HomeMy WebLinkAboutNCC210959_NOT Closeout Documents_20220418<CS Greenville
NOV NORT1-1 CAROLINA
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
April 1, 2022
Letter of Final Inspection
Dillard Wallace
Lot # 178 Irish Creek
109 Blackwater Drive
Greenville, NC 27834
Re: Project Name: Lot # 178 Irish Creek
Project Number: ESCP-2021-0005
County: Pitt
Disturbed Acreage:
Responsible Party:
Dear Mr. Wallace,
0.23
Dillard Wallace Construction
At your request, this office has completed its final site inspection of the referenced project. We
found the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCGO1 permit.
Please do not hesitate to call if you have any questions.
Respectfully,
Victor C. Long
Engineering Assistant III
Engineering Department
City of Greenville
vlong@greenvillenc.gov
www.greenvillene.gov
252-329-4888
252-329-4467 1500 Beatty Street, Greenville,. NC 27835-7207 greE:m' flenc.go
City of Greenville
Engineering Department
Land Development Division
252-329-4467
SOIL EROSION AND SEDIMENTATION CONTROL INSPECTION REPORT
Re ort No. 22.03.2202 Date Inspected: 3-22-22 _
Piv'ect Name: 109 Blackwater Dr Location:
Weather Conditions: SunnySoil Conditions: Dr
Contact For Erosion Issues: Seth Anderson Contractor: Dillard Wallace Construction
Financiall Res onsible Party: Dillard Wallace Construction
PROJECT AND SITE CONDFFIOVS
Yes Is Site In Compliance with the Ordinance Yes Are Erosion Control Measures Properly Maintained
No Is Site Currently Under Notice of Violation No Has Off Site Sedimentation Occurred
n/a Have Previous Violations Been Corrected No Were Pictures Taken
TVPE OF VIOLATION
❑ No Approved Plan, City Code 9-8-5(a) ❑ Inadequate Buffer Zone, City Code 9-8-7(1)(a)
❑ Failure to Follow Approved Plan, City Code 9-8-170) ❑ Graded slopes and fills too steep, City Code 9-8-7(2)
❑ Revised Plan Required, City Code 9-8-20(b)(9) ❑ Unprotected exposed slopes, City Code 9-8-7(2)
❑ Failure to Provide Adequate Ground Cover Cit Code 9-8-7(2), 3 ElFailure to maintain erosion control measures, City Code 9-8-13
❑ Insufficient measures to retain sediment on site
City Code 9-8-20 b ❑ Other: (describe) Click here to enter text.
❑ Failure to take all reasonable measures, City Code 9-8-5(b)
DESCRIPTION OF SITE CONDITIONS:
Site is stabilized; whole yard sodded.
PREVENTATIVE ACTIONS TO CONSIDER:
CORRECTIVE ACTIONS REQUIRED:
[!IA
DEADLINE FOR COMPLETION OF CORRECTIVE ACTIONS: N/A Copies to:
® Contractor
❑ Financially Responsible Party
❑ Engineer
Report By: Tyler Averett Phone: 252-329-4828 Date: 3/22/22