HomeMy WebLinkAbout20211405 Ver 1_Coble Church Rd Signed Effects Form_20220427
Historic Architecture and Landscapes EFFECTS ASSESSMENT form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement.
Page 1 of 2
HISTORIC ARCHITECTURE AND LANDSCAPES
ASSESSMENT OF EFFECTS FORM
This form only pertains to Historic Architecture and Landscapes for this project. It
is not valid for Archaeological Resources. You must consult separately with the
Archaeology Group.
PROJECT INFORMATION
Project No: County: Guilford
WBS No.: 17BP.7.R.136 Document
Type:
MCC
Fed. Aid No: Funding: State Federal
Federal
Permit(s):
Yes No Permit
Type(s):
n/a
Project Description:
Replace Bridge No. 267 on SR 3336 (Coble Creek Rd) over Climax Creek.
SUMMARY OF HISTORIC ARCHITECTURE AND LANDSCAPES REVIEW
Description of review activities, results, and conclusion
An eligibility evaluation report was submitted to HPO on July 29, 2019. In a letter dated August
12, 2019, HPO concurred with our recommendation that the Coble Farms Rural Historic District
(GF9124) .A meeting between NCDOT and NC HPO was conducted on January 27, 2022. The
findings are as follows.
ASSESSMENT OF EFFECTS
Property Name: Coble Farms Rural
Historic District
Status: DE
Survey Site No.: GF9124 PIN:
Effects
No Effect No Adverse Effect Adverse Effect
Explanation of Effects Determination: The replacement of Guilford County Bridge No. 267
will not add elements to the historic district, nor will they diminish the characteristics for which
the district is eligible. The large wetland surrounds the bridge. Utilities will be relocated. Two
bar-rail on parapet.
List of Environmental Commitments:
none
19-01-0022
Project Tracking No. (Internal Use)
Historic Architecture and Landscapes EFFECTS ASSESSMENT form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement.
Page 2 of 2
SUPPORT DOCUMENTATION
Map(s) Previous Survey Info. Photos Correspondence Design Plans
FINDING BY NCDOT AND STATE HISTORIC PRESERVATION OFFICE
Historic Architecture and Landscapes – ASSESSMENT OF EFFECTS
NCDOT Architectural Historian Date
State Historic Preservation Office Representative Date
Federal Agency Representative Date
02/22/2022
02/22/2022
02/22/2022
4
SHEET NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
JOR56882R:\Roadway\Proj\400267_rdy_psh.dgn12:41:46 PM2/16/2022PROJECT REFERENCE
Office of:
Prepared in the
0 10'025'25'50'5'5'
VERTICAL SCALE HORIZONTAL SCALE
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
LICENSE NO. F-0669
MOTT MACDONALD I & E, LLC
17BP.7.R.136 - GUILFORD 267
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
LICENSE NO. C-3705
VHB ENGINEERING
7621 Purfoy Road, Suite 115
Fuquay-Varina, NC 27526
www.mottmac.com/americas
T
T
S 45°36'26" W462.96'S 45°38'02" W463.91'50' ACCESS EASEMENT50' ACCESS EASEMENTEASEMENT PER PB 121 PG 8136" WW
1SFD
36" WW36" WW36" WW
36" WW36" WWN 02°59'52" W899.41'N 44°19'06" E916.39'SOILSOILSOILEX
ISTING
R
/W
EXIST
ING
R
/W
EXIST
ING
R
/W
EXIST
ING
R
/W
EXISTING R/W
EXISTING R/W
60.00'60.00'15" RCP
CLIMAX CREEK
TO NC 62
TO
US
421
24" RCP15
" RCP
MTL
GRGR
20' DRAINAGE AND UTILITY EASEMENT20' DRAINAGE AND UTILITY EASEMENT10' DRAINAGE EASEMENTS 27°57'16" W479.68'N 30°55'20" E573.15'N 26°04'31" E617.51'SR
3336
COBLE
CHURCH
RD
21' BST35.00'30.00'WOODS
BL-3
400267-1
BM1
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
BL-4
WOODS
BL-5
EIP
TO
7.09'
WILLIAM J SPIVEY
GREGORY S MOESCH
DB 4684 PG 1463
PB 127 PG 4
EDWARD D WARDEN
DIANE G WARDEN
DB 4644 PG 1337
PB 72 PG 44
JAMES H GUNN
RUTH C GUNN
DB 3237 PG 232
PB 72 PG 44GRN 26°04'31" E
5.34'
EIP
TO
8.29'
PEARL M COBLE
DB 4620 PG 1857
PB 127 PG 4
EIP
TO
6.37'
PEARL M COBLE
DB 2663 PG 346
S 01°44'59" E
18.25'
FLORENCE C BERRY
DB 1364 PG 607
PB 121 PG 81
W/LT
POND
POND
DB 3119 PG 554
SAMUEL L COBLE
SUSAN W COBLE
EIP EIP
15" RCP
15" CMP
EIPTO EIP
14.57'
TO EIP
0.28'ROCK WALLJOHN MICHAEL MOORE
KIMBERLY JONES MOORE
DB 8237 PG 2126
CREEKCLIMAX
0403
0402
0401
0404 0406
0405
RETAIN
REMOVE
15"
REMOVE
( Not to Scale)
BANK STABILIZATION
-L- STA. 16+70 TO 16+91 LT
DETAIL 5
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
-L- STA. 17+17 TO 17+38 LT
2:12:1
D
( Not to Scale)
STANDARD 'V' DITCH
-L- STA. 13+50 TO 14+11 RT
Min. D=1.0 Ft.
DETAIL 2
Ground
Natural
Ground
Natural 2:12:1D
( Not to Scale)
STANDARD BASE DITCH
B
d
-L- STA. 21+66
DETAIL 4
B=0-5 Ft.
Max. d=1.0 Ft.
Min. D=2.0 Ft.
Ground
Natural
Ground
Natural
*When B is < 6.0'
Type of Liner= Class B Rip-Rap
Geotextile
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
EST. 7 SY GEOTEXTILE
EST. 2 TONS
CLASS B RIP RAP
2GI
TB
2GI
TB
2GI
TB
2GI
TB
EST. 35 SY GEOTEXTILE
EST. 20 TONS
CLASS B RIP RAP
EST. 125 SY GEOTEXTILE
EST. 50 TONS RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST. 120 SY GEOTEXTILE
EST. 50 TONS RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST. 30 CY DDE
EST. 75 SY GEOTEXTILE
EST. 30 TONS RIP RAP
SLOPE = 0.047
SEE DETAIL 4
STANDARD BASE DITCH
EST. 205 SY GEOTEXTILE
EST. 140 TONS RIP RAP
SEE DETAIL 5
BANK STABILIZATION
EST. 30 SY GEOTEXTILE
EST. 10 TONS RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST. 5 CY DDE
SLOPE = 0.026
SEE DETAIL 2
STANDARD V DITCH
SEE DETAIL 1
LATERAL V DITCH
( Not to Scale)
LATERAL 'V' DITCH
2:1D
-L- STA. 13+00 TO 13+50 RT
Min. D= 1.0 Ft.
DETAIL 1
Ground
Natural
Flatter4:1 or
Slope
Fill
W/ELBOWS
15"
W/ELBOWS
15"
RCP-IV
15"
RCP-IV
15"
+21 LT
BEGIN SBG
RCP-V
2@24"
RETAIN RETAIN
-L- STA. 19+00 TO 21+47 LT
-L- STA. 14+08 TO 16+44 RT
-L- STA. 13+30 TO 13+80 LT
Fill Slope2:1 or Flatter
b= 1.5 Ft.
d= 1.5 Ft.
Type of Liner= Class B Rip-Rap
b
DETAIL 3
Ground
Natural
( Not to Scale)
TOE PROTECTION
d
Geotextile
(STRUCTURE PAY ITEM)
UP TO ELEV. 640.0' (TYP.)
CLASS II RIP RAP
+25 LT
END SBG
0407
0408
0409
PI Sta 15+18.22
D
L = 205.62'
T = 102.82'
R = 4,680.00'
PI Sta 19+38.15
D
L = 333.21'
T = 167.06'
R = 1,840.00'15+0020+00-L- POT Sta. 10+00.00
-L- PC Sta. 14+15.39
-L- PT Sta. 16+21.01
-L- PC Sta. 17+71.09
-L- PT Sta. 21+04.30
-L- POT Sta. 23+50.00
-L- Sta. 16+63.88
BEGIN BRIDGE
-L- Sta. 17+46.13
END BRIDGE
-L- Sta. 16+53.00
BEGIN APPROACH SLAB
-L- Sta. 17+57.00
END APPROACH SLAB
-L- POT Sta. 13+00.00
BEGIN PROJECT 17BP.7.R.136
-L- POT Sta. 22+00.00
END PROJECT 17BP.7.R.136
ALL FOUR BRIDGE CORNERS
TYPE-III ANCHOR UNITS ON
NOTE:
GREU
TL
-2-L
-50' TAPER
22'4' PS-L-020221'
GREU
TL-2
GREU TL-2
GREU TL-2EXIST
30'-6"22'4' PS4' PSEXIST50' TAPER21'02030421'040302020102020201000102N
A
D 83/ N
A 2011
2
3 5
4
50'
+21.01
55'
+21.01
55'
+71.09
50'
+71.09
50'
32.52'
+08.76
55'
40'
+45
30'
+10.23
55'
+85
65'
+00
65'
30'
+20
65'
30'
+35
45'
35'
+21.30
60'
50'
+40
60'
50'
+50
40'
+04.30
30'
+04.30
70'
30'
+50
70'
30'
+95
50'
30'
+15.39
55'
30'
+15.39
30'
+00
1
-L-
PI = 15+20.00
EL = 645.25'
VC = 340'
BEGIN GRADE
STA. 13+50.00
EL = 646.98'
END GRADE
STA. 21+50.00
EL = 654.67'
(STRUCTURE PAY ITEM)
EXCAVATION = 350 CY
10 11 12 13 14 15 16 17 18 19 20 21 22 23
610
620
630
640
650
660
STA. 13+00.00
BEGIN PROJECT
STA. 22+00.00
END PROJECT
EXIST
TO
MILL
EXIST
TO
MILL
K = 131
610
620
630
640
650
660
(-)1.0176%
(+)1.5706%
(+)1.1750%
PI = 20+30.00
EL = 653.26'
VC = 150'
K = 379
(-) 4
.0600%
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
YRS
CFS
FT
CFS
YRS
FT
CFS
YRS
FT
= 1942
= 25
= 643.8
= 2736
= 100
= 645.9
= 3682
= 500+-
= 646.6
= 2/14/2019
= 635.7ELEV. = 646.60'-L- STA. 13+00BEGIN SP DITCH RTELEV. = 644.57'-L- STA. 13+50END SP DITCH RTL
GP ELEV. = 648.16'
W/4' DEEP CAPS
1 SPAN: 1@80', SKEW 90
33" BOX BEAM
BRIDGE C STA. 17+05.0 -L-
DATE: 02-14-2019
ELEV.=635.7'
NORMAL WS
ELEV=640.0'
EXCAVATE TO
(STRUCTURE PAY ITEM)
(NORMAL TO CAP) (TYP.)
SLOPE 1.5:1 (2 FT. THICK)
CLASS II RIP RAP
BANK STABILIZATION
COBLE CHURCH HISTORIC BOUNDARY
C
F
F
C F F
FF
F
F
F
FC
C