Loading...
HomeMy WebLinkAbout20140385 Ver 1_Approval Letter_20140425F4 Rc DENR fEnvironment and Natural Resources, North Carolina, Department o Pat, McCrory J-6hn E. Skvarla, III Govemor 8ectetary April 2.5,2014, I)WR4 14-0385, Durham ,County Satterwhite, Construction ,Inc. Attn: Jesse Satterwhite 5533'Farmwoll'Rd. Ral'eigh,NC 27610, 'A Subject: AVTHORIZATION CERTIFICATE PERTHE'NEUSE RIVER BASIN RIPARI, N BUFFER PROTECTION RULES (15A NCAC,02B.02,93) WITH, ADDITIONAL CONDITIONS Mulberry Park , 'Dear Mr,.�Safterwhite:- - You have -oval forlhe impacts listed below for the, purpose described - in yo6riopoliption ,pve our approval ,dated Airil15, 20144and received Eby the Division, of Water �Resourc6s, (Divislon) ofi*'April 15', 2614; April Please hotethat you should get any other federal, state or local peifthiltsbeforelpr ceeding with your,projectjncludl g those, required 6y,(but-Inbt,,lihiited,to),Sediment an,d,'Erosion Control,'Non-, Discharge, and Water Supply Watershed regulations.,,This Authoriiatidn Certificate shall,eipire five" 15) Vear-sirom theApte ofthfs,,�Iettee.. This,approv 61, reouires,youto comply with the followih�gxonditidhs: 1. The,following impacts are, hereby approved'proyided'that all of the other Mpecific'and general conditions ofthp Buffer Rules are met. 'No other.impActs are approved, including,incidenta.1 impacts. Type of'Impact.• AmountApproved Amount Approved (units) (units) Permanent Temporary Buffers — Zone i 600 (square .-feet) (5q4ate,feet) Buffers — Zone 2 400 (square feetJ 0 (square, feet) One No Caro •orth,Ckohna,Division of WaterResources 1628,Mail'Servi6c Center Meigk NC'27604628 Phone,(919),791-4200 Custoffier,,Samoe, Interhet newaterquality.org Location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788'7159 1-877-623-6748 VVWW - An Equal OpportbinitylAorm6five Action Employer — 60% Recycled/1 0% Post Consumer Paper Mulberry Park,` DWR# 14 -0385 - BUFFER,APPROVAL Page.2 of 3 2: 'No'Waste, Spoil,,5olids; or Fill of Anv_ Kind ,No waste, spoil, solids, or-fill of any kind shall' occur in. Wetlands, waters, orripanan,areas beyond the footprint of the ,impacts depicted, in the Pre- Construction Notification. All, construction activities, includingfhe design, installation, operation, And, maintenance of sediment and ierosion control Best Management Practices,,-shall be performed.so that.no, violations of state water quality standards, statutes, or,rules occur. - ,3: Protective, Fencing - The,outs de buffer, wetland' or water boundary and along-the constructiori corridor- within, these boundaries approved' under this:authorization shall be.clearly�marked with orange._ warning fencing (or,similar high'visib'ility material) forthe areas that have been apprdved'to infringe within the buffet, wetland or water'prior to any land disturbing,activities to ensure, compliance with'15 NCAC 02H .0500. 4. This approval'is,for the- purpose and design described in your,application, The, plans and - specifications for this,project are incorporated by reference as part of the Buffer Authorization. .If yob change your.project, you must notify the Division and you.may be required to _submit a new,application package with the appropriate fee. If the property is sold, the,new owner must be given,a copy'of this approval letter and is responsible for,comply',ingtyith_ all conditions. 5. Thi" s`approvafand'its'eonditionsare fin alL and'binding unless contested. This Buffer Authorization can be contested as provided'in Articles,3 and 4 of'General Statute 150B by filing a written, petition for•an administrative. heating to the'Offi'ce� of Administrative Hearings. (hereby ,known, as OAH). A petition form may be•obtained from'the, OAH at htto: / /www.ncoah:com/ o,r,'by calling the -OOH, Clerk's Office at (919) 431 -3000 for information. 'Within thirty (30)val6ndardays of'receipt of°this,notice, a,petition must'be filed with'the,OAH. A• ;petition is considered filed' When the original' and one (1) copy along`with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding-official state holidays). The petition may be faxed to the'OAH;at (919) 43,1 -3100, provided the or'igi'nal and one, copy �of the petition alongwith any,applicable OAH filingfee is received{by'the OAH within five,(5),business days following the faxed "transmission: Mailing, address for the, OAH: if sending by First Class Mail via the 'US Postal Service: 7f sending via de'li.ve --y service (g.4- UPS, FedEx): Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Mulberry Park DWR# 14 -0385 BUFFER APPROVAL Page 3 of 3 Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 Please send one (1) copy of the petition to DWQ: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DENR -DWR — Webscape Unit 1650 Mail Service Center . Raleigh, NC 27699 -1650 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DENR -DWR — Webscape Unit 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in 15A NCAC 02B.0233. Please contact Cherri Smith at 919 - 791 -4251 or cherri.smith(@ncdenr.gov if you have any questions or concerns. Si ly, Danny Smit Supervisor, Water Quality Regional Operations Section cc: DWR RRO 401 files Nichole Thomson; SEPI Engineering & Construction; 1025 Wade Ave.; Raleigh, NC 27605