HomeMy WebLinkAbout20220318 Ver 1_More Info Received_20220411We plan to plant 1 tree for every 1 tree
removed. We plan to remove 5=6 trees and
= replace them with a native hardwood off
the NC Water Quality list of native trees.
Q7 New trees will be planted within 60 days
�4�' of project completion.
J� The trees will be watered and maintained
p every week until it's matured.
�Q The construction corridor 8'x188'
R Q will be left with the pre -construction
\ topography. Silt fence will be lining the '
• lig ng site GV shoreline and the entire work area will be
(� laid with seed and straw to upon
Q + completion to prevent any erosion
Zone 1 (30')- Construction Corridor (1,664sgft)
to place riprap/ class B stone.
We will remove 5 dead trees.
:.a
Zone 2 (20')- Construction corridor
B'x20' (160sgft)
Remove 3 dead trees.
I
Place riprap/ class B stone
along the entire shoreline.
The riprap will be 188'x4'.
The sgft disturbance will b
376sgft below NWL
and 376sgft above NWL.