HomeMy WebLinkAboutNCC211015_Notice of Termination_20220418Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 4/18/2022 4:37:58 PM (NOT Submittal)
Approve by Morman, Alaina 4/28/2022 1:04:47 PM (NOT Request Review - NCC211015)
• The task was assigned to Morman, Alaina. The due date is: April 21, 2022 5:00 PM 4/18/2022 4:38 PM
NORTH CAROLINA
Rrf OmFkm&tral Qualrly
Certificate of NCC211015
Coverage (COC) No.* Enter the Certificate of Coverage Number
2020 Annual Fee Status
2021 Annual Fee Status May be blank (if not yet billed).
2022 Annual Fee PAST DUE
Status May be blank (if not yet billed).
This permittee owes a fee that is PAST DUE and has a pending NOD or NOV. Do not approve this NOT request until
payment is resolved. If this NOT request is acceptable, payment may be waived if applicable, but that action must be
completed first (at the NOD or NOV Review step) to ensure records are routed to the correct folder in the repository.
However, you can reject the NOT now if it is not acceptable.
Information associated with this permit:
Project Name
Mill Creek
Address
617 Megan Drive, Greenville, NC
County
Pitt
Latitude
35.5637
Longitude
-77.4423
Permittee Listed
Dillard Wallace Construction
Legally Responsible
Dillard Wallace
Individual
NC Reference No.
NCG01-2021-1015
E&SC Plan ID
ESCP-2021-0006
Original NOI Tracking
44856
No.
Date COC Issued
2/24/2021
Prior Rescission Date
Date populates only if COC was already rescinded at time of submittal.
Reason for Rescission/Termination Request:
Reason for • Project Closed -Out
Termination of Sale (Another Owner/Operator obtained new COC)
Coverage* Mistake or Invalid Coverage
Other
Additional More information about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Documentation if applicable.
Documentation Must be PDF format
Project Close-out Information:
Final Close-out 4/1/2022
Inspection Approval
Project Close-out 1059_001.pdf 131.27KB
Approval Must be PDF format
Documentation
North Carolina General Statute 143-215.613 (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I, as an authorized representative, hereby request rescission of coverage under the
NPDES Stormwater Permit for the subject facility. I am familiar with the information
contained in this request and to the best of my knowledge and belief such information
is true, complete and accurate.
"This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
Type Name* Dillard Wallace
Title* President
Organization* Dillard Wallace Construction Co.
Date * 04/18/2022
Email for dillardwallace@embarqmail.com
Confirmation*
Contact Telephone* 252-522-0973
NOT Certification 1060_001.pdf 78.11 KB
Form Must be PDF Format
Is this COC Already Ensure this COC has not been rescinded since submittal!
Rescinded?
Additional Email CC'd on Notification Emails
(Optional)
Original Permittee CC'd on Notification Emails
Email dillardwallace@embarqmail.com
Original Site Contact CC'd on Notificaiton Emails
Email Wallace.dwc@gmail.com