HomeMy WebLinkAboutRE_ [External] RE_ BR-0139 NC 133 Pipes to Bridge near Funston RdFrom:Herndon, T. Mason
To:Lane, Stephen; Shaver, Brad E CIV USARMY CESAW (USA); Sprinkle, Hannah H
Subject:RE: [External] RE: BR-0139 NC 133 Pipes to Bridge near Funston Rd
Date:Thursday, April 28, 2022 4:45:49 PM
Attachments:image001.png
Thank you for the prompt review and feedback. I will definitely keep the team informed as we move
forward in the design of this project.
I hope you all have a great weekend!
Mason Herndon
Project Development Environmental Engineer
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Lane, Stephen <stephen.lane@ncdenr.gov>
Sent: Thursday, April 28, 2022 4:37 PM
To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>; Herndon, T. Mason
<tmherndon@ncdot.gov>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>
Subject: RE: [External] RE: BR-0139 NC 133 Pipes to Bridge near Funston Rd
The DCM concurs with the Corps comments enclosed below and would be supportive
of some level of mitigation credit for the existing fill causeway removal. Please keep
me in the loop on this project as it develops and let me know if I may be of further
assistance.
Thanks,Stephen
From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil>
Sent: Thursday, April 28, 2022 3:02 PM
To: Herndon, T. Mason <tmherndon@ncdot.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>;
Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>
Subject: [External] RE: BR-0139 NC 133 Pipes to Bridge near Funston Rd
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Mason,
Once you address the tail at station 18+64, the Corps doesn’t have any concerns. I applaud the
Department in their efforts to better the system as a whole despite it really not providing any benefit
directly to the project.
As we have discussed previously, we hope to be able to provide some level of mitigation credit from
the roadway removal as it may provide an ecosystem uplift.
Thanks for letting us review,
Brad
Brad Shaver
Project Manager
US Army Corps of Engineers
69 Darlington Ave
Wilmington, NC 28403
(910) 251-4611
The Wilmington District is committed to providing the highest level of support to the public.
To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located
at:
https://regulatory.ops.usace.army.mil/customer-service-survey/
From: Herndon, T. Mason <tmherndon@ncdot.gov>
Sent: Wednesday, April 27, 2022 3:34 PM
To: Lane, Stephen <stephen.lane@ncdenr.gov>; Shaver, Brad E CIV USARMY CESAW (USA)
<Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>
Subject: [Non-DoD Source] BR-0139 NC 133 Pipes to Bridge near Funston Rd
We’ve been working with HNTB to come up with a design to replace the three culverts on NC 133
where we have flooding issues in the coastal wetlands section. The original design was 6 spans at
60 ft and we are know proposing 7 spans at 55 ft to avoid/minimize impacts to the coastal wetlands
to the MEP, maintain top down construction and avoid having end bents in poor quality soils. We
have also been trying to determine the best plan for removing the roadway to improve the natural
flow patterns of the adjacent wetlands and improve water quality, improve habitat, improve aquatic
and wildlife passage and give the Department an opportunity for potential onsite mitigation to
offset impacts and cost. Even though the additional bridge length will cost ~$112,000.00 I’ve gotten
everybody onboard to go with the revised design. Attached is the current proposal and cross
sections showing what we feel is the best proposal. Yes, there will be some temporary (beneficial)
impacts to the existing coastal wetlands with the proposed excavation but we feel this will be an
overall benefit to the system and checks all of our goals listed above.
Also, I almost forgot, on the plan view you will see where the excavation limits tail away from the
bridge at 18+64. I have discuss this with HTNB and we will be pulling this in substantially by taking
the proposed excavation up to natural ground with a 4:1 slope or flatter closer to the bridge.
Please review the attached plans and let me know if you have any comments or concerns.
Thank you!
Mason Herndon
Project Development Environmental Engineer
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.