HomeMy WebLinkAbout20060897 Ver 1_General Correspondence_20060816August 15, 2006
Ms. Cyndi Karoly, Supervisor
Division of Water Quality/Oversight Express Review Permitting Unit
North Carolina Department of Environmental and Natural Resources
1650 Mail Service Center
Raleigh, NC 27699-1650
Re: DWQ Project # 06-0897 /Franklin County
Dear Ms. Karoly:
I apologize for the time it has taken to respond to your June 29 letter regarding the referenced
project, however, I was and am still confused as to why there is so much concern about a condition
that has existed the same before and after construction. When construction was started on this
proj ect, I contacted the Franklin County Inspections Department and obtained the necessary permits.
During the application process, no reference was made to the necessity of obtaining permission from
your agency to carry on the project. In fact, no map in existence at the time would put me or anyone
else on notice that the condition as described by your agency.
With this in mind, I would respectfully request that you reconsider my application to continue the
project as proposed. I would be amenable to meeting with your staff at the project to discuss the
details of the project. Thank you.
Sincerely,
William J. Q k, Jr.
~~
Q~c~~oe~~
AUG 1 6 2006
(7ENR -WATER QUALITY
VYETIANDS AND STORFAWAT~R BRANCH