Loading...
HomeMy WebLinkAbout20060897 Ver 1_General Correspondence_20060816August 15, 2006 Ms. Cyndi Karoly, Supervisor Division of Water Quality/Oversight Express Review Permitting Unit North Carolina Department of Environmental and Natural Resources 1650 Mail Service Center Raleigh, NC 27699-1650 Re: DWQ Project # 06-0897 /Franklin County Dear Ms. Karoly: I apologize for the time it has taken to respond to your June 29 letter regarding the referenced project, however, I was and am still confused as to why there is so much concern about a condition that has existed the same before and after construction. When construction was started on this proj ect, I contacted the Franklin County Inspections Department and obtained the necessary permits. During the application process, no reference was made to the necessity of obtaining permission from your agency to carry on the project. In fact, no map in existence at the time would put me or anyone else on notice that the condition as described by your agency. With this in mind, I would respectfully request that you reconsider my application to continue the project as proposed. I would be amenable to meeting with your staff at the project to discuss the details of the project. Thank you. Sincerely, William J. Q k, Jr. ~~ Q~c~~oe~~ AUG 1 6 2006 (7ENR -WATER QUALITY VYETIANDS AND STORFAWAT~R BRANCH