Loading...
HomeMy WebLinkAboutNCG080411_DMR_20220407 Semi-annual Stormwater inscharse (Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 4- 9 - 2-a_ CERTIFICATE OF COVERAGE No. NCG08 0 4 1 1 SAMPLE COLLECTION YEAR FACILITY NAME REPUBLIC SERVICES-TROY SAMPLE PERIOD [KJan-June ❑July-Dec t•" ' COUNTY MONTGOMERY �' {i.-,,4,;❑ Monthly1 (month) PERSON COLLECTING SAMPLES JAMES M.WILSON z"D1SC}IAR6ING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY ENC o Lab Cert.# CFO "1n4)& APR 19 ( ❑Zero-flow ❑Watersupply ❑SA Comments on sample collection or analysis: FILES 00ther `rti�RA L i•l0 i J PLEASE REMEMBER TO SIGN ON THE REVERSE 3 Part A:Vehicle Maintenance Areas Monitoring Requirements ❑ No discharge this period' OutFall Date 00530 00400 00556 No. Sample Collected, Total Suspended pH, Non-Polar Oil and Grease/TPH EPA New Motor Oil Usage, mo/dd/yr Solids,mg/L Standard units Method 1664(SGT-HEM),mg/L Annual average gal/mo Benchmark 50 or 100 see permit Within 6.0—9.D 15 3- 16- �2 I �' ° 6• r3 • rl o - 1 6 . 1z oi ) 6 1?1 I ) Is o Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_✓yes _no (if yes,report your analytical results in the table immediately below) Part B: Oil/water Separators and secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfali Date 00556 00530 00400 No. Sample Collected, Non-Polar Oil and Grease/TPH EPA Method Total Suspended Solids, PH, mo/dd/yr 1664(SGT-HEM),mg/L mg(L Standard units Permit Limit - 15 50 or 100 see permit 6.0—9.0 - if. - 2'L r) 00 i 0 g 1 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25,2012 Page 1 of STORM '. sT CHARACTERISTICS: Date 3-16-1Z(first event sampled) Total Event Precipitation(inches): 1- Date (list each additional event sampled this reporting period,and rainfall amount) Total Event Precipitation(inches): Note: If you report a sample value In excess of the benchmark,you must implement Tier 2,Tier Z,or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: a A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. e 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. a TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑ REGIONAL OFFICE CONTACT NAME: Mail an orialnal and one copy of this OMR,including all"No Discharge"reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of"No Discharge"reoortsl to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitt' g false information,including the possibility of fines and imprisonment for knowing violations." f/ d01 C (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http_://portal.ncdenr.org/web/wg/ws/su/npdessw#tab-4 SWU-250 last revised October 25,2012 Paee 2 of 2