Loading...
HomeMy WebLinkAbout20220450 Ver 1_Mitigation Site Visit_20220331From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RE: Falcon Ridge - New Prospectus UMBI Yadkin 03, Randolph County, SAW-2022-00424 Date: Friday, April 29, 2022 9:57:29 AM Attachments: Falcon Ridge Prospectus Site Visit Memo.pdf Figure 8 - Conceptual Design - Falcon Ridge 20220330.pdf Laserfiche Upload: Email & Attachment DWR#: 20220450 v.1 Doc Type: Mitigation Site Visit From: Patrick Korn <pkorn@res.us> Sent: Thursday, March 31, 2022 11:54 AM To: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Merritt, Katie <katie.merritt@ncdenr.gov>; kathryn_matthews@fws.gov; Bradley Breslow <bbreslow@res.us>; Jamey Mceachran <jceachran@res.us>; Bowers, Todd <bowers.todd@epa.gov> Subject: [External] RE: Falcon Ridge - New Prospectus UMBI Yadkin 03, Randolph County, SAW-2022- 00424 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning all, I hope this message finds you well. Attached are the meeting minutes from the site visit on the 16th and an updated concept with the reach changes we discussed incorporated. We will update the prospectus and send back to the USACE. Please do not hesitate to reach out with any questions. Best, Patrick Patrick R. Korn, PWS Project Manager RES I res.us M: 252.347.3224 Restoring a resilient earth for a modern world -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browningla�usace.army.mil> Sent: Thursday, March 10, 2022 1:35 PM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.TugwellCo�usace.army.mil>; erin.davisC@ncdenr.gov; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.HaywoodCa�usace.army.mil>; travis.wilsonco�ncwildlife.org; Munzer, Olivia <olivia.munzerCu�ncwildlife.org>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.DaileyCa�usace.army.mil> Cc: Merritt, Katie <katie.merrittC@ncdenr.gov>; kathryn_matthewsC@fws.gov; Patrick Korn <pkornC@res.us>; Bradley Breslow <bbreslowC@res.us>; Jamey Mceachran <imceachranC@res.us>; bowers.toddC@epa.gov Subject: [EXTERNAL] Falcon Ridge - New Prospectus UMBI Yadkin 03, Randolph County, SAW-2022- 00424 Al I, Attached is the georeferenced map for the RES Falcon Ridge site visit schedule for March 16 in Randolph County. We plan to meet at 9:00 am in front of the covered storage structure at 35.783322,-79.859554. 1 also attached the draft prospectus since RIBITS seems to be having hiccups today. Sam Daily is the bank point of contact for this project if anyone has questions. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1919.946.5107 -----Original Message ----- From: Patrick Korn <pkornC@res.us> Sent: Thursday, February 24, 2022 7:49 AM To: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browningla�usace.army.mil> Cc: Bradley Breslow <bbreslowC@res.us>; Jamey Mceachran <imceachranC@res.us>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.HaywoodCa�usace.army.mil> Subject: [Non-DoD Source] RE: Falcon Ridge - New Prospectus UMBI Yadkin 03 Good morning Kim, I hope your day is off to a great start. Please see attached for the georeferenced concept. The best place to meet is in front of the covered storage structure at 35.783322,-79.859554. Looking forward to coordinating more when we get closer. Best, Patrick -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browningla�usace.army.mil> Sent: Wednesday, February 23, 2022 11:36 AM To: Patrick Korn <pkornC@res.us> Cc: Bradley Breslow <bbreslowC@res.us>; Jamey Mceachran <imceachranC@res.us>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.HaywoodCa�usace.army.mil> Subject: [EXTERNAL] RE: Falcon Ridge - New Prospectus UMBI Yadkin 03 Thanks Patrick. I'll distribute this to the IRT. Prior to the site visit, will you please send a georeferenced PDF of the concept plan map? We'll also need meeting coordinates. We can coordinate a meeting time closer to the 16th. Sam should be back by then and she will manage this bank. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1919.946.5107 -----Original Message ----- From: Patrick Korn <pkornC@res.us> Sent: Wednesday, February 23, 2022 10:32 AM To: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browningla�usace.army.mil> Cc: Bradley Breslow <bbreslowC@res.us>; Jamey Mceachran <imceachranc@res.us> Subject: [URL Verdict: Neutral][Non-DoD Source] Falcon Ridge - New Prospectus UMBI Yadkin 03 Greetings Kim, I hope this message finds you well. Please see the attached Falcon Ridge Draft Prospectus describing a new UMBI in the Yadkin 03, Randolph County. Just a reminder that this is the one that we have a site visit planned on March 16th with the IRT. Please do not hesitate to reach out with any questions or comments. Best Regards, Patrick Patrick R. Korn, PWS Project Manager RES I res.us <Blockedhttp://www.res.us/> M: 252.347.3224 Restoring a resilient earth for a modern world fires MEMORANDUM 3600 Glenwood Avenue, Suite ioo Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 TO: NCIRT FROM: Patrick Korn — RES DATE: March 31, 2022 RE: SAW-2022-00424 - Falcon Ridge UMBI Yadkin 03, Randolph County, Prospectus Site Visit Attendees Kim Browning - USACE Erin Davis — NCDWR Patrick Korn — RES Casey Haywood — USACE Travis Wilson — NCWRC Brad Breslow — RES Todd Tugwell — USACE Olivia Munzer — NCWRC Jeremy Schmid — RES Samantha Dailey — USACE Date & Time 0900 March 16, 2022 General Summary - Site visit was scheduled to discuss draft prospectus submitted February 23, 2022. - RES provided an overview of the site, land use, and project constraints. - Main concern with the site is the amount of work that will need to be done to control the privet. RES will modify reach treatments to account for a more robust privet treatment protocol. - Concern with accumulation of sediments in the old pond bottom located along PRl and wetlands W3, W4. RES will contract a licensed soil scientist to investigate the original surface elevation to help aid in wetland and stream design potential - Preservation wetlands on site will need planting and fescue treatment and treatment will be modified to enhancement. - Existing culverts will be called out and crossings will be added/improved upstream of PR4-A, PR3, and PR2, outside of the easement. These sections are necessary for access because there are no crossings, and these crossings would likely be designed to be fords and or Riffle grade control structures to ensure reach stability. The existing culvert on PR8 will be removed. - Easement boundary will be straightened where appropriate to make long-term stewardship easier. - IRT members agreed that the Falcon Ridge Site is suitable to provide compensatory mitigation and final credit ratios will be determined in the approved Mitigation Plan. Reaches with no Treatment Change Based on discussions in the field, the group agreed that the following reaches had the appropriate treatment/approach in the Prospectus. RES understands that final design approaches and crediting rationale for all reaches must be fully justified in the mitigation plan. - PR1-A - PR1-B1 - PR1-B2 - PR1-C - PR4-A - PR1-D - PR5-B - PR7-C2 - PR7-C 1 - PR7-B - PR7-A 1 res.us fires Reach Specific Comments MIAMI PR2 PR3 3600 Glenwood Avenue, Suite ioo Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 - Erin Davis was concerned the drainage area for this reach was too small and hydrology will be lost when altering the bank. - RES will explore this concern in design. - IRT was concerned that portions of this reach will require an effort closer to restoration to address privet removal and bank stabilization. - RES will refine treatment ratios during the design phase and may even use a blended restoration/enhancement approach ratio of 1.25:1. - RES will adjust this reach from E3 to E2 to account for the amount of privet that is present. PR4-B - RES will adjust this reach from E3 to E2 to account for the amount of privet that is present. PR1-E - RES will modify a portion of this reach (-100 ft) to restoration and E1 from preservation to restore the impacts from the dam removal and treat the privet in the buffer. PR5-A - RES will change this reach to restoration to account for the privet treatment and matching elevations with PR6. - Improvements will also be made to the existing culvert outside of the easement to ensure easement stability. PR6 - RES will change this reach to restoration. - RES will expand the easement to capture all of the headwater wetlands (W 1) located above PR6 PR7-A2 - RES will change this reach to restoration to match elevations with restoration efforts up and downstream and remove fescue from the stream bed, bank, and buffer. Next Steps - RES will make changes to Prospectus and send to USACE for distribution to IRT. - USACE will begin Public Notice Process res.us Reach ID Approach Len th ft Ratio I SMU PR1-A Enhancement 1 278 1.5 185.33-- PR1-B1 Restoration 1,028 1 1,028.00 PR1-B2 Enhancement 1 95 1.5 63.333 PR1-C Enhancement 111 280 5 56.000 PR1-D Restoration 1.288 1 1.288.00 PR2 Blended Restoration/ 595 11.25 I 476.000 Enhancement PR7-A Restoration 1,40 PR7-B Enhancement III 329 PR7-C Restoration 192 PR8 Restoration 409 Wetland Miti ation and ID Approach Area ac Ratio WMU 1 Enhancement 0.46 2 0.230 2 Enhancement 0.30 2 0.148 3 Enhancement 1.30 2 0.651 4 Enhancement 0.86 2 0.431 5 Enhancement 0.03 2 0.015 Total 2.95 1 1.475 Remaining Dam Debris/Culvert To Be Removed (Stream Embankments Stabilized) 489.000 1,408.00 65.800 192.000 409.000 Crossing Crossing r- , Cr Crossing I Old Fencing Posts and WirE Be Removed Throughout '3 Remaining Dam Debris To Be Removed (Stream Embankments Stabilized) Legend PR7-E2 r^, Existing Crossing Proposed Conservation Easement (60.53 ac.) Project Parcel ® Existing Pond ® Propsed Wetland Enhancement W Stream Approach Restoration (1:1) A Blended Restoration/Enhancement (1.25:1) 9 , Enhancement 1 (1.5:1) Enhancement 11 (2.5:1) W2 Enhancement 111 (5:1) 'co, a Preservation (10:1) X� Proposed Fenceline - Culvert to be Removed Existing Dam to be Removed Q Relic Dam " Figure 8 - Conceptual Design Date: 3/31/2022 w Drawn by: EJU Falcon Ridge 5 Mitigation Project Checked by: PK 0 250 500 1 Randolph County, North Carolina Feet inch = soo rest EN 6res l