HomeMy WebLinkAboutWI0501030_Correspondence_20220314wood.
March 8, 2022
Mr. Michael Rogers
NC Department of Environment Quality
Division of Water Resources, Underground Injection Control (UIC) Permit
1636 Mail Service Center
Raleigh, NC 27699
Reference: 2021 MONITORED NATURAL ATTENUATION GROUNDWATER MONITORING
REPORT
FORMER GUILFORD MILLS FACILITY
200 DICKENS ROAD, FUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA
SITE ID NO. NONCD 0001064
UIC PERMIT NO. WI0501030
Dear Mr. Rogers:
On behalf of Lear Corporation (Lear), Wood Environment & Infrastructure Solutions, Inc. (Wood)
respectfully submits to the North Carolina Department of Environmental Quality (NCDEQ) this
2021 Monitored Natural Attenuation Groundwater Monitoring Report to summarize the 2021
groundwater sampling and well abandonment activities performed at the Former Guilford Mills
Facility (the Site).
If you have questions regarding this Report, please contact Ms. Bonani Langan at (919) 564-9999
or via email at bonani.langan@woodplc.com at your convenience.
Sincerely,
Wood Environment & Infrastructure Solutions, Inc.
Digitally signed by
l 0. �` Vandana.Muddu
V { Date: 2022.03.08
15:12:57 -05'00'
Digitally signed by
fejt oft t, ,& L , _ bonani.langan
�" '� Date: 2022.03.08
15:13:30 -05'00'
Vandana Muddu Bonani Langan, PE, RSM
Senior 1 Professional, Environmental Senior Associate Engineer, Project Manager
Attachments
cc: Mr. Avtar Mavi — Lear Corporation
Mr. Keith Snavely - Division of Waste Management, Inactive Hazardous Sites Branch
Wood Environment & Infrastructure Solutions, Inc.
4021 Stirrup Creek Drive, Suite 100
Durham, North Carolina 27703
Tel: (919) 381-9900 / Fax: (919) 381-9901
www.woodplc.com
Licensure: NC Engineering F-1253 / NC Geology C-247