RE: [External] RE: SW3220201; Frank Liske Park Barn
Matt,
You still need to upload the following electronic items:
- The rest of the Application (Only page 3 was uploaded).
- The O&M Agreement Form
- The USGS topographic map
- The Property Deed
- The plans
-Jim
From: Farkas, Jim J
Sent: Monday, April 18, 2022 8:56 AM
To: Blackmon, Matthew <MBlackmon@benesch.com>; Bilafer, Kyle
Cc: Ashbaugh, Jeff <JAshbaugh@benesch.com>
Subject: RE: [External] RE: SW3220201; Frank Liske Park Barn
Matt,
The electronic files for all of the submissions for this project have still not been uploaded through the following
link (https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload). If the files were uploaded toward the end of
last week, they may not have "come through" yet (staff performs a QA/QC check on uploaded material before it
gets released to me and Friday was a State holiday). If you have already uploaded the files you do not need to
re -upload the files but if you have not done so, please upload them.
The provided flow calculations were not signed & sealed (Required per 15A NCAC 02H .1042(2)(f)).
Please provide an original signature on the hard copy of the Supplement-EZ Form (Required per Section VI, 3 of
the Application).
All other issues were addressed.
-Jim
From: Blackmon, Matthew <MBlackmon@benesch.com>
Sent: Tuesday, April 12, 2022 3:28 PM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Bilafer, Kyle <KDBilafer@cabarruscounty.us>
Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; Ashbaugh, Jeff <JAshbaugh@benesch.com>
Subject: [External] RE: SW3220201; Frank Liske Park Barn
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon Jim,
I hope you are well. Thank you for the quick response to our phone call last week. Per your request, attached
ate the following electronic documents:
• Response to Comments Letter
• Revised Project Narrative
• Discharge Calculations
• Revised SW101 New Permit Application (page 3)
• Revised Supplement-EZ Form
Also, as you requested in the email below, a hard copy of the above items have been overnighted to your
office and you should receive them by close of business tomorrow. Please let me know if there is anything
additional you require for your review, and as always, feel free to contact me with any questions, comments, or
concerns.
Thank you,
Matthew Blackmon, PE
Project Engineer
mblackmon(o)benesch.com
direct:704-831-5686 mobile:443-285-1499 office:704-521-9880
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Monday, April 11, 2022 8:51 AM
To: Blackmon, Matthew <MBlackmon@benesch.com>; Bilafer, Kyle <KDBilafer@cabarruscounty.us>
Cc: Khan, Zahid <zahid.khan@ncdenr.gov>
Subject: SW3220201; Frank Liske Park Barn
Matt,
I was looking over the additional information you provided on 2/4/22. Everything looks good except for a few small
issues:
Please correct the following:
- Please adjust the project narrative as discussed in our 4/7/22 meeting to elaborate on the need to include the
area drains on the plaza (sizable area draining onto the plaza and the inability to divert this area due to the old
trees) and to explain that the existing site condition utilized a roof drain collection system that is being replaced
in -kind.
Please provide the discharge calculations for FES 6 and the roof drain for the southeast portion of the barn. It is
noted in the project narrative that these discharge velocities are less than 2 fps, but the calculations were not
provided and therefore could not be verified (15A NCAC 02H .
Application:
o Section IV, 8 —The percent impervious area calculation should be done using the project area (Section
IV, 7), not the property area (Section IV, 4). NOTE: Since this project has existing BUA, you can use the
project density method outlined in 15A NCAC 02H .1003(1)(b).
o Section IV, 10:
■ Total & On -site Drainage Area —These values should correspond to the project area (Section IV,
7), expressed in square feet.
■ % Impervious Area — Recalculate (See earlier comment).
- Supplement-EZ Form:
o Cover Page:
■ Line 2 —This value should correspond to the project area (Section IV, 7), expressed in square
feet.
o Drainage Area Page:
■ Entire Site Column:
• Lines 5 & 6 — These values should correspond to the project area (Section IV, 7),
expressed in square feet.
• Line 8 —This value should equal to total amount of BUA that is located within the project
area (Line 9 + Line 10 + Line 11 + Line 15).
• Line 10— Please include this item. This item is the sum of all of the BUA listed in Line 12.
• Line 18 — Revise if needed in accordance with earlier comments.
■ LD 1 Column — Please complete this column. For this project, it will be identical to the entire site
column.
o Low Density Page:
■ Line 12—This item is required per 15A NCAC 02H .1003(4)(e).
■ Line 14 — Please answer this item.
■ Line 15 — You may wish to add the explanations that will be added to the narrative (explaining
the need for the area drains and roof drain collection) to this additional information section.
Please provide the following:
- 1x hard copy and 1x electronic copy of the revised project narrative.
- 1x hard copy and 1x electronic copy of the discharge calculations.
- 1x hard copy and 1x electronic copy of the revised pages of the Application.
- 1x hard copy and 1x electronic copy of the revised pages of the Supplement-EZ Form.
Hard copies should be mailed to me at the following address:
For Fed Ex/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
Hand Delivery:
Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)
will be able to receive the submission. Do not leave the package in the foyer with the security guard.
NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the
submission package may be lost while being sent from the Regional Office to me in the Central Office.
Electronic copies should be uploaded at the following location:
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload fedocs.deg.nc.govl
3
Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing
these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the
permit without doing another formal 30-45 day review.
Let me know if you have any questions.
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources — Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim.Farkasgncdenr.gov
E
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Farkas, Jim J
Sent: Tuesday, February 1, 2022 2:07 PM
To: Blackmon, Matthew <MBlackmon@benesch.com>; Bilafer, Kyle
Cc: Moore, James <james.moore@ncdenr.gov>
Subject: Frank Liske Park Barn; 4001 Stough Road, Concord, Cabarrus County
Good Afternoon,
We received your application for a new post -construction stormwater permit on 1/25/2022. At this time, the submission
is not administratively complete and cannot be accepted for review in its current condition. Please provide the following
submittal items within 30 calendar days (by close of business on 3/2/2022) so that we may accept the project and begin
the review process, otherwise, the project will be returned as administratively incomplete.
1x full hard copy of the Supplement-EZ Form. This item is required per Section V and Section VI, 3 of the
Application. This spreadsheet uses macros to generate the correct pages to be filled out based on the
information entered into the cover page. Once the cover page is filled out, click on the "Load Supplement
Forms" link (between Lines 26 & 27 on the cover page) to generate the drainage areas page and the low -density
page. All three of these pages of this form are required for this project.
- 1x original signed (in pen) & notarized hard copy of the Operation & Maintenance Agreement Form. This item is
required per Section V and Section VI, 3 of the Application and 15A NCAC 02H .1042(2)(j). Similar to the
Supplement-EZ Form, the O&M Agreement Form uses macros to generate the maintenance requirements based
on the information entered on the cover page. Please ensure that these pages are included with the
resubmission and prior to getting the form notarized. NOTE: You may wish to get a second copy of this form
notarized and have the applicant hold onto it (The Register of Deeds requires an original copy for recording).
NOTE: Disconnected Impervious Surfaces is reserved for areas designed in accordance with Part C-10 of the
Stormwater Design Manual. Low -density areas that utilize disconnection should not be indicated as
Disconnected Impervious Surface on the O&M Agreement Form.
- 1x original signed (in pen) & notarized hard copy of the Application. This item is required per Section VI, 1 and
15A NCAC 02H .1042(2)(a). The Application was signed in Section IX instead of the required Section X.
- 1x hard copy of the project narrative. This item is required per Section VI, 5.
- 1x hard copy of a USGS topographic map depicting the project location. This item is required per Section VI, 6
and 15A NCAC 02H .1042(2)(d).
- 2x hard copies of a full-sized plan sheet showing the following (NOTE: Only updated plan sheets need to be
provided):
o Wetland delineation for the site or a note on the plans that there are no wetlands located on -site. This
item is required per Section VI, 8m of the Application and 15A NCAC 02H .1042(2)(g)(iii). Please also list
the name of the individual that made this determination on the plans.
o Dimensioned project area boundary with bearings and distances. This item is required per Section VI, 8i
of the Application and 15A NCAC 02H .1042(2)(g)(ii). It was noted that the project area as shown in
Section IV, 7 and as shown on plan sheet C102 include the Stonewall Jackson Training School (which may
be covered under permit SW3131004 (you will need to check with the Mooresville Regional Office as
they have that permit on -file)). You can use a smaller subsection of the property (such as the park
boundary) for the project area.
NOTE: This is an administrative completeness review, not a detailed engineering review. While not required for
administrative completeness, the following items were noted during this review:
- The project does not appear to meet the requirements to be considered a low -density project (15A NCAC 02H
.1003(2)). Typically, piping on a low -density project is only allowed where unavoidable (such as passing
stormwater underneath a sidewalk/driveway via a culvert) and piping networks are almost always not allowed.
- The drainage area information for the project should be included in Section IV, 10. For a low -density project, the
"drainage area" is equal to the project area and there is no off -site drainage area.
- Please initial the items in Section VI that have been provided in the submission.
- Please list the county that the project is located in in Section I, 2 of the Application.
If these items are received within the stipulated timeframe, we can accept the project and begin the review process.
Once accepted, reviews under the standard permitting process generally take 30 — 45 calendar days, but can take up to
90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer
to 45 days than 30).
Hard copies should be mailed to the following address:
For Fed Ex/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
Jim Farkas
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral, & Land Resources — Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
(919) 707-3646
Jim. F arkas@ncdenr. gov
�ATy' C
EII�iViY! 6�IY1!
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
This message has originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links or responding to this email.