Loading...
HomeMy WebLinkAbout20220535 Ver 1_More Info Received_20220426Strickland, Bev From: Brittany Hepler <brittany@lakelifepermits.com> Sent: Monday, April 25, 2022 2:03 PM To: Perez, Douglas J Subject: Re: [External] Rowen Stabilization Attachments: Rowen Buffer.pdf; Rowen Replant Plan.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Please see attached. Thank you! On Mon, Apr 25, 2022 at 1:27 PM Brittany Hepler <brittany@lakelifepermits.com> wrote: Doug, I actually went ahead and called the homeowner they were actually planning on planting back 2 trees every tree removed. She is working on a plan for me now. On Mon, Apr 25, 2022 at 1:11 PM Brittany Hepler <brittany@lakelifepermits.com> wrote: We mentioned replanting of the trees because Alan told me prior to his retirement that they are asking to replant trees for any that are removed. We do not necessarily have a plan. I have not had to provide that on any of my recent applications. If we do need to provide that I can talk to the homeowner. Sending that buffer doc here in just a second. Thank you! On Tue, Apr 26, 2022 at 11:53 AM Perez, Douglas J <doug.perez@ncdenr.gov> wrote: Hi Brittany, So in reviewing the shoreline stabilization application, I did have a few questions/comments. First, if you could file out the attached Catawba Riparian Buffer form and return it to me, that would be most appreciated. I've attached it in two formats but just fill out whichever one works best for you. Second, you mentioned replanting of trees in your application. Do you have a plan for that? How many will you be replanting and where are they going to go? If you could get back to me, that would be great. 1 Doug From: Brittany Hepler[mailto:brittany@lakelifepermits.com] Sent: Monday, April 25, 2022 2:28 PM To: Perez, Douglas J <doug.perez@ncdenr.gov> Subject: [External] Rowen Stabilization CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon Doug! I hope you're having an awesome day so far. Can you update me on this projects status? Thanks so much! Brittany Hepler 704-230-7297 2 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address:-1—OWe" e(U,2� I ahM-4 County: LAACid Owner: F tJWP� M' Print I' - Signatur Contractor/agent: TJ L1T1y `F Ft�#,I P int Slgnat e [7 'etA-�-�4'IM cf� The approval is for the purpose and deslgn described in your application. Impacts not indicated In the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 028 .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [1SA NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 028.0243 (6)] Beaches, impervious patios, Impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land most indicate an access and Indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. 115A NCAC 02H .0502 and 15A NCAC 02B.D243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake, [15A NCAC 02B .0243(S), (6)] Acknowledgement ci Notification /lY l 0-H",P KOVV1k'iV t. , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Cartificationarid Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. U Signature (owne Date: ZS ZZ Scanned with CamScanner 4/25/22, 2:02 PM 6726882231.jpg Vk s s i (itilffi� � t y Till fey r https://mail.google.com/mail/u/0/#inbox/FMfcgzGpFgnTlwVZHMxVHrgMJjTCkPMP?projector=1 1/1