Loading...
HomeMy WebLinkAboutWV0800307_Permit (Issuance)_20220426DocuSign Envelope ID: E23EF418-9D23-41CF-BD8E-7B9B21FE2ACA Permit # WV0800307 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY RALEIGH, NORTH CAROLINA PERMIT FOR THE CONSTRUCTION OF A WELL OR WELL SYSTEM In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Cape Fear Commercial FOR THE CONSTRUCTION OF a water supply well. The well will be located at 1022 Ashes Drive, Wilmington, New Hanover County in accordance with the application received April 15, 2022, and additional information received on April 25, 2022, and in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered part of the Permit. This Permit constitutes a variance which acknowledges that the referenced well does not meet 15A NCAC 2C .0107 (a)(2)(H) for separation distance to sewage and liquid -waste collection or transfer facility (100 feet required vs 68 feet available). This variance allows the well system to be used for its intended purpose (irrigation only). This Permit is for well construction only and does not waive any provisions or requirements of the Water Use Act of 1967, or any other applicable laws and regulations. Well construction shall be in compliance with the North Carolina Well Construction Regulations and Standards. However, this Permit pertains to the jurisdictional authority of the Division of Water Resource and does not waive the requirements of other jurisdictions. This Permit will be effective from the date of its issuance until April 26, 2023, and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. The well shall be constructed in accordance with 15A NCAC 02C .0107 except that for which this variance is granted. 2. The well shall be located and constructed as shown on the attachments submitted as part of the permit application. 3. Well construction record (GW-1) for the well must be supplied to the Division of Water Resources' Information Processing Unit within 30 days of well completion. Provide the well construction permit number on the GW-1 form. 4. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 5. When a well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C.0240 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of well abandonment. C:\PROGRAMDATA\ACTIVEPDFITEMP\DOCCONVERTER\API\INPUT\$EBBCA205E406$8CF529460D234F0F982E 148962E 161A9.DOCX DocuSign Envelope ID: E23EF418-9D23-41CF-BD8E-7B9B21FE2ACA Permit # WV0800307 If any requirements or limitations of this Permit are unacceptable, you have the right to an adjudicatory hearing upon written request within 30 days. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such demand is made, this Permit is final and binding. Permit issued this 26th day of April 2022 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DocuSigned by: E.041114 Seo•del, 1&.4.g E3ABA14AC7DC434.. Morella Sanchez King, PhD, PE, Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission cc: Cape Fear Drilling Services (via email) DWR (Laserfiche) C:\PROGRAMDATA\ACTIVEPDFITEMP\DOCCONVERTER\API\INPUT\$EBBCA205E406$8CF529460D234F0F982E 148962E 161A9.DOCX