SUBJECT: Compliance Evaluation Inspection & Notice of Deficiency
NOD #: NOD-2022-PC-0054
Sunrise Park Wastewater Treatment Plant
NPDES Permit Number NC0041483
Guilford County
Dear Mr. Davis:
Mr. Ron Boone, of the NC Division of Water Resources (NCDWR), Winston-Salem Regional
Office (WSRO), conducted a compliance evaluation inspection of the Sunrise Park wastewater
treatment plant, on March 24, 2022. Mr. Boone met with you and Glenn Price, Operator in
Responsible Charge (ORC). Your assistance and cooperation was greatly appreciated. Inspection
findings are detailed in the attached Water Compliance Inspection Report and summarized below.
- Although fully operational, the plant could use some additional repairs/maintenance.
- The filters walls are caving in and must be repaired/replaced as soon as possible.
- The filter media is very old and may soon be ready for replacement. The operators should
closely monitor its treatment efficiency.
- You should consider using some type of flow diffusers on the lateral line orifices. Currently,
when the pump turns on, the water sprays from each orifice in a single solids stream,
minimizing the filter surface area each orifice output actually makes contact with. Diffusers
would diffuse the spray of water much better and allow more filter surface area to be used.
This is a form of short-circuiting, and is one reason the flow ponds on the top of the filter in
specific areas.
- The UV disinfection appears to be working properly and in good condition. There are a few
extra bulbs available on site. The operator can use chlorination/dechlorination tablets as a
backup disinfection system.
- The effluent appears clear with no solids, foam, or foul odor. The receiving stream looks good.
The operator uses the park's water meter to estimate wastewater plant effluent flow.
- Septic tanks are pumped on an as -needed basis.
All reviewed documentation was compliant and all required documentation was readily
available, complete, and current.
Mr. Boone noted no other concerns, deficiencies, or violations.
GDE
NORTH C CLI JA '
D. mmmr� .orennt o�.i
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
Please be aware that the Division may take enforcement action against any permittee who fails to
comply with any requirement of their permit. Pursuant to NC General Statute (NCGS) 143-215.6A,
a civil penalty of not more than twenty-five thousand dollars ($25,000.00) may be assessed against
any person who violates or fails to act in accordance with the terms, conditions, or requirements
of any permit issued pursuant to G.S. 143-215.1.
If you have any questions or concerns, please do not hesitate to contact Mr. Boone by phone at
336-776-9690, or by email at ron.boone@ncdenr.gov. Thank you in advance for your time and
attention to this matter.
Attachments:
1. Water Compliance Inspection Report
cc: Laserfiche
D_E
NORTH CARCLINA
gaparMeM of Environment,/quay
Sincerely,
DocuSiiggned by:
tJM;tCP
145B49E225C94EA...
Lon T. Snider, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Raleigh, North Carolina 27105
336.776.9800
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction
1 IN
Code
I 2
IL
NPDES yr/mo/day Inspection Type Inspector Fac
I 3 I NC0041483 111 121 22/03/24 117 1810I 19I S I 2011
Type
21IIIIII
IIIIIIIIIII
IIIIIII
I
IIIIII
IIIIIIIIIII
P6
Inspection
671
Work Days
Facility Self -Monitoring
I 70I
Evaluation Rating
I 711
B1
1
72
QA
I N I
73I
1
I I
Reserved
74 71
I
I I
I
I
I
180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Sunrise Park
5625 Newman Davis Rd
Greensboro NC 27406
Entry Time/Date
10:OOAM 22/03/24
Permit Effective Date
22/01/01
Exit Time/Date
11:30AM 22/03/24
Permit Expiration Date
26/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Glenn Fredrick Price/ORC/336-408-7924/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Stephen R Davis,PO Box 2153 Asheboro NC 272042153//336-302-7517/3366290636
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone DWR/WSRO WQ/336-776-9690/
1- DocuSigned by:
osier et Boo.ue, 4/25/2022
n9nPRnl9F90'2ARn
Signature
of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
rDocuSigned by:
T. SAAtt- 4/25/2022
145B49E225C94 EA...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
sI
NPDES yr/mo/day
N C0041483 111 121 22/03/24
I17
Inspection Type
18 [j
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Mr. Ron Boone, of the NC Division of Water Resources (NCDWR), Winston-Salem Regional Office
(WSRO), conducted a compliance evaluation inspection of the Sunrise Park wastewater treatment
plant, on March 24, 2022. Mr. Boone met with you and Glenn Price, Operator in Responsible Charge
(ORC). Your assistance and cooperation was greatly appreciated. Inspection findings are detailed in
the attached Water Compliance Inspection Report and summarized below.
- Although fully operational, the plant could use some additional repairs/maintenance.
- The filters walls are caving in and must be repaired/replaced as soon as possible.
- The filter media is very old and may soon be ready for replacement. The operators should closely
monitor its treatment efficiency.
- You should consider using some type of flow diffusers on the lateral line orifices. Currently,
when the pump turns on, the water sprays from each orifice in a single solids stream, minimizing
the filter surface area each orifice output actually makes contact with. Diffusers would diffuse
the spray of water much better and allow more filter surface area to be used. This is a form of
short-circuiting, and is one reason the flow ponds on the top of the filter in specific areas.
- The UV disinfection appears to be working properly and in good condition. There are a few extra
bulbs available on site. The operator can use chlorination/dechlorination tablets as a backup
disinfection system.
- The effluent appears clear with no solids, foam, or foul odor. The receiving stream looks good.
- The operator uses the park's water meter to estimate wastewater plant effluent flow.
- Septic tanks are pumped on an as -needed basis.
- All reviewed documentation was compliant and all required documentation was readily available,
complete, and current.
Mr. Boone noted no other concerns, deficiencies, or violations.
Page# 2
Permit: NC0041483
Inspection Date: 03/24/2022
Owner - Facility: Sunrise Park
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • El El El
Comment: None
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment: None
Laboratory
Are field parameters performed by certified personnel or laboratory?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
•
• ❑ ❑ ❑
• ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
Page# 3
Permit: NC0041483
Inspection Date: 03/24/2022
Owner - Facility: Sunrise Park
Inspection Type: Compliance Evaluation
Laboratory Yes No NA NE
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Comment: None
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ • ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? El ❑ ❑ ❑
Is the tubing clean? El El • El
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 ❑ ❑ ❑ •
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type El El El •
representative)?
Comment: None
Flow Measurement - Influent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: Park's water meter is used to report flow.
Septic Tank
(If pumps are used) Is an audible and visual alarm operational?
Is septic tank pumped on a schedule?
Are pumps or syphons operating properly?
Are high and low water alarms operating properly?
Comment: Tanks are pumped on an as needed basis.
Yes No NA NE
• ❑ ❑ ❑
❑ ❑ • ❑
Yes No NA NE
❑ ❑ • ❑
Page# 4
Permit: NC0041483
Inspection Date: 03/24/2022
Owner - Facility: Sunrise Park
Inspection Type: Compliance Evaluation
Sand Filters (Low rate)
(If pumps are used) Is an audible and visible alarm Present and operational?
Is the distribution box level and watertight?
Is sand filter free of ponding?
Is the sand filter effluent re -circulated at a valid ratio?
# Is the sand filter surface free of algae or excessive vegetation?
# Is the sand filter effluent re -circulated at a valid ratio? (Approximately 3 to 1)
Yes No NA NE
❑ • ❑ ❑
❑ • ❑ ❑
• ❑ ❑ ❑
❑ • ❑ ❑
Comment: Filter walls are caving in and must be repaired/replaced. Filter media appears very old
and may need replacement. These are repeat findings from the previous inspection of
2018. The filter would probably be even more efficient if the flow was better diffused
across the surface area of the filter. It currently sprays out in solid streams from each
orifice in the lateral pipes so the contact area on the filter surface for each orifice is
minimal. It could be made much better with diffusers of some type.
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site? • ❑ ❑ ❑
Are UV bulbs clean? • ❑ ❑ ❑
Is UV intensity adequate? • ❑ ❑ ❑
Is transmittance at or above designed level? • El El El
Is there a backup system on site? • ❑ ❑ ❑
Is effluent clear and free of solids? • ❑ ❑ ❑
Comment: Operator uses chlorine and dechlorination tablets as needed as a backup method of
disinfection.
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: None
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable MOE ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None