Loading...
HomeMy WebLinkAbout20210377 Ver 1_RPOT_20220425Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Monday, April 25, 2022 8:31 AM To: Homewood, Sue Cc: Brad Luckey Subject: [External] Subject Line: SAW-2021-00106 / Cooper Road (The Stapleton) / NWP 29 / Corps Receipt of Individual WQC Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Sue, After review of the submitted Pre -Construction Notification (PCN)/application for the above referenced project, dated April 12, 2022, and Nationwide Permit (NWP) 29 Water Quality General Certification No. 4256, dated December 18, 2020 (https://saw-reg.usace.army.mil/NWP2021/NWP29 StateWQC.pd), it appears an Individual 401 Water Quality Certification (WQC) is required from the NCDWR for the proposed activities. The PCN/application received by our office provided the 9 required elements for an individual WQC and constitutes the Corps initial receipt of the WQC application. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days from the date of the complete WQC request. Unless NCDWR is granted a time review extension, the date upon which a waiver of the WQC will occur if you do not act on the certification is August 10, 2022. Brad: Please note, should we finalize our review prior to receiving the WQC, you will receive a provisional general permit notification from the Corps. Once a WQC is issued or waived by the NCDWR, the Corps will provide you with a final general permit verification. Your proposed work SHALL NOT commence until after the WQC has been issued or waived AND the final general permit verification has been provided to you. Best Regards, Sam Samantha Dailey U.S. Army Corps of Engineers Wilmington District, Regulatory Division, Raleigh Field Office Email: Samantha.J.Dailey@usace.army.mil Phone: (304) 617-4915 1