Loading...
HomeMy WebLinkAboutNCC210959_NOT Closeout Documents_20220418<CS Greenville NOV NORT1-1 CAROLINA ENGINEERING Engineering Department-Sedimentation/Erosion Control Program April 1, 2022 Letter of Final Inspection Dillard Wallace Lot # 178 Irish Creek 109 Blackwater Drive Greenville, NC 27834 Re: Project Name: Lot # 178 Irish Creek Project Number: ESCP-2021-0005 County: Pitt Disturbed Acreage: Responsible Party: Dear Mr. Wallace, 0.23 Dillard Wallace Construction At your request, this office has completed its final site inspection of the referenced project. We found the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this project and you will need to terminate your NCGO1 permit. Please do not hesitate to call if you have any questions. Respectfully, Victor C. Long Engineering Assistant III Engineering Department City of Greenville vlong@greenvillenc.gov www.greenvillene.gov 252-329-4888 252-329-4467 1500 Beatty Street, Greenville,. NC 27835-7207 greE:m' flenc.go City of Greenville Engineering Department Land Development Division 252-329-4467 SOIL EROSION AND SEDIMENTATION CONTROL INSPECTION REPORT Re ort No. 22.03.2202 Date Inspected: 3-22-22 _ Piv'ect Name: 109 Blackwater Dr Location: Weather Conditions: SunnySoil Conditions: Dr Contact For Erosion Issues: Seth Anderson Contractor: Dillard Wallace Construction Financiall Res onsible Party: Dillard Wallace Construction PROJECT AND SITE CONDFFIOVS Yes Is Site In Compliance with the Ordinance Yes Are Erosion Control Measures Properly Maintained No Is Site Currently Under Notice of Violation No Has Off Site Sedimentation Occurred n/a Have Previous Violations Been Corrected No Were Pictures Taken TVPE OF VIOLATION ❑ No Approved Plan, City Code 9-8-5(a) ❑ Inadequate Buffer Zone, City Code 9-8-7(1)(a) ❑ Failure to Follow Approved Plan, City Code 9-8-170) ❑ Graded slopes and fills too steep, City Code 9-8-7(2) ❑ Revised Plan Required, City Code 9-8-20(b)(9) ❑ Unprotected exposed slopes, City Code 9-8-7(2) ❑ Failure to Provide Adequate Ground Cover Cit Code 9-8-7(2), 3 ElFailure to maintain erosion control measures, City Code 9-8-13 ❑ Insufficient measures to retain sediment on site City Code 9-8-20 b ❑ Other: (describe) Click here to enter text. ❑ Failure to take all reasonable measures, City Code 9-8-5(b) DESCRIPTION OF SITE CONDITIONS: Site is stabilized; whole yard sodded. PREVENTATIVE ACTIONS TO CONSIDER: CORRECTIVE ACTIONS REQUIRED: [!IA DEADLINE FOR COMPLETION OF CORRECTIVE ACTIONS: N/A Copies to: ® Contractor ❑ Financially Responsible Party ❑ Engineer Report By: Tyler Averett Phone: 252-329-4828 Date: 3/22/22