HomeMy WebLinkAboutNC0003417_2021 Annual Seep Survey Report_20210426 RECEWED/NCDENR/DWR
e& DUKE James Wells
ENERGY Vice President
APR 2 9 2022 Environmental, Health and Safety
Programs&Environmental Sciences
526 South Church Street
Water Quality Charlotte,NC 28202
Regional Operations Section (980)373-9646
Washington Regional Office
April 26, 2021
David May
Washington Regional Supervisor
North Carolina Department of Environmental Quality
Division of Water Resources
943 Washington Square Mall
Washington, NC 27889
Bob Sledge
North Carolina Department of Environmental Quality
Water Quality Permitting Program
Division of Water Resources
1617 Mail Service Center
Raleigh,NC 27699-1617
Subject: Report Under Special Order by Consent—EMC SOC WQ S 18-006
Duke Energy Progress, LLC—H.F. Lee Steam Station
NPDES Permit NC0003417
2021 Annual Seep Survey Report
Dear Messrs. May and Sledge:
On behalf of Duke Energy Progress, LLC (DEP), I am submitting to you the H.F. Lee Steam
Station Annual Seep Survey Report as required by Section 2.b.4 of the subject Special Order by
Consent(SOC).
As required by the SOC, I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry
of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief
true, accurate, and complete. lam aware that there are significant penalties for submitting false
information, including the possibility of f ne and imprisonment for knowing violations.
Messrs. May and Sledge
April 26, 2021
Page 2
Please direct any questions concerning the H.F. Lee Steam Station NPDES Permit NC0003433
SOC No. S19-006 to Shannon Langley at (919) 546-2439 or shannon.langley@duke-
energy.com.
Sincerely,
James Wells
Vice President,Environmental, Health& Safety
Programs and Environmental Sciences
Duke Energy
Attachment
Weatherspoon Steam Station 2021 Annual Seep Survey
CC: Jessica Bednarcik,Duke Energy
Richard Baker,Duke Energy
Joyce Dishmon, Duke Energy
Mike Graham, Duke Energy
Matt Hanchey, Duke Energy
Shannon Langley, Duke Energy
synTerm Science & Engineering Consultants
synterracorp_com
2021 ANNUAL SEEP REPORT
H.F. LEE ENERGY COMPLEX
EMC SOC WQ S18-006
1199 BLACK JACK CHURCH ROAD
GOLDSBORO, NC 27530
APRIL 2022
PREPARED FOR
DUKE
ENERGY
PROGRESS
DUKE ENERGY PROGRESS, LLC
tC1--.' 4
Kathryn W. Webb �,,� y,�� Kelly Ferri
Senior Peer Review •.•`�Q�tr1 CAf{0��",, Project Manager
• •
%/�>CE NSFp�Y9
: SEAL
446
T. c Q. ►�
ytialter Gerald, C L.G. #0446
�''•ll£R ��G� , Senior Hydrogeologist
,�q,4,pp'1',,
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION 1-1
2.0 FINDINGS 2-1
2.1 General Observations 2-1
2.2 Effects of Decanting 2-1
2.3 Changes to Seep Status 2-1
3.0 REFERENCES 3-1
LIST OF FIGURES
Figure 1 Seep Locations and Inspection Area
LIST OF TABLES
Table 1 Seep Locations and Descriptions — August 2021 Inspection
LIST OF APPENDICES
Appendix A Photographs
April 2022 Page I
Project:00.0061.20
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
1.0 INTRODUCTION
On August 24 and 25, 2021, Walter Gerald (NC L.G. #0446) of SynTerra inspected the H.F. Lee
Energy Complex (H.F. Lee or Site) property for existing and potential new seeps. General
observations include:
• Previously unidentified seeps were not observed during the inspection.
• Notable changes to seeps were not observed during the inspection. Observations are
consistent with past inspections.
• Seeps eliminated by decanting of the Active Ash Basin are consistent with past
observations.
• The decanting target for the Active Ash Basin was reached in November 2018.
• Dewatering of the Active Ash Basin began in July 2019 and is ongoing.
• Removal of ash from the Active Ash Basin began in September 2020 and is ongoing.
Inspection activities were performed in accordance with North Carolina Environmental
Management Commission (EMC) Special Order by Consent (SOC) WQ#S18-006. The SOC
describes inspection requirements as follows:
Duke Energy shall conduct annual comprehensive surveys of areas down gradient
of the ash basins, the Lay of Land Area (LOLA) and the cooling pond, identifying
new seeps, and documenting the physical characteristics of previously
documented seeps. All examinations of seeps must include identification of seeps
by approximate latitude and longitude and date-stamped digital photographs of
their appearance. A report summarizing the findings of the surveys, including a
section analyzing the effect decanting of the basin(s) has on seep flows,
accompanied by copies of the photographs noted above ("Annual Seep Report"),
shall be submitted to DWR in conjunction with submittal of the April 30 quarterly
report noted in 2(b)(3) above. This Annual Seep Report must list any seep that has
been dispositioned (as described below) during the previous year, including an
analysis of the manner of disposition.
Each location documented as a seep at issuance of the SOC, as listed in Table 1, was observed
and documented with photographs during the inspection.
The weather was clear to partly cloudy before and during the inspection. Temperatures ranged
from approximately 75 to 90 degrees Fahrenheit. No rain was recorded at the on-Site weather
station over the period of August 21 to August 25, 2021, including the two days of seep
inspections.
April 2022 Page 1-1
Project:00.0061.20
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
Mr. Gerald reviewed previous seep inspection reports and the weekly dam safety inspection
reports for the Site's four ash basins:
• Active Ash Basin (AAB)
• Inactive Ash Basin 1 (IAB1)
• Inactive Ash Basin 2 (IAB2)
• Inactive Ash Basin 3 (IAB3)
Sharat Gollamudi (Duke Energy system owner) conducted the ash basin dam safety inspections
and prepared those reports. Observations from the dam safety inspection reports were
consistent with observations made during the seep inspection.
The inspection included observations in the following areas (Figure 1):
• Along the shore of the Neuse River and Halfmile Branch
• Areas along and downgradient of the ash basin dams
• Drainage features associated with the ash basins
Seep locations and inspection areas are shown on Figure 1. Observations noted during the
inspection are summarized on Table 1. Representative photographs taken of each seep location
during the inspection are included in Appendix A.
April 2022 Page 1-2
Project:00.0061.20
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
2.0 FINDINGS
2.1 General Observations
Inspection observations for each seep are described in Table 1. The following general
observations were noted during the inspection:
• New seeps were not observed during the inspection.
• Dewatering equipment/piping was observed at the edge of the Neuse River on the
southwest side of the AAB.
• The United States Geological Survey (USGS) gage station (02089000) located
approximately 10 miles downstream reported the Neuse River ranged from
approximately 5.2 feet to 4.8 feet and was falling over the two days of inspection.
• Several seeps previously determined to be below the ordinary high water mark were
observed along the AAB and cooling pond areas due to low river levels.
2.2 Effects of Decanting
Decanting of the AAB at H.F. Lee commenced in April 2016 and was completed in November
2018. Dewatering of ash pore water began July 2019 in the AAB and is ongoing.
Decanting of the AAB has reduced seep flow to the perimeter ditch in areas north, east, and
west of the AAB. North of the AAB, no flow was observed at S-01 and S-06. Seeps S-27 and S-28
exhibited reduced flow compared to previous observations. East of the AAB, no flow was
observed at 5-07, and 5-08 exhibited reduced flow compared to past inspections. West of the
AAB, no flow was observed at S-02.
Decanting of the AAB does not appear to have reduced seep flow in areas south of the AAB
(5-22, S-23, S-24, S-25, and S-26).
2.3 Changes to Seep Status
Mr. Gerald inspected each seep to evaluate whether it met requirements to be dispositioned in
accordance with the SOC.The requirements for dispositioning a seep are as follows:
For purposes of this Special Order, "dispositioned"includes the following: (1) the
seep is dry for at least three consecutive quarters;(2)the seep does not constitute,
and does not flow to, waters of the State or Waters of the United States for three
consecutive quarters;(3) the seep is no longer impacted by flow from any coal ash
basin as determined by the Director of DWR in accord with applicable law and best
professional judgment; or (4) the seep has been otherwise eliminated (e.g.,
through an engineering solution). If a seep that has been dispositioned through
drying up reappears in any subsequent survey, such a seep will no longer be
deemed dispositioned and can be subsequently re-dispositioned as specified
above.
April 2022 Page 2-1
Project:00.0061.20
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
Seeps LOLA S-01, S-01, S-02, S-04, S-06, and S-07 have been observed as dry or not flowing to
Waters of the State or Waters of the United States for more than three consecutive quarters.
Those seeps were proposed for dispositioning in the 2021 Final Seep Report(SynTerra, 2021),
and Duke Energy has requested that the North Carolina Department of Environmental Quality
(NCDEQ) review and certify that they be dispositioned in accordance with the terms of the SOC.
April 2022 Page 2-2
Project:00.0061.20
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
3.0 REFERENCES
North Carolina Department of Environmental Quality. (2019). Special Order by Consent EMC
SOC WQ S18-006.
SynTerra (2021). 2021 Final Seep Report. H.F. Lee Energy Complex. October 29, 2021.
April 2022 Page 3-1
Project:00.0061.20
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
FIGURE
‘.41d
s ynTe rra
Science & Engineering Consultants
II
1
I •
' I.
\.A
I
> \ �•' ,-04„1.?' •---..—
' LS-02VY ••\
�•' •` �, IB�C S 0`I
•
P
E_12I. o 4c�s 04i
s'A / Y'1'. , i
/
.'o1F.,�s i J
11S23I .1
•
•
- I1C)IA.`S OTRV7.,... .
I eas LEGEND
• ` • NON-CONSTRUCTED SEEP
ILOLAS OI - •••,.. Cas-1>1 'CPS-207'PS 18I..: • DISPOSITIONED SEEP
,�_..— _____�-.•—--. - CPS 13f .: C'S 011 CPS i•,K —ACTIVE ASH BASIN WASTE BOUNDARY
® —
�� CPS-O8� ' DUKE
ENERGY
BASIN RE STE BOUNDARY
PS+
CPS-08I- :' .DUKE ENERGY PROGRESS PROPERTY LINE
...,� ®SOC INSPECTION AREA
`CPS-2f
I ;,;3}}'Y`Op -�STREAM(AMEC NRTR)
T • CPS 09J •r SURFACE WATER FLOW DIRECTION
t. :A"Ivi.' ilk-:,•-,•
_
•�••r•.` I a � LCPS 1' .. ®WETLAND(AMEC NRTR)
"rCPS-10 earn
'AA . ,,i-
,-r I o 1 d BDC.SPECIALOPOEX BY CONSENT
C.5-12 • 2 SEEP LOCATIONS...DESCRIBED N EMC SOD WDAGIB DE
•A — SME WATERS OF THE US RHOMM ON THIS Mr;HAVE Nor BEEN APwovED BETMF US ARMY CORPS OF
•
ENGINEEERRS.AETANDS AND STREAMS BOuNOARIES NEEL oOrAINED mom A4Ec FFosTE AND
'\ / TI f w .. DATEDM.1ARY p.NATURAL1 AND IPOATE3 TECHNICAL lit
IMEc IN MA Fp v 201i. Es
V BGuxouLEBARE/iVROpEIATE
•' B • +: r ? ,EROFERDE IOLDIOA O°,eV DUKE ENERGY PROGRESS.
\ nDAAARSAT,EL IMAGERYE OBTAINED FROM EMI.COLLECTED BMITAI:EM NOVEABER I AND
DECEMBER•
~ . J/„.raWRNG0�� APR02CT!.DE NORTH GARDENA STATE R ARE COORMATF
\ .�./ y { RSS"WINDWI."'"
\ .......
'. � DUKE Boo R nIIA ifieSls 00E L210 FIGURE 1
ENERGY ===== SEEP LOCATIONS AND INSPECTION AREA
'•./• PROGRESS DRAWN Or A.ENHAEFEN DATE:UA/JG/2021 2021 ANNUAL SEEP REPORT
CRDASEDRECRE BI:CNYATT DATE:10/21/2021
)' *- `1 aEaEDBY.r.cRANr DATE:mn1/2G21 H.F.LEE ENERGY COMPLEX
... ktic: � � / APPROVED w:X.FERRI DATE:IO/2172021
S�TeRa I«aECTMwnfxKTERRI GOLDSBORO,NORTH CAROLINA
www.SwillerraCorp.com
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
TABLE
.411,
Te rra
Science & Engineering Consultants
TABLE 1
SEEP LOCATIONS AND DESCRIPTIONS-AUGUST 2021 INSPECTION
2021 ANNUAL SEEP REPORT
H.F.LEE ENERGY COMPLEX
DUKE ENERGY PROGRESS,LLC,GOLDSBORO,NC
Seep ID Location Coordinates Receiving Receiving Interim
Waterbody Description... SOC Monitoring Action Notes from 2021 Inspection
Number Watarhody
Latitude Longitude Classification Levels
LOLAS-01 35.3/95G8 /N.0/5043 Noose River WS-IV;NSW Seep Iron the land area north of the cooling pond between the cooling pond and the Neuse Instream monitoring of the NA-028 Stagnant standing water_Nolbw to the river.Conditions consistent with onion ntRerv+ri,,n5.
giver.Not a seep emanating from the active ash basin Neese River Standards Apply
LOW 5-0IA 35.379648 •78.074632 Neuse River WS IV;NSW Seep Porn the land area non of the cooling pond.betweenthe cooling pond and the Neese Instream monitoring of the NA-028 Erosional channel leading to the Neese River.Wet,with lhtleto no active flow present.Some
River.Not a seep emanating born the attNe ash basin Neese River Standards Apply Iron staining present in sediments.
LOLAS018 35.380846 -/N.01/59/ Neese River WSIV;NSW Seep from the land area north of the coaling pond,between the cooling pond and the Neese I npream monitoring of the NA-028 Seep is reported to be below the ONWM and likely submerged by the river stage.No active flow
River.Not a seep emanating from the active ash basin Neese River Standards Apply or thannelloation on the river bank was observable.
Ditch system draining area norm and Low volume seep to small channel north of active ash basin at the toe of the dike.Flows west, Monitoring at location Ditch contained standing cower.No perpendicular flow was
observed
from the bank into the
5-01 35.386p5p -7A 01345R east of active ash basin WS-IV:NSW then south,toward confluence with Neuse Riser at sampling site 5-03A 5-03A S.es O. ditch.
Ditch system draining areas north and low vokime seep to small channel north ofanie ash basin at the toe of the dike.Flows west, Monitoring at location Ditch contained water with some Iron staining and low flow toward S03.No Dow nerfsendi,clar
502 35.384001 J8.081383 east of an Ne ash basin WS Iv;NSW then south,toward confluence with Neese River at sampling slte S-03A 5-03A See 5-03A from the basin was observed.
5-03•• 35.382665 •78.084374 Neuse River WS IV;NSW Not a seep NA-Seep DNpositioned NA-Seep Dkposttioned Flow from culvert beneath roadway at about 25gpm.Upstream from 5-03A Some iron staining
In sediment.
Arsenic 100 pg/L
503A•• 35381806 .78.0840S2 Neese River WSW;NSW Sampling location;not a seep NA-Seep Dkposhloned Hardness 500 mg/i Steady flow In the perimeter drainage ditch to Ole Neuse River.
TDS 800 mg/L
SO4 35.381993 -78.078784 Neese River WSW:NSW Stagnant,ponded water Inland from river terrace below southwest side of active ash basin. lmtream Monitoring of Neese NA-028 pmnded cower.No lbw observed.Some stalnin
River Standards Anrvy 8pesent near the seep sign.
S-05•• 35.3790I5 -78.070293 Neese River WS-Ni NSW Static AOW near rlmaDaired on the south side dthe southeast corner of active ash basin. NA-Seep Dhposhioned NA-Seep[epos Rioned Dispositions.No seeps or flow observed from the rlpap.
Location has been repaired.No flow observed In recent observations.
Ditch system draining area nor WSN;NSW
Iand Law volume seep to small channel on east side of active ash basin xtlre toe dthe cake.Flows Monitoring at locationSee 5-09 Perimeterditch contained water.No perpendicular flow from the basin side of the bank was
SO6 35.386968 -]8.071942 eat ofactive ash basin south,toward confluence with Neese River at sampling site S-09. S.09 observed.
Dntnsystem drabbgareas noonand Low volume seep to small channel on east side of active ash basin at the toe of the dike.Flows Monitoring at locationSee 5-09 Perlmmerditch contained water with steadylow ibwsouthward towardbcallon5-00.Noflow
5-07 35.3s2767 -78.069655 east of active ash basin WS'N;NSW south,toward confluence with Neese River at sampling site S09. 5-09 perpendicular to the basin was observed.Some Iron staining In sediments.
Ditch system draining areas north and Stark AOW near rlprap area an the east ibed the soMheat turner of active ash basin.Ann flow Monitoring at location page areas g penimelerditch.Someiron stainingt.
S i!9 35.3805] -78.O6s532 east of active ash halo VlSN.NSW colleen in channel and lbws south toward 509.No flow observed in recent observations. 509 See 5-09 Wide see ion thepresrn
Arsenio 400 pet
Steady lowi510 10 semi flow In the drainagedhch to the Neese River.Flow in the ditch
,iY1•• 35.379492 -78.067718 Neuse Rivet WSN;NSW Sampling traction;not aseep NA-Seep repositionedrepositionedNaT0S8 500 mg/mg71
TDS 800 mgA appeared normal.
S 18 35.379222 -78.101206 Neese River WSIV;NSW Stagnant,ponded water Inland from river terrace below east side of inactive ash basin. lnwream Monitoring of Neese NA-029 Ponds water with orange staining below roadway embankment.Some flow was obs,•i',nrr,or-
River Standards Apply discharging to the Neese River.
5-19• 3538119 -78.097649 Reuse River WSN;NSW
Stagnant,ponds water Inland from reef terrace below nonheast side ofinamNe ash basin.
NA p S Dkposkloned NA-Seep DLiposgloned Dhposifioned.FAtod A c seep submerged by the river level
From sampling-NO CCR Impacts.
TABLE 1
SEEP LOCATIONS AND DESCRIPTIONS-AUGUST 2021 INSPECTION
2021 ANNUAL SEEP REPORT
H.F.LEE ENERGY COMPLEX
DUKE ENERGY PROGRESS,LLC,GOLDSBORO,NC
Seep lD Location Coordinates Receiving Receiving Interim
Waterbed,/ Desnfront iption••• SOC Monitoring Action Notes 2021 Inapectlon
Number weterbody
Latitude Longitude Classification levels
sw
Seep near well CMW-10,along the coat,'side of active ash basin.Location has eeen repaired to pus Seep Isos sign d drainage 520•• 35.382406 -]8.OA1053 Neese RNer W'S V.NSW eliminate seep. NA-Seep Oh kronetl NA- Dh eloped Dkposkloned.No Row was observed the sl and historic drains into the riser.
511" 35.382151 JB 0803JG Neese River w v,rISK' Stagnant seep along south side of anNexAny fbw re-infiltrates prior to reaching NA•Seep D ispositioned NA-Seep Dhposltoned Ohposltioned.Some ponded water In old drainage swore.No lbw was observed to the river.
sedateoah wateasin.wxer.
Instream Monitoring of Neuse NA•02B Trickle of flow I<1 spell with Iron staining to the Neese River.Observations are consistent with
522 35.381466 •78.077819 Noose River WS-IV;NSW Seep along south side of active ash basin.Flows toward Neue River River standards Apply past events.
gsouth side of active ash basin.Flows toward Neuse River
Instream Monitoring of Neuse NA-02R Seep along the south side of the active ash basin in the flood plain of the Neuse River.Flow is
5-23 35.381175 -780 Seep 77136 Neuse RNer WS.IV;NSW aloe River Standards Aestimated at and with ts.lron staining t
gpm an past even gpresen.
51a 35.3Atof,3 -]8.0]6431 Neuse River WSiv;rvSW See Inn ,'side of active ashbsln.Flows toward Neuse River
Instream Monitoring of Neuse NA•02B The seep begins at the base of a steep bank near the river.flow to the river h consistent with
Seep along River Standards 0.poly past events.hen staining is present.
525 35.330922 78.076001 Neuse River W5-IV;NOWSeep along south side of act he ash basin.Flows toward Neuse RiverInstream Monitoring of Neuse N
River Standards Apply Observed flow to the Meuse RNer Is law and consistent with past events.nonstaining is present.
S-26 35.38164 ]g.0]8322 Neuse Rives W5-IV:NSW Seepwkhin a small drainage channel for ponded water within the river bank below south side of Instream Monitoring of Neuse NA•02B Multiple erosional features on the river bank.low lbw b consistent with past events.Some iron
active ash basin.Flows toward Nellie River. River Standards Apply Is staining present.
5.2J 35.3858dRJB.015999 DRCN system draining area norm and WI N;NOV.' Low volume seep to small channel nosh of ache ash basin at the toe of the dike.Flows west, Monitoring at location Seepage areatolhe perimeter ditch.No observable flow.Some iron staining present.
castor anise ash basin then south,toward confluence with Nome River at sampling site 5-03A 5-03A
Ditch system draining areas norm and Low volume seep to small channel nosh of axNe ash basin at the toe of the dike.Flows west, Monitoring at location No measurable flow was observed to the perimeter ditch.Significant dark orange Iron staining
S28 35.3AS133 •]g.p1819] east ofactwe ash basin WSIV;NOW then south,toward confluence with Nernw a River at sampling site 5-03A 5-03A Sae S-030. with sheen.Consistent with prior observations.
See HaRmile Branch Iol ream
529 35.37862 18.0I593 Itatlmlle Branch WYIV;NSW Seep to Nag mile Branch on southwest side of retired Instream Monitoring of Hallmlle Monitoring
repaired with rip-rap.Orange Iron staining with sheen on water.Seep iron bank of
ash basin g2. blanch (SOC ARacnment A page el Inactive Ash Basin No.2 net observed.
CPS01 35.3/924 •]g.0/377 Neuse River WS-IV:NSW Seeptase from the berm surroundingfrom
the the cooling pond. Instream Mpnoes of Neuse NA 028 Low steady flow from none on riverbank at water interface,determined to be below OHWM.
Not a seep emanating from the active ash bait. River Standards Apply
[Pt-02 35.37901 It 07704 Neuse River Wt-IV;NSW Seep from the berm surrounding the cooling pond. Instream Monitoring of Neuse NA-02U Low Row(torn seep along the riverbank near water Interface,determined to be below OHWM.
Not a seep emanating from the active ash basin. River Standards Apply Orange staining on se6ments.
Seep iron the barn surrounding the cooling pond. rnstream Monitoring of Neuse NA•026 Same seepage along the river bank near water Interface,determined to be below OHWM.Some
cos, 35.37895 )gtfu2](! Neuse Nrvcr WS-IV;NSW Not a seep emanating from the active ash basin. River Standards Apply orange staining on sediments.
f.P5-04 1',07002 g/]5]l1.r Neuse River 19110 NSW Seep from the berm surrounding the cooling pond. Ins/yearnnwaterM onodng of Neuse NA-0211 Some seepage along the river bank near water Interlace,determined to be below OHWM.Some
Not a seep emanating from the active ash basin. River Standards Apply orange staining an sediments.
Page 2 of a
TABLE 1
SEEP LOCATIONS AND DESCRIPTIONS-AUGUST 2021 INSPECTION
2021 ANNUAL SEEP REPORT
H.F.LEE ENERGY COMPLEX
DUKE ENERGY PROGRESS,LLC,GOLDSBORO,NC
Seep ID I oration Coordinates Receiving Receiving Interim I
Number Water body Waternody Description a" SOC Monitoring Action Notes from 2021 Inspection
Latitude longinrde ClassificationI Levels
CPS-OS 35.37aas sr.,,,.)t WS-IV, Seep from the berm surrounding the cooling pond. Instream Monitoring of Neuse NA-0l0 low l',ow seepage from both sides of large rock.determined to be below OIIW M.Some orange
Not a seep emanating from the active ash basin. River Standards Apply staining.
L'P506 35.31:19 ��.�., WSN;NSW Seep N erm o on the b surrounding the cooling pond. Instream Monitoring of Neuse NA-02B Low seepage flow(-5 gpm)of clear water from low-lying mud flats to Fiver.Appears to be
Not a seep emanating Iran the active ash basin. River Standards Apply typically below high water mark.
Seep from the berm surrounding the cooling pond. Instream Monhonng of Neuse NA-02B Low seepage flow(^S gem)of clear water from low-lying mud lists to river.Appears to bun
CPS-07 3537177 -7g.0665I Nouse ROor WS-IV;NSW Not a seep emanatingfrom the active ash basin. River Standards
PpiV typically below high water mark.
CPS Og 353Ty11 -73J16780 WS-IV;NSW Seep from the berm surrounding the cooling pond. Instream Monitoring of Neuse NA-02B Low flow(^2 gpm(to the Neuse River.Some iron staining present.Observations consistent von
Not a seep emanating from the active ash basin. River Standards Apply past events.
•
CPS09 35.36922 -78g77880 WE-N;NSW Seep from the berm surrounding the cooling pond. Instream Monitoring of Neuse NA.0213 Ponded water with heavy orange staining and sheen.Flow Increases downgradient toward me
Not a seep emanating from the active ash basin. River Standards Apply Neuse River to about 5 gpm.
Seep from the loom swtounding the cooling pond. Instream Monitoring of Neuse NA-02B CPS-10 35.36840 -18 OR1)S Ponded water with heavy omngestaining and sheen.Na discharge to the river was obse NK-IV; rvwi
Not a seep emanating from the active ash basin. River Standards Apply
CP5-11 35.36829 -78.08141 WS-IV;NSW Seep ilom the berm surrounding the cooling pond. Instream Monitoring of Reuse NA-02B Seal seep to the riven.Very low flow.Orange staining a seep emanating from the active ash basin. River Standards Apply on river bank.
Seep from the berm surrounding the cooling pond. Instream Monitoring of Neuse NA-02B[PS12 35.36816 78.06156 Neuse Rruer WS-IV;NSW Not a seep emanating from the active ash basin. giver Standards Apply No seepage,flow or staining of sediments was observed.
•
Seep from the berm surrounding the cooling pond. Instream Monitoring of Neese NA-02B Appears to be standing waterwith Iron staining and some sheen.NO Row observed.[PS-la.CPS
CPS-11 35.37972 •78.07540 WS-IV;NSW 14 and CPS-IS are all identified as separate ucsgradient depression.eas of one broad depression.low
No[aseep emanating from the active ash basin. River Standards Apply 14
all three areas merges and flows Into the Neuse River near the CPS-IS location.
Seep Pram the berm surrounding the cooling pond. Instream Monitoring of Heim NA,02B `Water with significant Iron staining and sheen.Very low flow observed.CPS-I3,CPS-14 and CPS-
CPS-14
35.37963 -78.07521 WS-IV;NSW
Heim15 are all identified as separate upgratllen[areas atone broad depression.Drainage from ag
Not asedp emanating from the arrive ash basin. giver Standards Apply three areas merges and flows into the Neuse River near the CP5.15 location.
[PS15 35.37962 -78.07460 WSN;NSW Seep from the berm surrounding the cooling pond. I nstream Monitoring of Neuse Na flow observed into the Nemeth,Someiron staining anent on sediments.CP513,Ces-14
Not a seep emanating from the arrive ash basin. giver NA-02B Standards Apply andCPS-I5 are all Identified as separate upgradient areas of one broad depression.Drainage
from all three areas merges and can Row into the Neuse River at the CPS-15 location.
CPS-16 35.37942 -78.07423 WSN%NSW Seep from the berm surrounding the cooling pond. Insream Moneodng of Neuse NA-02B CPS36 is formed as seepage Rows across a riverbank shelf and to the Neese River.LowRovrI-
Notaseepemananingfromtheactiveashbasin. River Standards Apply 2gpml appears consistent with pastevents.Orangeiren staining present.
Seep irom the berm surrounding the cooling pond. Insream Monitoring et Neuse NA-028 CPS-I] 35.37465 -78.06165 S WN;NSW Note seep emanating from the active ash basin. Riven Standards Apply No flow was observed in drainage channel above the level of the Snore River
CPS-1B 35.37195 -78.06605 'NS-IV;NSW Seep from the berm surrounding the cooling pond. Instream Monitoring of Neese NA-02B
Not a seep emanating from the active ash basin. Oiven Standards Apply Seepage emerges from base of tip rap.Low Raw with iron staining was observed.
Page 3014
TABLE 1
SEEP LOCATIONS AND DESCRIPTIONS-AUGUST 2021 INSPECTION
2021 ANNUAL SEEP REPORT
H.F.LEE ENERGY COMPLEX
DUKE ENERGY PROGRESS,LLC,GOLDSBORO,NC
Seep ID Location Coordinates Receiving Receiving Interim Waterbody Description••• SOC Monitoring Action Notes from 2021 Inspection
Number Waterbody
Latitude longitude Classification levels
Seep Isom the berm sot rounding the cooling pond. Instream Montronmgol Neuse NA-020 Seepage emerges from base of rip rap.Low Row with Iron staining.Minnows were observed
CPT-19 35.37192 -78.06625 w'S IV;NSW Not a seep emanating from the active ash basin. Rive Standards Apply swimming in the water.
CPS-20 35.37202 -78.06630 Neuse Prver w1 IN;NSw Seep from the berm Sin mutant the cooling pond. Instream Monitonng of Neuse NA-02B Seepage emerges from base of rip rap.Low flow(-3 gpn)with Iron staining In sediments
Not a seep emanating from the active ash basin. River Standards Apply observed.flow to the confluence withCPS-0]and Neuse River.
Saturated area at the toe of dam merges with a broad area of standing water.No flow was
Seep from the berm surrounding the cooling pond. Instream Monitoring of Neuse NA•028 observe].Seepage could follow multiple small channels down a section of steep tiverbank from
CPS-it 3S.poem -76.075ge Neuse Rrver WS-IV;NSW Not a seep emanating from the active ash basin. River Standards Apply the area of standing water to the Neuse River.General observations are consistent with past
events.Iron staining psesent within the standing water.
Prepared by 11— Checked be KNOWN(
HggL
•localise.previously investigated as aseep.Monlsorkg has not indicated the presence or coal combustion r mahlais
••seep dnpofitwned via repair and/or narn lowang cnndrbon in y0remu3y reach waters of the O.S.,or other,as noted.
•••Some tlmeripuorw luxe been updated bon the anginal test found in the SOC Attachment A table for accuracy and currency
yg(l-mi rogrwn per Mar
mg/I.•milligrams per liter
020-ISA NCACO211.0202 Steward
AOW area of*tens
CCP-coal combustion reslduala
Wee-gallons per minute
NA-not a.PPMblo
NSw-mmiem Sensitive Waters
ONWM-manato high water mark
T0t-totaldnsol.ed solids
WA-N-Water Sunni./•Iggely Developed
Peen a of
2021 Annual Seep Report
H.F. Lee Energy Complex
Goldsboro, NC
APPENDIX A
PHOTOGRAPHS
‘4°A
Terra
Science & Engineering Consultants
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North West Elevation
0 122'SE(T) LAT:35.379906 LON:-78.075506 313ft•76ft
y
. _ ram:--
s- _, v fi
-"V Yy asT'
r._
if
x�'.3C� s
va.1Filigilki - „.
�� _-
•
:_OLAA S-0, F •# }4 !.F lce
SynTerra 4 Au�Zv..r.14 25:.i
.
LOLA S-01 Standing water at LOLA S-01. No flow observed to the Neuse River.
North Elevation
O 196"S(T) LAT:35.380012 LON:-78.075174 213ft •66ft
•
j� '1 -..
li �
44414k
LOLA S-01A HF Lee
S,^Terra - . 24 Aug 2021,11.14.41
LOLA S-01A I View of bank where S-01A emerges and enters the Neuse River.
August 2021 Photos Page 1
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North East Elevation
0 206°SW(T) LAT:35.380978 LON:-78.077664±13tt •64ft
r i .Z
fic
r.
Ili` '" s -,. .
-F Lee
-,- -..;202 t,10.52.58
.4
LOLA S-01B The Neuse River in foreground, LOLA S-01B in background.Seep is below
the ordinary high water mark.
South Elevation
O 355°N(T) LAT:35.386828 LON -78.073465±9ft •831t
71 ,,i f•
i
Aii?
M. s�
y-? ' • . /1f.. 'I"
1i r:
r ' `
� ,
E_` Fr_j ELpp�. .e
. 1�.t �• �-� .
. , .
i._,, ", , .g,-.
...,.., . :. ,.,„. /. ,
$-U1 Perimeter ditch at the north corner of the active basin. No flow observed
perpendicular to the ditch.
August 2021 Photos Page 2
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South Elevation
0 348°N(T) LAT:35.383968 LON:-78.081334*13ft a 86ft
•
_
�-� Auf•
-
S-02 •
a f <F
S 02 Perimeter ditch on the north side of the active basin. No flow observed
perpendicular to the basin.
North Elevation
O 181°S(T) LAT:35.382716 LON:-78.084378±9ft a 76ft
4'
•
A o.W. =.
S-03
a•
S a 1' C.
s 1; j�.
!.r
..t .<.}-
s
t .. v�, • •s
>. 3 .fy ♦'i. � �if •
q i
r.
. y . .
.1 D
1 1
y'
1'Jt .. • .• NFL e
( " i, 4At. ,z, r
b - -
S-03 Flow in perimeter ditch on the west side of active basin.
August 2021 Photos Page 3
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
M.% N NE
0 345•N(T) LAT:35.381712 LON:-78.084079*9ft A 64ft
1
r
v
(
ss
y, {p}y.. .. -- __ .-� .a;
5-03A Facing north where the perimeter ditch enters the Neuse River(foreground).
North East Elevation
O 210°SW(T) LAT:35 381953 LON:-78.078423 t13ft •79ft
VY. � ; _
A.O.W.
Y
-04
x ,
s_,Sq`" - .',„ Y. ! 'k'-1F L
Syi _Ka ; 4 ,. 'cfi, . .d f 21:2IFA
S-04 I Ponded water at S-04. No flow observed.
August 2021 Photos Page 4
B 8
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South West Elevation
O 39°NE(T) LAT:35.382871 LON:-78.069794 t13ft •79ft
• ; -
x
4
-, S-07 '
•
$ -• .
t 4T.1
')PT.,''''-‘2- 4a r • 2`Au3 21' t i o
S-07 I Seep area east of active basin. No flow observed perpendicular to the basin.
South West Elevation
O 52°NE(T)LAT:35.380534 LON:-78.068487 t13ft •77ft
1i x. i( ^+i'4 7 fi',oAsjr y�T1 1
(- * aF M1 1 , jt. ' �
i
KM,W,1 . >R -1 ,
S- .e.:(„.,„...
p$ t :,,Y i l <ir; J„
I ^^... 7. 1 Try , r v;k-_,,-,',4r , ' 1�!„oi
-N 31 ' i ' x f r t 1
y
4 , ), ,
i :.,,�} ,may �i
S-08 l Low flow from the S-08 seep area is observed.
August 2021 Photos Page 6
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North West Elevation
O 133°SE(T) LAT:35.379441 LON:-78.067718±13ft A 89ft
t
4- r
T _♦l
l .4:— ° 4 T f HF4 '
�f''jam '? .. ."a. '.•.i _6- l '.s„�::.
S-09 Flow in perimeter ditch on east side of active basin.
SW W NW
2.� 1 aoo 3a_:
®287°W(T) LAT:35.379198 LON:-78101129±13ft •72ft
r x
- :: rr :,ns a '-.; .t.
f _
t.: ' c _
-
5-'s - HFLee
SyrTer a 24 Aug 2021.09.-1:51
$-18 Facing west,S-18 is behind the red floating barricade. Neuse River in foreground,
ponded water was observed to be flowing into the river.
August 2021 Photos Page 7
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
W NW N
O 328°NW(T) LAT:35.381780 LON:-78.097557:13ft•67ft
• a.
•
HF Lee
S,nT::rra 24 Aug 2021.09:49:23
S-19 The Neuse River in foreground,seep in background.Seep is dispositioned.
W NW N
3n
O 332°NW IT) LAT:35.382006 LON:-78.081899:13ft A 66ft
•
tidier
+001111'
S,yiL; " HF Lee
erra:,` -:24 Aug 2021,10.19.37
S-20 Neuse River in the foreground.Seep is dispositioned.No flow observed.
August 2021 Photos Page 8
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North Elevation
O 163°S(T) LAT:35.382186 LON:-78.080358 t22ft •88ft
4
U. Jc yy •T —,
xs'n a �t i; ' '-'=ram _
sfs •t.
i
'
y
S-21 F l=
SynTerrz
-
S-21 I Ponded water at S-21.Seep is dispositioned. No flow observed.
North Elevation
A 179°S(T) LAT:35.381517 LON:-78.077886 t13ft •78ft
j14111
'`.
,
fY M+~
KV
c5
$-22 S-22 in the foreground and the Neuse River in background.Trickle of flow to the
river.
August 2021 Photos Page 9
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North East Elevation
O 229°SW(T)LAT:35.381226 LON:-78.076974 119ft ♦73ft
1
4.2' -
�i . g f
b .7L
1y'.J .. �
w
• 1 F co
1
� , 4 tT *1
HF Lei
•_- 1-= .-_.Auger 0 1,12:1 1:12
S-23 I Channel drains to the Neuse River(background). Iron staining present.
North East Elevation
O 204°SW(1) LAT:35.381038 LON:-78.076395*13ft♦88ft
at1C yi
tr
f � .
«
Y
1
•
s-:i.: . t-i-i:.a
$-24 Seep area at S-24 as it enters the Neuse River in the background. Iron staining
present.
August 2021 Photos Page 10
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North East Elevation
O 203°SW(T)LAT:35.380927 LON:-78.076100 t13ft A 79ft
+-
+ °
1L
s
'1.♦
;..
12.00.13
3
S-25 Seep area with low flow in the foreground, Neuse River in the background.
NW N NE
O 19°N(T) LAT:35.381575 LON:-78.078375±13ft ►56ft
••
1
•
S-26 Seep as it enters the Neuse River from the north bank.
August 2021 Photos Page 11
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South Elevation
o 3°N(T) LAT:35.385857 LON:-78.075979±9ft ♦84ft
•
s /,�.
F Aid W. ''.
1 •F
„� k`: ,.
'• h hex
$-27 Perimeter ditch with standing water. No observable flow perpendicular from the
basin at S-27.
South East Elevation
O 302"NW(T) LAt 35.385173 LON:-78.078156 t9ft •76ft
V ` rri,I • ''
.� ` ;.• ., ,i 1 1/4 N
4,,,; ,, ..+_-.tor. , ,
i11 J/f e\,Y\
,� 7
c - / _• • NF Lee_
a' _t „'`..-.,.G, 9 i_ .40:29
',
S-28 Standing water in perimeter ditch with some iron staining. No flow observed.
August 2021 Photos Page 12
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South West Elevation
O 64•NE(T) LAT:35.378172 LON:-78.105246*13ft•77ft
.♦;4 . • Y `ir - -
c
'►s.. ''
•
Yif: \
`; t. c _ 4
fi •
�.F.r.4 a 1.t
S,n'e . Lc . F
S-29 Area along Halfmile Branch repaired with riprap,seep not observed.
North East Elevation
O 213°SW(T) LAT:35.379318 LON:-78.073695 t13ft •67ft
- : .,
X.
' ;-.
t'- '
t :-
..
PS-01 • FiFLee
S.,-Tea-; t 2.1 AL.g 2021.11:3C 16
CPS 01 The Neuse River in foreground and CPS-01 area in background.Low flow from
seep on riverbank at water interface.
August 2021 Photos Page 13
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North Elevation
O 190°S(T) LAT:35.379059 LON:-78.073277±13ft ♦66ft
v
J W • - 'f
•
�
r
- v .
.1,7 ' 1 :X r
Ntir�� f I
p' a f
YF i 2 s .t t t `f,I� HF Lee
ire - . :`S n,,yjr.' -� 25.11.3?:06
CPS-02 Low flow from seep along the riverbank near water interface.Orange staining
on sediments.
West Elevation
O 105°E(T) LAT:35.379019 LON:-78.067088±13f1 ♦66ft
i •
•
•
; t rl"` t . ! w
y Y^
•
•
CPS-!�3 - T Lee
Synjgrra 21 Aug 2G2. $:C5
CPS-03 The Neuse River in foreground and CPS-03 area in background.Seep is
determined to be below the ordinary high water mark.
August 2021 Photos Page 14
Project:00.0061.20
•
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
West Elevation
O 103°E(T) LAT:35.379096 LON:-78.067030±13ft •74ft
•
r m ; •
alert �'
CFS-0t ' �: HFLe
Syx7e,ra , lc. 2-1 A,:q 2021.12:13:50
CPS-04 The Neuse River in foreground and CPS-04 area in background.Some seepage
along riverbank, but below the ordinary high water mark.
North West Elevation
O 149°SE(T) LAT:35.380037 LON:-78.065718 t9ft •73ft
CPS-05 * HF Leez`
Syr,Terra ;k*'' f f 2-. _ ,?1,1218:06
CPS-US The Neuse River in foreground and CPS-05 area in background.Orange
staining observed.Seep is below the ordinary high water mark.
August 2021 Photos Page 15
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South West Elevation
0 36°NE(T) LAT:35.371775 LON:-78.066350 t9ft A 65ft
i,„
9:,7
a '
ft
`1 t FiF :55
We.; 1 -A 2 .g 2427,13:2:02:55
CPS-06 Neuse River in foreground,seepage area in background. Low flow of clear
water was observed.
South Elevation
®20°N(T) LAT:35.371771 LON:-78.066412±9ft A 75ft
. ..
a
1 3
F6
a
CPS-07
A
S'Terra • i-• w ��
a4
CPS-07 Neuse River in foreground,seepage area in background. Low flow of clear
water to river observed.
August 2021 Photos Page 16
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
East Elevation
0 291°W(T) LAT:35.370345 LON:-78.068406 t9ft ♦65ft
-
VV .
J Ala
�
w
a -1
�- ,�.�- •, k r
•
CPS-08 - .
SynTerra `2,.Aug 2021 3:12:45',
CPS-O$ Neuse River in the foreground,seep area in the background. Iron staining
present in CPS-08 channel.
North Elevation
O 163°S(T) LAT:35.369329 LON:-78.078713±13ft •80ft
t
•s i _Y
r
OC f. - ..
I
R`1
1 v
.
s.
j 1 1'
K '�J�J .'�Ir'a z1tit_
CPS-09 I Iron staining present in area of CPS-09. Neuse River in background.
August 2021 Photos Page 17
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North Elevation
O 172°S(T)LAT:35.368596 LOft-78.081409 t16ft•86ft
4-
....P.;.3'1 - .. r -. Hr-
S _
-, ynThrra,,:$ 4 ..2=At.. 1 , J.
CPS-10 CPS-10 seepage area.No discharge to Neuse River in the background.
North Elevation
O 180°S(T) LAT:35.368120 LON:-78.081664 t16ft •68ft
•\..'T *
r� '••
0
a x, ,.
t,?ai a.
ft
tips !; 4 HF I,..
-,qn lsrra
CPS-11 Small seep with minimal flow on the riverbank. Neuse River in background. 1
1
August 2021 Photos Page 18
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
East Elevation
O 278°W(7)LAT:35.368075 LON:-78.082104 129ft•104ft
tiFX f
•
+1 2c
.` O 1 ,' �
-,e a fY q ,-
J- ,...--, ` I.Z
�F
S,n nrr�'.•'
CPS-12 No seepage or flow observed on sediments.
West Elevation
0 77°E(T) LAT:35.379832 LON:-78.075538*13ft ♦112ft
s L-- "";-. 'mot,.-- . '�
r- J
- ', 1 r-:-
"�i r, r �r 1
-°a
ti. irt
r y4 . _ _
tOA ." 1.-y
Fa
..„_
7 ,..mac
CPS-13 Apparent standing water with staining and sheen that merges with flow from
CPS-14 and CPS-15.
August 2021 Photos Page 19
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South Elevation
O 12*N(T)LAT:35.379602 LON:-78.075235*13ft ♦7311
_ _
lR`
11
4._ r ~ 1 it
•
CPS-14 Seepage area of CPS-14 that merges with CPS-15. Iron staining present.
South Elevation
0 341*N(T) LAT:35.379648 LON:-78.074591 t13ft ♦78ft
tho
'ryi by
ts' " • Hrtee
CP$-15 Riverbank where CPS-15 emerges with iron staining present. Neuse River in
the background.
August 2021 Photos Page 20
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
North East Elevation
0 210°SW(T)LAT:35.379527 LON:-78.074085*13ft•63ft
fix- -
11 Tom.,_ �' `
d ram,S ,~ 01 ,y
,� por __
CPS-16 Low flow from CPS-16(in background)to the Neuse River(foreground).Iron
staining present.
East Elevation
O 266°W(T) LAT:35.374389 LON:-78.061350±9ft •56ft
•
-' ,...f ': _
k.r M
CPS-17 I No flow was observed in drainage channel upgradient from the Neuse River.
August 2021 Photos Page 21
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South Elevation
O 9°N IT) LAT:35.371989 LON:-78.066104 t9ft ♦81ft
� v s •-� .- r ram- } i.. :,
v'
it. 1-0,4,....?:f-i;l'''''-''.*-'..:1,9::;" 4, •• .•'''*,a...1/4
.14-3-.;...:'' '••.-4'", it,\ A ,1;,„A. ( .1,-,-.A,,, ..,,' l'
- - , it':
s • 4 � -�
'--r.•,, ':',;1.....,eit, f;) 41. ..iF...ri,..p. .,„ , .,...
i II '441t
lik.
CPS 18 Seep emerging from rip rap at the base of the cooling pond dam. Iron
staining present.
South Elevation
O 349'N(T) LAT:35.371940 LON:-78.066165±9ft •76ft
r ,., f`s' v J 4
tp ii„ _,, fr
r
4,
.t �
, N d • .
,3 ' l
♦ � 51 fi
,. ty ,.. ..•
Y
CPS-19 Seep flow merges with CPS-18 flow and moves to the Neuse River.
August 2021 Photos Page 22
Project:00.0061.20
2021 Annual Seep Report—Appendix A Photographs
H.F. Lee Energy Complex
Goldsboro, NC
South East Elevation
0 321°N W(T) LAT:35.371916 LON-78.066352 i9ft•76ft
•
/ I
I -
r
LF. - bra
i t giA
CPS-20 Seep area at the base of rip rap with iron staining. Low flow observed.
North East Elevation
0 238°SW M LAT:35.369490 LON:-78.075602-13ft a 76ft
',c•-- •fir'^ " ,
. � 4
I �'1
�Yh "
r
- oiVr
'mod
CPS 21 Broad area of standing water. Iron staining present. No flow to the Neuse
River was observed.
August 2021 Photos Page 23
Project:00.0061.20