Loading...
HomeMy WebLinkAbout20140420 Ver 1_401 Application_20140414STROUD ENGINEERING, P.A. Hestron Plaza Two 151 -A Hwy. 24 MOREHEAD CITY, NC 28557 DATE Jr NO 252) 247 -747 ATTENTION 1 �� 1i k � 7 F TO, ors V - � M jk ; s , WE ARE SENDING YOU 4 Attached ❑ Under separate cover via the followtn- items • Shop drawings ❑ Prints ❑ Plans • Copy of letter ❑ Change order ❑ I ❑ Samples 9 ❑ Specifications THESE ARE TRANSMITTED as checked below i For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS d : 9 v fF i DENR"r i���ya 'y yq6 V9q}1 Jeri "r COPY TO SIGNED If enclosures are not as noted, kindly notify us at once. 1 C4 I �-1 1'� — Y �i 6 t �- �'u 1 11 �ji ` 1 IU w i� `u D•t o �_.J �1 r- �A S 2�9 0 THESE ARE TRANSMITTED as checked below i For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS d : 9 v fF i DENR"r i���ya 'y yq6 V9q}1 Jeri "r COPY TO SIGNED If enclosures are not as noted, kindly notify us at once. 1 W A T �9QG T 1 >r-i 2 0 1 4 0 4 2 0 o�OF �0 PAPAM Office Use Only M Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form — Version 14 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number N/A or General Permit (GP) number N/A 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular X❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes XN No For the record only for Corps Permit ❑ Yes ❑ No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes NX No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1h below Yes ❑ No 1 h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a Name of project Anna Wink Mine #2 2b County Carteret 2c Nearest municipality / town Newport 2d Subdivision name N/A 2e NCDOT only, T I P or state project no N/A 3. Owner Information 3a Name(s) on Recorded Deed Larry Styron -- 3b Deed Book and Page No 913 -399 3c Responsible Party (for LLC if applicable) N/A 3d Street address PO Box 1599 [A 3e City, state, zip Newport, NC 28570 - �� §;auAi eTY 3f Telephone no (252) 422 - 8404" _� w 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 14 January 2009 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5. Agent/Consultant Information (if applicable) 5a Name Andy Munday 5b Business name (if applicable) Stroud Engineering, PA 5c Street address 151A HWY 24, Hestron Plaza Two 5d City, state, zip Morehead City, NC 28557 5e Telephone no (252) 247 -7479 5f Fax no (252) 247 -4098 5g Email address amunday @stroudengineer corn Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property Identification no (tax PIN or parcel ID) PIN 632803022610000 1b Site coordinates (In decimal degrees) Latitude N 3 - y-i -py Longitude \(,/ -4l9 - 5t9 - ()$ 1 c Property size 2727 acres 2. Surface Waters 2a Name of nearest body of water to proposed project Southwest Prong, Newport River 2b Water Quality Classification of nearest receiving water Class C 2c River basin White Oak Basin 3. Project Description 3a This Describe the existing conditions on the site and the general land use In the vicinity of the project at the time of this application area is currently farmland 3b List the total estimated acreage of all existing wetlands on the property 0 4 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project Construct a sand mining operation approximately 10 acres in size 3e Describe the overall project In detail, including the type of equipment to be used Equipment used will include track hoe, back hoe, dump truck and dewatering pump 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ro ect includin all rlor hases In the ast? ❑X Yes ❑ No ❑ Unknown Comments Wetlands map has been sent to Christy Wicker 4b If the Corps made the jurisdictional determination, what type of determination was made? x❑ Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (If known) Christy Wicker Agency /Consultant Company Other Land Management Group, Inc 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation A preliminary survey of flagged wetlands is attached 5. Project History 5a Have permits or certifications been requested or obtained for this project (Including all prior phases) in the past? X❑ Yes ❑ No ❑ Unknown 5b If yes, explain in detail according to "help file" Instructions Mining Permit Application and Stormwater Permit 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form - Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) X❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 P Fill Small -Basin Wetland No DWQ 001 W2 P Fill Small -Basin Wetland No DWQ 002 W3 P Fill Small -Basin Wetland No DWQ 01 W4 P Fill Small -Basin Wetland No DWQ 006 W5 P Fill Small -Basin Wetland No DWQ 008 W6 - Choose one Choose one Yes /No 2g Total Wetland Impacts: 027 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one - S2 Choose one - S3 Choose one - S4 - Choose one - S5 Choose one - S6 - Choose one 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivi ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose O2 Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total: 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mite ation, then vou MUST fill out Section D of this form 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number— Permanent (P) or Temporary T 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 Yes /No B2 Yes /No B3 - Yes /No B4 - Yes /No 135 - Yes /No 136 - Yes /No 6h Total Buffer Impacts: 61 Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed Impacts in designing project A 100 ft plus buffer will be maintained around the wetlands until such time permission is granted to fill these wetlands The Skaggs Lateral Effect came to 78 6 feet so a 100 ft plus buffer would be adequate The 0 13 AC Jurisdictional wetland will maintain a 100 ft plus buffer The total impacted wetland area comes to 0 27 Acres total lb Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques Impacts will be minimized through maintaining buffers 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State? ❑ Yes ❑x No 2b If yes, mitigation Is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from In -lieu fee program Is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes X❑ No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 2b Does this project require a Stormwater Management Plan? 0 Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan Stormwater plan employs bank stabilization, seeding, sediment trap with vegetated filter and site inspections 2e Who will be responsible for the review of the Stormwater Management Plan? NCDENR 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been El Yes X❑ No attached? 4. DWQ Stormwater Program Review EgCoastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 -246 ❑Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? X❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project Involve an expenditure of public (federal /state /local) funds or the ❑ Yes X❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, El Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? El Yes ❑X No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description There will be no impacts since there is no development 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility There will be no wastewater generated Page 9 of 10 PCN Form — Version 1 4 January 2009 6. Endangered Species and Designated Critical Habitat (Corps Requirement) , 5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes X❑ No impacts? 5c If yes, indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Environmental Conservation Online System 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Environmental Conservation Online System 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes X❑ No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NC Office of State Archeology 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes X❑ No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Flood Map #3720632800J Larry Styron April 16, 2014 Applicant/Agent's Printed Name Date Applic Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 Lateral—Effect—Summary - -- Lateral Effect Program summary- - Application of Skaggs Method Copyright 2006 -2013. Brian D Phillips, R wayne Skaggs, G M chescheir North Carolina State University Dept of Biological & Agricultural Engineering version: 2.7.1.0 Project Run Date and Time: 4/11/2014 11:23:02 AM Output Filename: M:\ PUBLIC\ MASTER \DRAWINGS \700'5\ 756 \PM756 \PM756 - 9002 \LateralEffect \outputs \Lateral_ Effect_summary.txt Project Information Project : Anna wink Mine #2 User: Andy Munday Company / Agency: Stroud Engineering Department: Engineering Project Location: Newport NC Project coordinates: Soil ID: Norfolk loamy fine sand Notes: Site Parameters ------------------------------------------------------------ - - - - -- state: North—Carolina County: Carteret Surface Storage: 2 in (5.0 cm) Ditch Depth or Depth to water surface: 6 ft Depth to Restrictive Layer: 12 ft Drainable Porosity: 0.11 Hydroperiod: 14 days User defined T25 or Built In T25: DEFAULT T25 value: 4.2 days User defined Conductivity or soil survey Conductivity: USER weighted Hydraulic Conductivity: 2.0000 in /hr Hydraulic Conductivity Bottom Depth in Layer 1 144 Layer 2 0 Layer 3 0 Layer 4 0 Layer 5 0 Layer 6 0 Layer 7 0 Layer 8 0 Data by Layer Conductivity in /hr 2.0 0 0 0 0 0 0 0 ---------------------------------------------- Lateral Effect: 78.6 ft ---------------------------------------- - - - - -- Page 1