HomeMy WebLinkAboutNCC221659_ESC Approval Submitted_20220427catawba county
utilities & engineering
December 15, 2021
RECL NC, LLC
3050 First Avenue Ct. SE
Hickory, NC 28602
RE: LETTER OF APPROVAL WITH MODIFICATIONS
Project Name: Short Road Subdivision
Case Number: ECPR-11-2021-39332
Disturbed Area: 85 acres
Submitted By: R. Joe Harris & Associates, Inc.
Date Received: December 13, 2021
New Submittal Revision X
Dear Mr. Yeargain:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval with Modifications. The
Erosion Control Permit must be posted at the job site. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NO]) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction Stormwater General Permit. This form MUST be submitted
prior to the commencement of any land disturbing activity on the above named protect.
The NOI form may be accessed at deq.nc.gov/NCG01. After submittal of a complete and
correct NOI Form, a COC will be emailed to you within three business days.
Title 15 NCAC 413 .0018(a) requires that a copy of the approved erosion control plan,
NCG01 permit and COC, and records of inspections made be on file at the job site. Also,
this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate
to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statue 113A- 51 through 66), this office may require revision to the plan
and implementation of the revisions to insure compliance with the Act.
catawbacountync.gov
Catawba County Government Center
25 Government Drive I Newton NC 28658 E 828.465,8261
MAKING. LIVING. BETTER,
Acceptance and approval of this plan is conditioned upon your compliance with federal
and state water quality laws, regulations and rules. In addition, local city ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility/Ownership Form that you have provided. You are
requested to file an amended form if there is any change in the information included on
the form.
Please ensure the approved plans and permit are picked up from the Government
Center, see address above. In addition, please notify this office of the proposed
start date for this project and to schedule a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Toni Norton, P.E., LEED A.P., CPESC
Water Resources Engineer
Cc: File
R. Joe Harris
NC DEMLR
MODIFICATIONS
Initial and Final Phase Erosion Control — all sheets
Erosion Control Details, Sheet C3.19
• Design basins and baffles as shown in NC Erosion & Sediment
Control Planning and Design Manual
o Practices 6.61 Sediment Basin, 6.64 Skimmer Sediment Basin
Trap efficiency —
... Provide a minimum of three porous baffles to evenly
distribute flow across the basin and reduce turbulence
o Practice 6.65 Porous Baffles
...install at least three rows of baffles between the inlet and
outlet discharge point.
Submit water crossing approvals