Loading...
HomeMy WebLinkAboutWQCS00272_NOV-2022-DV-0090_20220420Mr. Robert Tankard Assistant Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ 943 Washington Square Mall Washington, NC 27889 April 20, 2022 Re: NOV-2022-DV-0090/Notice of Intent to Issue Civil Penalty Town of Edenton Collection System Permit # WQCS00272 Issued April 561, 2022 Dear Robert: RECEIVED/NCDENR/DWR APR 2 5 2022 Water Quality Regional Operations Section Washington Regional Office, In response to Notice of Violation 2022-DV-0090, please know that the Town of Edenton experienced a Sanitation Sewer Overflow (SSO) of 63,200 gallons on 03/29/2022. The cause of the sewer spill was due to a contractor boring under the roadway and penetrating the eight inch (8") force main. The sewer force main was mismarked while locating utilities in accordance with (outdated) sewer drawings obtained by Town personnel. This mis-marking of utilities also caused the leak to not be properly identified by staff until the morning of 03/30/2022. Communication and identification before and proceeding the sewer spill was not efficient in a matter that could have prevented the amount of the SSO. Remediation was prematurely started without informing DEQ of the cleanup plan. However, the eight inch (8") force main was shut down and repairs made on the morning of 03/30/2022. Remediation of the SSO was performed after concurrence with DEQ's approval of the cleanup plan on 3/31 & 4/1/22, the before and after pictures were provided to DEQ in the SSO five-day report. The Town is currently underway in using GIS application(s) to update all its water, sewer, and stormwater assets. The Town is also using GPR to help identify and update mapping depths. All mapping will be updated accordingly as these efforts continue. We believe this will greatly reduce or eliminate miss marking during locates. Public Works personnel exhausted all efforts in using its assets to assist in remediation of the SSO. This is evident after reviewing the before and after pictures of the spill area. Communication is a very important part of SSO reporting and remediation; and the Town of Edenton will do its part in preventing this from happening in the future. Sincer Core Allan Gooden Town Manager Cc: Chris Wharton, Edenton PW Director Brad Arnold, Edenton W&S Supervisor Printed on Recycled Paper P.O. BOX 300, Edenton N.C. 27932 - (252) 482-2155 (252) 482-7377 - FAX