jr. 484 Countrytyme Lane Iron Station, NC 28080 Dear Mr. Jimmy Pressley, This office has reviewed the subject Soil Erosion and Sedimentation Control Plan. We find the plan to be acceptable and hereby issue this Letter of Plan Approval. If any modifications or recommendations are applicable, a list is enclosed and incorporated as a part of this letter of approval. If any modifications are not incorporated into the plan and implemented in the field, the site will be in violation of the Soil Erosion and Sedimentation Control Ordinance of Lincoln County. This plan approval shall expire two (2) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 9(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deg.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) and Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 11(f) of our right of periodic inspection to insure compliance with the approved plan. Lincoln County's Soil Erosion and Sedimentation Control Ordinance is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the Soil Erosion and Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66) and Lincoln County Soil Erosion and Sedimentation Control Ordinance Section 9(d), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated and we look forward to working with you on this project. If there are any questions, please do not hesitate to contact this office at the above number. S" cerel , Ile T. Rudisill, CPESC Erosion and Sedimentation Control Administrator Lincoln County Soil and Water Conservation District Natural Resources: Soil Erosion and Sedimentation Control SOIL EROSION and SEDIMENTATION CONTROL Lincoln County Natural Resources Department RcATUR Ls 115 West Main Street, Lincolnton, NC 28092 704-736-8501 Fax: 704-736-8504 SOU ATTACHMENT 1a Project Name: Hwy 73 Flex Building Submitted By: J. David Ledford, RLA Project ID 4: 22-COM-08 Date received by LCNRD: 4/21/22 Location: Flwy 73, Iron Station, NC 28080 Plan Type: Commercial Watershed: Catawba River Basin Acres Approved: 3.2 acres Contact Office to Schedule Pre -Construction Conference Prior to Any Land Disturbance Date: 4/28/22 Additional Note for Construction Process: There is a residential power service line that crosses the property from the road frontage to the neighboring lot at the rear of the project site. Financially responsible party is in communication with the power company to address this line. No land clearing is to be completed within the right of way for this line until the power company renders a plan of action for relocating this line. This is not a major transmission line. The only work to be completed until written authorization of land disturbance is received OR removal of power line is completed is basic land disturbance to access the property for Environmental Health to complete their perk tests and initial septic investigations. Lincoln County Natural Resources staff to authorize next step of disturbance once power line information is received.