HomeMy WebLinkAboutSite Inspection 4.25.22 Worley CoveWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20211508
TPB NCDOT - Tropical Storm Fred Storm Repairs
Haywood
TPB NCDOT - Tropical Storm Fred Storm Repairs
NC DOT Division 14 - Sylva
4/25/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Road
maintenance/repair/improveme
ntsRegion:Asheville
Longitude:-82° 48' 32''+35° 24' 43''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Worley Cove
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on April 25, 2022. Chris Barker
was present during the inspection. The following are items that need attention:
- Northeast side of new bridge - Recommend silt fence above bank stabilization. I did not communicate this to the
inspector on site.
NPDES records were up to date. Continue to add groundcover per NPDES stabilization timeframes.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20211508
4/25/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2