Loading...
HomeMy WebLinkAbout20140276 Ver 1_More Info Received_20140501Homewood, Sue From: Carl von Isenburg <cvi @geotec com> Sent: Thursday, May 01, 2014 126 PM To: Homewood, Sue, John t thomasjr @saw02 usace army mil Cc: Steve Causey, Jack Fitzgerald Subject: Fairhaven PCN Attachments: 13 372 PCN Revised 050114 pdf Sue, John, I have again modified the PCN, specifically at 63e and D1b, to reflect comments by Sue and to clarify a point about equipment Please let me know if there are other changes you would like to see Carl B. Project Information and Prior Project,History 1. Propert� Identification 1 a. Property identification no. (tax PIN or parcel ID): 5885-94-3308.00, 1b. Site coordinates-(in decimal degrees): LMitud6,-36 05.2174 Longitude: 80,23.24.1,1 (DO DIDDIDIDD) (-DD DDODDD) 1c. Property size 9A acres 2. SurfaceWatem 2a. Name of nearest body of water (stream, river, etc to Reynolds,Creek ,proposed project 2b 'Water Quality Classification of nearest receiving water: perennial 2c. 'River-basin: map is available at Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land-use in the vicinity of the project at the time of this Site and-majority of surrounding area are sing!6 family use. 3b. List the total estimated acreage of.all existing wetlands on the property.' 3c List the total estimated linear feet,of all'existing streams (intermittent and perennial) on the property, 3d. Explain the purpose of the proposed project: Repair damage from erosion and protect threatened I 5� sewer line 3e. Describe the overall project in detail,' including Ike type of equipment to be used, Hairpin bend in the stream will be-flattened and both'insi , de and outside banks will be repaired and reinforced. Equipment will,include 1-2 Bobcat size earth movers, possibly,a track hoe, possibly 6" portable pump(s) for temporary pump around Page 3cf12 PCN Form — Version 1.3 December 10,2OOOVersion D. Impact.Justification,and Mitigation 1: Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed1mpacts in designing project. The new alignment was chosen to,minimize stream impact "b; Specifically describe measures taken to avoid or'minimize 'the proposed impacts through construction techniques, Approximately 20- 25oft.,of the excavation can be done in the dry The remainder is in the,streambed and banks and will be -in the wet Pump around will work only, for periods with no,rain. The project duration is such that it is unlikely to, avoid rain The contractor will'bb °instructed °to do best, effoi't §.to.deflect We 'maionty of the flow away`feom the banKwhen-the work is being done at the toes of:the.blhks 2. Compensatory Mitigation for Impacts to Waters of the U.S. -or Waters of the State 2a Does the project'require Compensatory Mitigation for impacts to Waters of the U.S. or'Waiers of the,_State? ❑ Yes- 0 No 2b. If yes, mitigation is required by,(check,all that,apply): ❑ DWQ ❑ Corps 2c'. If,yes, which mitigation option will be used for this ,project? ❑ Mitigation bank ❑ Payment to in -heu fee program - ❑ 'Permittee Responsible.Mdigation 3. Complete if Using a Mitigation Bank 3a ,Name of Mitigation Bank. 3b' Credits Purdhaseflattach;receipt and_letteir) T,YPe Quantity 3c Comments - 4. Complete if•Making a Payment to lin -lieu Feb Program 4a. Approval letter from in '-lieu fee program is,attached ❑ Yes, Stream mitigation requested:- linear feet Ac. Ifusing stream mitigation, stream'temperature: ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ=only), square feet Ae. Riparian wetland mitigation requested: acres 4f, Non - riparian wetiand,mitigation requested: acres '4g. Coastal (tidal),wetland mitigation-requested: acres, ,4h, Comments: Page 8 of 12 PCN Form — Version 1.3 December 10, 2608 Version