Loading...
HomeMy WebLinkAbout20140428 Ver 1_Emails_20140430 Higgins, Karen From:Kelly W. Sackheim <kelly@kchydro.com> Sent:Wednesday, April 30, 2014 7:24 AM To:Young, Michael A SAW; Banaitis, Carol M SAW; Goudreau, Chris J.; Tarver, Fred; Matthews, Monte K SAW; Burdette, Jennifer a; Higgins, Karen; Deamer, Nora; Matics, Dana L SAW; John Ellis; Williams, Greg L SAW; Fritz Rohde - NOAA Federal Cc:Bulleri, Michael; Waldroup, Kenneth; LackeyKA@bv.com Subject:Next Steps before May 5, 2014 for FERC P-14521 Falls Lake 2-yr Licensing Application I sincerely thank you for taking the time to meet, and your feedback that will likely allow me to proceed with FERC's 2-yr licensing pilot rather than the FERC Traditional Licensing Process (TLP) that was used by the City of Raleigh in its investigation of the hydroelectric development potential of this site, or the FERC Integrated Licensing Process (ILP) designed to address complex environmental issues, but more unwieldy for a small, simple project such as the existing infrastructure and operational parameters accommodate at Falls Lake Dam. I met with FERC staff yesterday and reviewed that, rather than making it a priority to obtain a FERC license before expending effort to meet other requirements to construct and subsequently generate electricity at Falls Lake Dam, I intend to focus concurrently on obtaining Corps 408 authorization. The FERC two-year process plan envisions the filing of a final license application within one year, after completing studies and applying for for water quality and coastal zone certifications, then FERC issuance of its draft Environmental Assessment and associated draft programmatic agreement (PA), section 10(j) letter, and section 7 ESA informal consultation letter, as necessary, approximately 8 months later. The FERC two-year process plan appears more than adequate to address concerns associated with the integration of the proposed hydroelectric project into environmental protection and enhancement plans pursued by the Corps and other resources agencies at this site. No inherent conflicts have been identified between the Corps 408 process and the FERC two-year process plan. In the presumably unlikely event that the Corps finds that staff are overburdened by undertaking both processes simultaneously, I propose that the response deadlines for the FERC two-year process plan be relaxed. The FERC requires that I include in my application by the May 5 deadline (this coming Monday), two elements: 1. A written statement from the federal dam owner that my proposed "plan of development is conceptually feasible." Tony or Carol - would you be able to convey to me by e-mail an affirmation that my proposal to install hydroelectric generating facilities inside the existing intake structure at Falls Lake Dam is conceptually feasible? Clearly, to ultimately obtain approval, the engineering design will need to ensure that flood flow discharge capacity is not diminished (presumably by raising equipment that would impede flow out of the water's path), that flows would remain available as required for safe downstream and eventual upstream fish passage, and downstream water quality would not be diminished by electric generation. 2. Written comments from "federal and state resource agencies, Indian tribes, nongovernmental organizations, and the public" on the adequacy of available information and the need for studies, including the anticipated scope and duration of the studies. While I will summarize the input that you provided at our meeting last week, as well as the comments provided previously in the record of the City of Raleigh's evaluation of this same project, should you have any further 1 comments that you would like to convey, I will transmit them to the FERC as well. Once again, thank you for your participation in the review of this project. Sincerely, Kelly Sackheim Principal, KC Hydro family of companies travel ph: (916) 877-5947 (-kwhs, reliably receives cell texts but not necessarily without considerable delay) nationwide ph: (301) 401-5978 (-kws8) fax: (603) 571-5947 www.kchydro.com On 4/10/2014 4:42 PM, Kelly W. Sackheim wrote Re: Confirming 10 am @ Falls Lake Dam Re: April 24, 2014 Participation Requested: FERC P-14521 Falls Lake 2-yr Licensing Meeting: The Corps has graciously offered their conference room at Falls Lake, and morning seems to be possible for those who have replied thus far. As some will be traveling several hours, I would like to set the meeting for 10 am, with the expectation that we should be able to conclude by lunchtime, although I would welcome the opportunity for further discussion as may be productive. 2