Loading...
HomeMy WebLinkAboutSite Inspection 4.25.22 Worley CoveWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20211508 TPB NCDOT - Tropical Storm Fred Storm Repairs Haywood TPB NCDOT - Tropical Storm Fred Storm Repairs NC DOT Division 14 - Sylva 4/25/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 48' 32''+35° 24' 43'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Worley Cove Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on April 25, 2022. Chris Barker was present during the inspection. The following are items that need attention: - Northeast side of new bridge - Recommend silt fence above bank stabilization. I did not communicate this to the inspector on site. NPDES records were up to date. Continue to add groundcover per NPDES stabilization timeframes. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20211508 4/25/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2