Loading...
HomeMy WebLinkAboutSW3220201_Plansheet C300 - Grading/Drainage Plan_20220425T,gBLES / / PICNIC \ \ 11 AREA \FLAG DISPLAY \ 'JUT 6 0. 6 j / / / / / / ` / .® GR/ I / / "Ii lLL \ i \ L SITE /Gy r / G P5 // / g1' / r /r // / // // // / // / I I I I I /65 UGE\\ UCE UGV� // / ,®r-N, /FLARED END/VICINITY MAP / / 3g' � / r / � C500 SECTION (TYP.)SCALE: 1'=4,000 //AREA INLET \ - -6SQ 1EXIST/NG ROTARY C501 (TYP.) J HARMONY PARK , ol // loll le, \ / I I \ I ® INV. 6 DISK GOLF \ (647.50 I TEE\ Io �Q � p 1 I I I I I ^' 47.44 / I I / TFMP CII T FFNCF /TVP 1 r I // I INV. OUT=641.80 642- 6" SOLID PVC -------- COLLECTOR.SEE DETAIL 5-0502 `\ 645.64 / / / I I r J I I I //° I II I / I DO NOT TRENCH IN SILT FENCE WITHIN THE DRIP LINES OF EXISTING TREES (TYP.) I / I EX/STING ' I/ IFORSESHC�E I / , PITS 11 1 / \ o 0.000 0 0 0 0 0 \ / PROJECT LIMITS \ 64' -648 LW :DCD \ 3� / II w I - - `D w GRADING AND DRAINAGE NOTES 1. EARTHWORK QUANTITIES HAVE NOT BEEN ESTIMATED AND SITE AS SHOWN IS NOT ASSUMED TO REPRESENT A BALANCED CUT/FILL CONDITION. 2. CONTRACTOR SHALL PERFORM HIS OWN ESTIMATES AND SHALL PROVIDE ALL EARTHWORK / NECESSARY TO ACHIEVE THE DESIGN GRADE, INCLUDING ANY OFFSITE BORROW OR SPOILS REQUIRED. �Sh 3. ROOF LEADERS SHALL BE SCH 40 PVC. MINIMUM COVER SHALL BE 18". MINIMUM SLOPE SHALL BE 1%. PROVIDE CLEANOUTS AT ALL CONNECTIONS WITH BUILDING DRAIN AND WHERE INDICATED. REFER TO ARCHITECTURAL DWGS. FOR THE EXACT LOCATION OF ROOF DRAINS AT THE BUILDING. 4. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE IN ALL GRADED AREAS, INCLUDING PAVING, LAWN AND LANDSCAPE AREAS. 5. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR I INSTRUCTION PRIOR TO PROCEEDING. 6. CONTRACTOR SHALL VERIFY LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING ASS \ 0 U WORK, BOTH PUBLIC AND PRIVATE. CONTRACTOR IS FULLY RESPONSIBLE FOR ALL o \ UNDERGROUND UTILITIES AND SHALL REPAIR ANY DAMAGE AS A RESULT OF THIS CONTRACT. �-I UT I I 7. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING La - I III GRADE. III c 8. THE PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN DRIVES, PARKING LOTS AND I II c SIDEWALKS ARE FINISHED ELEVATIONS INCLUDING ASPHALT. REFER TO PAVEMENT CROSS 0 m SECTION DATA TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 9. PROPOSED SPOT ELEVATIONS SHOWN REFER TO BOTTOM OF CURB UNLESS OTHERWISE NOTED I I ON PLAN. 10. PIPE LENGTHS SHOWN ARE THE ENGINEER'S ESTIMATE USED TO COMPUTE PIPE SLOPES AND _ INVERTS AND SHALL NOT BE CONSTRUED BY THE CONTRACTOR TO REPRESENT THE ACTUAL l QUANTITY OF PIPE REQUIRED. 11. CROSS SLOPE OF SIDEWALKS SHALL BE 2% (MAX). 12. SLOPES SHALL BE GRADED NO STEEPER THAN 3:1 EX/STING ASPHALT I 1�11 c 13. NO DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, BURIAL PITS, J IIII o TRENCHING OR OTHER LAND DISTURBING ACTIVITY ALLOWED IN THE TREE PROTECTION ZONE. PARKING LOT _ �y_ �I TREE BARRICADES MUST BE INSTALLED BEFORE ANY DEMOLITION, GRADING OR CONSTRUCTION BEGINS, AND NOT REMOVED UNTIL FINAL INSPECTION. 14. NO GRUBBING WITHIN TREE PROTECTION ZONE. LEAVE SOIL AND LEAF LITTER UNDISTURBED. SUPPLEMENT WITH 1-2 INCHES OF MULCH. RE -SEED WITH GRASS ONLY IN DISTURBED/GRADED I AREAS. I I 15. EXPOSED TREE ROOTS MUST BE CLEANLY CUT WITH A SHARP PRUNING TOOL; BACKFILL ASAP JJ III I TO MINIMIZE EXPOSURE TO THE AIR, I * _-- 16. UNLESS OTHERWISE NOTED, THE PHYSICAL CONNECTION TO THE DOWNSPOUTS INSTALLED IIII I BY THE ROOFING CONTRACTOR BETWEEN THE SITE ROOF DRAIN PIPE A SHALL BE MADE BY THE SITE GRADING CONTRACTOR. Imo- -- I \\\\\\\ \\\\ { I 17. PIPE LENGTHS SHOWN ON CULVERTS INCLUDE FLARED END SECTIONS. :D 18. IN ORDER TO ENSURE ADEQUATE DRAINAGE, FLOW LINES IN GUTTERS SHALL BE 0.50% MINIMUM. LEGEND WILLS F ILL IN, \ TABLES I \ / \ \ \ \ \ I _ IJ \ \\ \\ �`\ GRILL \ \ \ \ \ \ \\ EIS N� \ \ \ J PICNIC \ C: PICNIC \ AREA 3on -�-3en 3 ®GRILL Q TABLES GRILL w \ M \ \ / C: _D_ I \` M \_ STORM SEWER STRUCTURE & PIPE SCHEDULE UPSTREAM STR. UPSTREAM RIM EL. INVERTS) IN INVERT OUT DOWNSTREAM STR. D.S. PIPE LENGTH (FT) D.S. PIPE DIA (IN) D.S. PIPE MATERIAL D.S. PIPE SLOPE (FT/FT) FES 8 641.80 (12" - Al 7) FES 6 647.00 (12" - Al 5) Al 5 652.14 648.25 (12" - Al 4) 648.25 (12" - Al 3) 648.25 FES 6 89 12 0.014 Al 4 652.30 649.53 Al 5 41 12 Corrugated HDPE Pipe 0.031 Al 3 652.14 648.40 (12" - Al 2) 648.40 Al 5 28 12 Corrugated HDPE Pipe 0.005 Al 2 652.14 648.60 (12" - Al 1) 648.60 Al 3 28 12 Corrugated HDPE Pipe 0.007 Al 1 652.10 650.10 Al 2 31 12 Corrugated HDPE Pipe 0.048 Al 7 645.00 642.20 FES 8 66 12 0.006 EXISTING SIGN EIP EXISTING IRON PIN _1�t EXISTING LIGHT POLE CO-) EXISTING UTILITY POLE R/W RIGHT-OF-WAY HC\ ACCESSIBLE SPACE c" 1 EXISTING TREE TO REMAIN EXISTING FIRE HYDRANT (ev EXISTING WATER VALVE ®WM EXISTING WATER METER OO EXISTING SEWER MANHOLE OO EXISTING STORM MANHOLE EXISTING DRAINAGE STRUCTURE DI PROPOSED DRAINAGE STRUCTURE +XXX.X EXISTING SPOT ELEVATION XXX.XX PROPOSED SPOT ELEVATION o ° EXISTING CLEANOUT ODS EXISTING DOWNSPOUT EXISTING CURB AND GUTTER --� PROPERTY LINE -x-x-x- EXISTING FENCE UGE EXISTING UNDERGROUND ELECTRIC LINE OH/U EXISTING OVERHEAD UTILITY LINE T EXISTING UNDERGROUND TELEPHONE LINE FO/C EXISTING FIBER OPTIC LINE SS EXISTING SANITARY SEWER LINE W EXISTING WATER LINE G EXISTING GAS LINE - - XXX - EXISTING CONTOUR LINE XXX PROPOSED CONTOUR LINE TEMPORARY TREE PROTECTION BARRICADE EXISTING STORM DRAINAGE PIPE PROPOSED STORM DRAINAGE PIPE RD PROPOSED ROOF DRAIN PIPE EXISTING TREE LINE OGV EXISTING GAS VALVE ®GM EXISTING GAS METER Know what's below. Call before you dig. NORTH 20 0 10 20 40 SCALE: 1 "=20' 704.333.0093 C DESIGN INC. www.cdesigninc.com 0 W CL Cabarrus County Frank Liske Park 4001 Stough Rd Concord, NC 28027 Kyle Bilafer 704.920.3201 H J z �A enesc bh ZD U) Alfred Benesch & Company z 2359 Perimeter Pointe Parkway, Suite 350 0 Charlotte, NC 28208 0 www.benesch.com P 704.521.9880 Project # 17000392 Cnp�4lwhiNpir�rR Q �l(r�•'G.�71 / ,ice i LU �+ FAIGI r i copyright 2021, C DESIGN INC. U) Revision 1 z Site Furnishings and Conc. 0 Pavement Revisions W W Of Q J W PLAN NORTH z PROJECT NUMBER O DATE H Q Grading Plan 0 Z H W W 2 Cn C300 11.08.2021 0604-0522 10.28.2021