Loading...
HomeMy WebLinkAboutWQ0043378_Application (FTSE)_20220426LandDesign. CREATING PLACES THAT MATTER, April 21, 2022 Novel Ballantyne Phase 1 & Phase 3 LDI Project No. 1018532 SEWER SYSTEM APPLICANT: Crescent Communities 277 W. Trade Street Charlotte, NC 28202 DEVELOPER: Crescent Communities 277 W. Trade Street Charlotte, NC 28202 DESCRIPTION: i ECEIVED/NODE®/DWR APR 2 2 2022 WQROS MOORESVILLE REGIONAL OFFICE We would like to request approval for sewer extension to the project site of Novel Ballantyne Phase 1 and Phase 3. The proposed buildings contributing flow to the private sewer extension will include eighteen multi -family apartment buildings and a pool amenity area. The total wastewater flow requested and approved for the entire Novel Ballantyne project was 62,175 gpd. The private sewer extension will allocate a total flow of 62,175 gpd to the public system. We are proposing to install 2534 LF of 8" PVC. Flows from the site will be sent to the McAlpine Creek Wastewater Treatment Plants (facility permit number NC0024970). This application package consists of the Fast Track sewer system extension application, the application fee, the flow tracking and acceptance form from Charlotte Water, a USGS topographic map indicating the location of the project, a street level map showing the project area, and articles of organization for Crescent Communities. Respectfully Submitted, Matthew Weschler, PE LandDesign, Inc. LANDDESIGN.COM 223 N GRAHAM STREET • CHARLOTTE NC 23202 • 704 333 0325 CHARLOTTE • WASHINGTON DC • DALLAS • ORLANDO • SAN FRANCISCO State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: j`V QO (35 W(to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: WQROS MOORESVILLE REGIONAL OFFICE 1. Applicant's name: Crescent Communities (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation El General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Katie Maloomian per 15A NCAC 02T .0106(b) Title: t\V-MOYt?ed i2C1rNeSetkillve 4. Applicant's mailing address: (p(Ji S6VTN 'C CC✓`I°S'r4.EeT, Su ICe- 00,9 City: Charlotte State: NC 5. Applicant's contact informa6tion: q.: Phone number: (980) 321- ,1-i t Email Address: kmaloomiancrescentcommunities.com RECEIVED/NCDEQ/DIM$ APR 9 2 2022 Zip: 28202- II. PROJECT INFORMATION: 1. Project name: NOVEL BALLANTYNE 2. Application/Project status: ® Proposed (New Permit) E] Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.036041° Longitude: -80.849948° 5. Parcel ID (if applicable): 22313217 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Matthew Weschler License Number: 048124 Finn: LandDesign Mailing address: 223 N Graham St City: Charlotte State: NC Zip: 28202- Phone number: (704) 333-0325 Email Address: mweschler@landdesign.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek Permit Number: NC0024970, NC0024945, NC0024937 Owner Name: City of Charlotte V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): N/A 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VL GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ►/N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Aw eement (FORIvi: DEV) been attached? ❑ Yes EINo ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ® Residential Leased ❑ Retail with food preparation/service ❑ School / preschool / day care 0 Medical / dental / veterinary facilities 0 Food and drink facilities 0 Church 0 Businesses / offices / factories ❑ Nursing Home 0 Car Wash ❑ Hotel and/or Motels ® Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect? ❑ Yes ® No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Multi -Family Dwelling Units 135 gal/unit 365 49275 GPD Townhome Dwelling Units 190 gal/unit 60 11400 GPD Pool Amenity 10 gal/person 150 1500 GPD gal/ GPD gal/ GPD gal/ GPD Total 62175 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 62,175 GPD (per 15A NCAC 02T .0114) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 2534 PVC > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): N/A COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: . Longitude: - 3. Design flow of the pump station: 4. Operational point(s) of the pump(s): millions gallons per day (firm capacity) gallons per minute at 5. Summarize the force main to be permitted (for this Pump Station): feet total dynamic head (TDH) Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: (A Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches • 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage • If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A • This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? • Information can be obtained from the 401 & Buffer Permitting Branch ❑ Yes No 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. D Yes ►ZI No ❑ N/A • If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Puinp Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, Matthew Weschler (Professional Engineer's name from Application Item III.I.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. \\o l } 1111 /t1z j ,\\ of\ROL , fig North Carolina Professional Engineer's seal, signature, and date: ���,�• . S I ON N9 'i Al .. NG �. • coV'>� '//74 T• HEWt ',\e 3. Applicant's Certification per 15A NCAC 02T .0106(b): Katie Maloomian r Atiimr122Q vveceoceive (Signature Authority's name & title from Application Item 1.3.) W 1 L11 Z, attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: /0725720 2 I FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: LandDesign Project Name for which flow is being requested: Novel Ballantyne (Residential) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 9.5 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 74.742 0.062175 84.242 85.1% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p f), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Clems Branch 1.377 0.61 .819 0.163 0.982 -0.372 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Ballancroft Parkway Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 6/25/2021 Signing Official Signature Cheif Engineer Title of Signing Official Date Page 2 of 6 FTSE 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 16.6 % and 0.982 MGD of the Available Capacity (E) in Pump Station Clem's Branch ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.982 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Clem's Branch Pump Station is in design or under construction with planned completion in June 202 ; and/or d. The following applies: The new Clems Branch Pump Station has been complete as of 6/8/2021. The pump station's new firm capacity is 4.89 MGD. This new capacity will be reflected after the next quarterly report update. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-18 Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8% Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 10-18 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) Design Firm Average Pump Station Capacity Daily Flow (Name or Number) MGD (Firm / pf) Kaw Creek PS 0.800 0.320 Approx. Current Avg. Daily Flow, MGD 0.252 Valley Road PS 1.895 0.758 0.472 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity* 0.080 0.332 -0.012 0.135 0.607 0.151 Page 5 of 6 FTSE 10-18 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 10-18 Polaris 3G Map — Mecklenburg County, North Carolina Novel Ballantyne Date Printed: 9/27/2021 4:59:13 PM PROP. 8" PRIVATE GRAVITY SS C#>ta rlotti This map or report is prepared for the inventory of real property within Mecklenburg County and is compiled from recorded deeds, plats, tax maps, surveys, planimetric maps, and other public records and data. Users of this map or report are hereby notified that the aforementioned public primary information sources should be consulted for verification. Mecklenbur. Count and its map.in. contractors assume no le.al responsibilit for the information contained herein. :51 US. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY ne lialke, Map 441 US Topo SCALE 1:29 000 9911.11. ITU - - WEDDINGTON QUADRANGLE NORTH CAROLINA • SOUTH CAROLINA 7.5•AUNUTE SERIES LI.ASWILAT.4 WEDDINGTON, NC, SC 201, CHARLOTTE June 28, 2021 Mrs. Molly Baten LandDesign, Inc. 223 North Graham Street Charlotte, NC 28202 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE NOVEL BALLANTYNE 15700 MARVIN ROAD, CHARLOTTE, NC 28277 CLTWATER TRACKING# 20213138 After analysis of the sanitary sewer associated with the proposed project, 20213138, NOVEL BALLANTYNE, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 62,175 gallons per day (365 units x 135 gpd/unit, 60 units x 190 gpd/unit, 150 persons x 10 gpd/person) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NCDEQ-FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within two (2) years of issuance of this flow acceptance, and payment for any service connections have not been received within two (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded and a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Gti . tyro- Awz.o o. Guillermo Anzola Engineering Assistant Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org u Operated by the City of Charlotte