Loading...
HomeMy WebLinkAboutNCC203387_NOT Closeout Documents_20220421North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Guilford Project: North Greensboro Tie Substation River basin: Cape Fear Person financially responsible: Duke Energy Corp - Michael D Robinson Project #: GUILF-2020-044 Address: PO Box 1006, Charlotte, NC 28201 1. Project Location: Derby Place, Greensboro Pictures: No 2. Weather and soil conditions: 70's, Clear, Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: April 18, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Turney Others present: Date of inspection: April 06, 2022 Time arriving on site: 1:00 PM Time leaving site: 2:00 PM