HomeMy WebLinkAboutNC0056201_Compliance Evaluation Inspection_20220411ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
T3t Willow Oaks LLC
Attn: Michael Brown
1150 Hungry Neck Blvd, Ste 359
Mt Pleasant, SC 29464
NORTH CAROLINA
Environmental Quality
April 11, 2022
SUBJECT: Compliance Evaluation Inspection
Countryside Mobile Home Park WWTP
NPDES Permit Number NC0056201
Randolph County
Dear Mr. Brown:
Mr. Ron Boone, of the NC Division of Water Resources (NCDWR), Winston-Salem Regional
Office (WSRO), conducted a compliance evaluation inspection of the Countryside Mobile Home
Park wastewater treatment plant, on March 16, 2022. Mr. Boone met with Paul Smith, Operator in
Responsible Charge, along with Kevin Davidson, with Agri -Waste Technologies, Inc., and Steve
Barry, with AQWA, Inc. Their assistance and cooperation were greatly appreciated. Inspection
findings are detailed in the attached Water Compliance Inspection Report and summarized below.
The existing activated sludge package plant has been replaced with an Orenco Advantex Ax-Max
treatment system. The new system is complete and in full operation. The old plant has been
demolished and removed. The plant classification will be downgraded from a class II plant to a
class I plant. Mr. Boone noted no issues, deficiencies, or violations during the inspection.
Documentation is complete and compliant. Please note that all operational documentation must be
kept by the permittee for a period of three years and all analytical documentation must be kept by
the permittee for 5 years. It is therefore your responsibility to acquire from the operators, labs, and
anyone else who holds such documentation, on your behalf, and maintain all such documentation
in your own files. Failure to do so is a violation of the permit.
Please be aware that the Division may take enforcement action against any permittee who fails to
comply with any requirement of their permit. Pursuant to NC General Statute (NCGS) 143-215.6A,
a civil penalty of not more than twenty-five thousand dollars ($25,000.00) may be assessed against
any person who violates or fails to act in accordance with the terms, conditions, or requirements
of any permit issued pursuant to G.S. 143-215.1.
GDE
NORTH C CLI JA '
D. mmmr� .orennt o�.i
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
If you have any questions or concerns, please do not hesitate to contact Mr. Boone by phone at
336-776-9690, or by email at ron.boone@ncdenr.gov. Thank you in advance for your time and
attention to this matter.
Attachments:
1. Water Compliance Inspection Report
2. Rich CoAngelo, Owner, via email
rich@trubild.com
cc: Laserfiche
D_E
NORTH CARCLINA
gaparMeM of Environment,/quay
Sincerely,
DocuSigned by:
0D2D3CE3F 167456
Jennifer F. Graznak, Assistant Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Raleigh, North Carolina 27105
336.776.9800
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction
1 IN
Code
I 2
IL
NPDES yr/mo/day Inspection Type Inspector Fac
I 3 I NC0056201 111 121 22/03/16 117 1810I 19I S I 2011
Type
21IIIIII
IIIIIIIIIII
IIIIIII
I
IIIIII
IIIIIIIIIII
P6
Inspection
671
Work Days
Facility Self -Monitoring
I 70I
Evaluation Rating
I 711
B1
1
72
QA
I N I
73I
1
I I
Reserved
74 71
I
I I
I
I
I
180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES oermit Number)
Countryside Mobile Home Park WWTP
3425 Roy Farlow Rd
Sophia NC 27350
Entry Time/Date
11:30AM 22/03/16
Permit Effective Date
19/02/01
Exit Time/Date
12:30PM 22/03/16
Permit Expiration Date
24/01/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Paul Matthew Smith/ORC/336-932-9347/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Eric Fairman,W Bloomfield Acres LLC Royal Oak MI
48067//248-399-7755/2483999975 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone DWR/WSRO WQ/336-776-9690/
c—DocuSigned by: 4/11/2022
',valet 13oosve,
Signature of
Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
[-DocuSigned by:
. 4... �tik DWR/WSRO 336-776-9695 4/11/2022
OD2D3CE3F1 B7456...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
N C 0056201 111 121 22/0 3/ 16
I17
Inspection Type
18 [j
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Ron Boone, of the NC Division of Water Resources (DWR), Winston-Salem Regional Office, met with
Paul Smith, Operator in Responsible Charge, Kevin Davidson, with Agri -Waste Technology, Inc, and
Steve Barry, with Aqwa, Inc, on 3/16/2022, to perform a compliance evaluation inspection of the
Countryside Mobile Home Park wastewater treatment plant. Below is a summary of the inspection
findings.
The old activated sludge package plant has been demolished and completely removed. The new
Orenco AdvanTex AX-Max Treatment System is now in full operation. The engineer's certificate of
completion has been received in the Winston-Salem Regional Office. The new system consists of two
10,000 gallon step tanks that provide primary treatment, one 10,000 gallon equalization tank, two
Orenco AdvanTex AX-Max Treatment units, which can be operated in parallel or in series, and a
Sanitron UV disinfection system, along with all pumps, valves, piping, controls, and other
appurtenances, to make a complete and operational wastewater treatment system.
Mr. Boone noted no concerns with the new treatment system. The new system wil be downgraded to
a class I treatment facility. The engineer's certification was just recently received in the
Winston-Salem Regional office.
Documentation is complete and compliant. Please note that all operational documentation must be
kept by the permittee for a period of three years and all analytical documentation must be kept by the
permittee for 5 years. It is therefore your responsibility to acquire from the operators, labs, and
anyone else who holds such documentation, on your behalf, and maintain all such documentation in
your own files. Failure to do so is a serious violation of the permit.
Page# 2
Permit: NC0056201
Inspection Date: 03/16/2022
Owner - Facility: Countryside Mobile Home Park WWTP
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • El El El
Comment: None
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment: None
Laboratory
Are field parameters performed by certified personnel or laboratory?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
•
• ❑ ❑ ❑
• ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
Page# 3
Permit: NC0056201
Inspection Date: 03/16/2022
Owner - Facility: Countryside Mobile Home Park WWTP
Inspection Type: Compliance Evaluation
Laboratory
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Comment: None
Yes No NA NE
II El El El
❑ ❑ ❑ •
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ • ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? • El El El
Is the tubing clean? El El • El
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 ❑ ❑ ❑ •
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type • El El El
representative)?
Comment: None
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, El El El
and sampling location)?
Comment: None
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures? • ❑ ❑ ❑
Is the wet well free of excessive grease? El El El •
Are all pumps present? • El El El
Are all pumps operable? • El El El
Are float controls operable? • El ❑ ❑
Is SCADA telemetry available and operational? • El El El
Is audible and visual alarm available and operational? • El El El
Comment: None
Page# 4
Permit: NC0056201
Inspection Date: 03/16/2022
Owner - Facility: Countryside Mobile Home Park WWTP
Inspection Type: Compliance Evaluation
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Comment: None
Septic Tank
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
Comment: None
Disinfection - UV
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Comment: None
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: Meter is an inline meter with totalizer. No chart recorder.
Yes No NA NE
❑ • ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ • ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 5
Permit: NC0056201
Inspection Date: 03/16/2022
Owner - Facility: Countryside Mobile Home Park WWTP
Inspection Type: Compliance Evaluation
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: None
Yes No NA NE
• ❑ ❑ ❑
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable MODE
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Yes No NA NE
❑ ❑ ❑ •
❑ ❑ • ❑
• ❑ ❑ ❑
Comment: Generator not completely operational yet at the time of the inspection. Generator runs
on natural gas.
Page# 6